Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.7 LAccepted-AOC | L1 | Accepted-AOC Admitted | |
| 2 | L2₹33.9 L+₹13,579.92 (0.40%)Rejected-AOC MARATHANAMETHIL HOUSE THOTTILANGADI P O IRUVATTI 673639 | IRUVATTI | MALAPPURAM | KERALA | 673639 | L2 | Rejected-AOC Admitted |
Tender Value
₹32.1 L
EMD Value
₹50,000
Closing Date
25 Jun 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer,PWDBridges Division,Palakkad
O/O Executive Engineer,PWDBridges Division,Palakkad
GENERAL-Puthiyapalam-Urgent repair work to Puthiyapalam and repair work for Kalpathy bridge-General Civil Work-2
2024_PWD_674723_1
PWD/BR/TR/14189/2022_5_3_2/1
Open Tender
Civil Works - Bridges
Item Rate
180 days
GVC Puthiyapalam-Kalpathy Road in Palakkad LAC
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
Yes
23 Aug 2024
7 Jun 2024
28 Jun 2024
7 Jun 2024
25 Jun 2024
7 Jun 2024
Amount
Bridge Repair-Puthiyapaalam
OD260275/2023-2024:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .
OD16304/2024-2025:Removing damaged concrete: Loose and delaminated concrete shall be identified and marked before proceeding with the removal. The loose cover concrete including the loose damaged concrete shall be removed upto beyond the corroded bars to a minimum depth of 10 mm behind the reinforcement. Only affected concrete shall be removed and conducting proper investigation, (Good & sound concrete should not be chipped / damaged) by chipping / hacking with chisel and hammer or by mechanical means like light weight chisel hammer, pneumatic chippers, making saw cut at periphery to avoid feather edge for all height and removal and disposal of debris at designated location including all material, labour, tools, temporary supports for structures, electricity, plant and machineries etc. complete as directed by Engineer-in-charge and/or Consultant. Depth of chipping may vary from 20 to 100 mm
OD19865/2024-2025:Rust remover/Rust Convertor: Cleaning of rust / scales / corrosion from reinforcement bars should be carried out using acid based rust remover, Reebakleens RR of Fosroc or equivalent, or using alkali based rust converters such as Feovert of Krishna Conchem. The material is to be applied to the rusted metal bar, using brush and leaving it to dry for 30 Min. & washing surface with fresh water as required to exposed reinforcement bar at all heights, including all material, labour, tools, temporary supports for structures, electricity, plant and machineries complete as per detail specification and as directed by Engineer-in-charge and/or Consultant. The concrete surface area containing the cleaned rebars shall be measured for payment.
OD18893/2024-2025:Anti Corrosive treatment to Steel:Providing & applying inhibition coats/system to exposed reinforcement bars & also new bars, after cleaning & removing scales and rust completely as specified in 1.4, Two component inhibitor Nitozinc Primer std. of Fosroc or MasterEmaco P130 of BASF or equivalent having specific gravity of 1.75 and solid content 57(+/-3) Adhesive bond strength > 1.5 N/mm2, 40 microns DFT per coat as approved by Engineer-in-charge and/or Consultant shall be used as per manufacturer?s specification in two coats at all heights, including all material, labour, tools, temporary supports for structures, electricity, plant and machineries, necessary surface preparation and necessary protection after and during work. The concrete surface area contianing the rebars where the treatment is carried out shall be considered for measurement.
OD18894/2024-2025:New/Additional steel Reinforcement: Supplying, cutting, fabricating new reinforcement Fe500 for Jacketing, and providing additional steel reinforcement to compensate corroded reinforcement in existing member etc. and fixing with old existing reinforcement which was reduced to 15 % or more of its original diameter as required as provided in original structure and additional steels as directed by EIC and/ or consultant as required tying with 16 gauge annealed binding wire complete as per drawing and specifications for all heights including all material, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete as directed by Engineer-incharge and/or consultant (TMT BARS of various size as required)
OD18895/2024-2025:Anchoring mainsteel and stirrups: Drilling holes of min 4mm larger than new rebar diameter into existing concrete substrate for anchoring of new rebar and depth of Min. 10 times the diameter of rebar and fixing with anchor resin grout Lokfix E (35/55/75) series or Lokfix P or Emfix or chemical anchor material or Masterflow 935 of BASF or equivalent as per NF P 18-831 and NF P 18-836 including cleaning, cutting, fabricating, chemicals, material, labour, tools, temporary supports for structures, electricity, plant and machineries etc. complete as directed by Engineer-in-chargeand/or consultant for all heights
OD18896/2024-2025:Anchoring Steel & Shear Connectors: Drilling holes into existing concrete structure for anchoring of new rebar with 10 mm dia. shear connectors at 0.5 Mt. c/c (or as per design recommendation) and fixing with anchor resin grout Lokfix P / Lokfix E 75/55/35 series or Emfix or pure epoxy resin based cartridge form chemical anchor material or Masterflow 935 of BASF or equivalent as per NF P 18-831 and NF P 18- 836. Drilling hole for diameter: 14 mm, Drilling hole for depth: 100 mm including cleaning, cutting, fabricating, chemicals, material, labour, tools, temporary supports for structures, electricity, plant and machineries etc. complete as directed by Engineer-in-charge and/or consultant for all heights
OD38204/2024-2025:Galvanic Sacrificial Prevention of steel by Point anodes: Providing and fixing sacrificial zinc anode to prevent initialization of corrosion of reinforcement in adjoining sound concrete due to chloride ingress by installing anodes from VECTOR Galvashield XPI or equivalent for patches at Min. 2 to 4 anodes / Sq.mt. area of concrete (spacing of 300 to 700mm), as per manufacturer specification, covered with mortar with of resistivity less than of parent concrete on the cleaned reinforcement steel including design from manufacturer, installation of Monitoring Box to measure current thrown by Anode as per IS 12696 in range of 0.2 to 2mA/ sq.mt as per manufacturers specification before applying passivation coating at all heights and including of all material, labour, tools, temporary supports for structures, plant and machineries, etc. complete as directed by Engineer-in-charge and/or consultant.( for slabs)
OD38233/2024-2025:Galvanic anodes for sound but contaminated concrete: Providing and fixing sacrificial zinc anodes to control the ongoing corrosion of the embedded steel bars by installing anodes from Vector Galvashield XPI at a spacing of 400 as per the manufacturer's/consultant's specification covered with mortar with of resistivity less than of parent concrete on the cleaned reinforcement steel as per manufacturers specification before applying passivation coating at all heights and including of all material, labour, tools, temporary supports for structures, electricity, plant and machineries, etc. complete as directed by Engineerin- charge and/or consultant. Paymenet shall be made per nos of the anode installed.( For girders)
OD18897/2024-2025:Injection Grouting-Cement polymer Cement: Providing and fixing Injection ports/nozzles at honeycombed area, cracks in CC, joints of channel and/or in staggered manner on all sides of Member at @ 0.5-0.75 M c/c spacing after drilling holes, to facilitate injecting cement-polymer grout, using quick setting material or epoxy putty and providing and executing injection / pressure grouting in prefixed nozzles/ports using Cement polymer grout (Cement : Polymer ) in proportion of (50:5) with non-shrink admixture Cebex 100 or equivalent and adding water for required consistency till no further grout is accepted by ports using grout pump, at all heights including all material, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete as directed by Engineer-in-charge and/or consultant.
OD18898/2024-2025:Epoxy Injection Grouting: Providing and executing injection/pressure grouting in cracks in the parent concrete by fixing PVC perforated nozzles at 150 mm to 200 mm distance or specified distances as per design and detailed specifications. Pressure grouting using low viscous epoxy grout Conbextra EP10M of Fosroc or Masterinject 1315 of BASF or Shaligroput EI or equivalent having mix density 1050 kg/m3, Compressive Strength (ASTM D695)->50 N/mm2,Tensile Strength (ASTM C 304-97)- 18 N/mm2, Flexural strength(BS 6319 Part 4)-45 N/mm2 Pressure grouting shall be done at required pressure at all heights, including all material, labour, tools, temporary supports for structures, plant and machineries, curing etc. complete as directed by Engineer-in-charge and/or consultant.
OD42293/2024-2025:Polymer Modified Mortar (Pre-Packed): Providing and Applying single component, high strength, fibre reinforced, thixotropic cementitious patch repair mortar that achieves compressive strength minimum of 15 MPa at 1 day and 45 MPa at 28 days and capable of applying upto 50mm thick in single layer such as Renderoc SP40 of Fosroc or Master Emaco S 348 of BASF or equivalent, to the prepared concrete area for thickness up to 50mm, after applying epoxy resin based bonding coat as per manufacturer?s specification, before the bonding agent becomes tack free, initially by hand and finally finishing the same with trowel carefully compacting the same around the rebar and finishing to bring it in line with existing concrete surface on the columns, slabs, beam etc. at all heights, where the thickness of application is less than 50 mm in patches as per specification . Item rate is inclusive of all material including the bond coat, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete and as directed by Engineer-in-charge and/or consultant. (Payment to be made in Sq.M for thickness upto 50mm of PMM for patch area repaired)
OD29012/2024-2025:Microconcrete Reinstatement for thickness more than 50mm for RCC members:- Providing and laying of special repair material micro-concrete for reinstatement of members having thickness of repair more than 50mm and jacketing, using Single component, high strength, high flow cementitious micro-concrete having compressive strength minimum of M40 at 28 days such as MasterEmaco 346 or Renderoc RGL / RGS of Fosroc or equivalent, blended with washed saturated surface-dry (SSD), graded, low absorption, high density, aggregates of size 3mm to 10mm at 50% by weight of micro concrete (if thickness is 100mm or more) and water as per data sheet and pouring into the shuttering if required than use birds beak type form work using suitable arrangement or if required using pumping device for uniform flow of Microconcrete. The side shuttering can be removed after Minimum of 24 hours, preferably 3 days and the bottom shuttering after 7 days ensuring proper bond between the micro concrete and existing concrete substrate at all heights, including all material, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete as directed by Engineer-in-charge and/or consultant. (Payment shall be made in Sq.M for thickness upto 100mm of Microconcrete of area repaired, ) including shuttering work (Only steel reinforcement shall be paid in other relevant items)
13.5.G.P.1:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M30 - Using concrete Mixer - Height upto 5m
13.2:Pointing with cement mortar (1:3) on brick work in substructure as per Technical Specifications
OD43926/2024-2025:Sand blasting for cleaning the surface of concrete and reinforcement . Sand blasting is done by spraying dry coarse sand to the spalled concrete surface under high pressure to get a fresh surface, as per the instruction of engineer in charge.
13.3:Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications
Bridge Repair -Kalpathy old bridge
OD29558/2024-2025:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .
OD29560/2024-2025:Removing damaged concrete: Loose and delaminated concrete shall be identified and marked before proceeding with the removal. The loose cover concrete including the loose damaged concrete shall be removed upto beyond the corroded bars to a minimum depth of 10 mm behind the reinforcement. Only affected concrete shall be removed and conducting proper investigation, (Good & sound concrete should not be chipped / damaged) by chipping / hacking with chisel and hammer or by mechanical means like light weight chisel hammer, pneumatic chippers, making saw cut at periphery to avoid feather edge for all height and removal and disposal of debris at designated location including all material, labour, tools, temporary supports for structures, electricity, plant and machineries etc. complete as directed by Engineer-in-charge and/or Consultant. Depth of chipping may vary from 20 to 100 mm
OD42497/2024-2025:Microconcrete Reinstatement for thickness more than 50mm for RCC members:- Providing and laying of special repair material micro-concrete for reinstatement of members having thickness of repair more than 50mm and jacketing, using Single component, high strength, high flow cementitious micro-concrete having compressive strength minimum of M40 at 28 days such as MasterEmaco 346 or Renderoc RGL / RGS of Fosroc or equivalent, blended with washed saturated surface-dry (SSD), graded, low absorption, high density, aggregates of size 3mm to 10mm at 50% by weight of micro concrete (if thickness is 100mm or more) and water as per data sheet and pouring into the shuttering if required than use birds beak type form work using suitable arrangement or if required using pumping device for uniform flow of Microconcrete. The side shuttering can be removed after Minimum of 24 hours, preferably 3 days and the bottom shuttering after 7 days ensuring proper bond between the micro concrete and existing concrete substrate at all heights, including all material, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete as directed by Engineer-in-charge and/or consultant. (Payment shall be made in Sq.M for thickness upto 100mm of Microconcrete of area repaired, ) including shuttering work (Only steel reinforcement shall be paid in other relevant items)
OD42498/2024-2025:Polymer Modified Mortar (Pre-Packed): Providing and Applying single component, high strength, fibre reinforced, thixotropic cementitious patch repair mortar that achieves compressive strength minimum of 15 MPa at 1 day and 45 MPa at 28 days and capable of applying upto 50mm thick in single layer such as Renderoc SP40 of Fosroc or Master Emaco S 348 of BASF or equivalent, to the prepared concrete area for thickness up to 50mm, after applying epoxy resin based bonding coat as per manufacturer?s specification, before the bonding agent becomes tack free, initially by hand and finally finishing the same with trowel carefully compacting the same around the rebar and finishing to bring it in line with existing concrete surface on the columns, slabs, beam etc. at all heights, where the thickness of application is less than 50 mm in patches as per specification . Item rate is inclusive of all material including the bond coat, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete and as directed by Engineer-in-charge and/or consultant. (Payment to be made in Sq.M for thickness upto 50mm of PMM for patch area repaired)
OD45447/2024-2025:Injection Grouting-Cement polymer Cement: Providing and fixing Injection ports/nozzles at honeycombed area, cracks in CC, joints of channel and/or in staggered manner on all sides of Member at @ 0.5-0.75 M c/c spacing after drilling holes, to facilitate injecting cement-polymer grout, using quick setting material or epoxy putty and providing and executing injection / pressure grouting in prefixed nozzles/ports using Cement polymer grout (Cement : Polymer ) in proportion of (50:5) with non-shrink admixture Cebex 100 or equivalent and adding water for required consistency till no further grout is accepted by ports using grout pump, at all heights including all material, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete as directed by Engineer-in-charge and/or consultant.
OD42500/2024-2025:Epoxy Injection Grouting: Providing and executing injection/pressure grouting in cracks in the parent concrete by fixing PVC perforated nozzles at 150 mm to 200 mm distance or specified distances as per design and detailed specifications. Pressure grouting using low viscous epoxy grout Conbextra EP10M of Fosroc or Masterinject 1315 of BASF or Shaligroput EI or equivalent having mix density 1050 kg/m3, Compressive Strength (ASTM D695)->50 N/mm2,Tensile Strength (ASTM C 304-97)- 18 N/mm2, Flexural strength(BS 6319 Part 4)-45 N/mm2 Pressure grouting shall be done at required pressure at all heights, including all material, labour, tools, temporary supports for structures, plant and machineries, curing etc. complete as directed by Engineer-in-charge and/or consultant.
GENERAL REPAIR WORKS
OD37167/2024-2025:Engaging man/coolie for site clearance and other works of inspection.
OD37972/2024-2025:Scrapping and cleaning old painted surface with sand paper, wire brush, coir brush etc including removal of all kind of fungus / mess, dirty and shabby look patches and any kind of old paint from the wall surface and make the surface fit for applying new coat of paint including labour charges etc
14.16:Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm.
OD43718/2024-2025:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a static roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method
OD43719/2024-2025:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers in sub- base / base course on well prepared surface and compacting to achieve the desired density.
OD43720/2024-2025:Filling up potholes with bituminous ready mix compound(25kg bag) including of cost of material and transportation to site etc.
OD44069/2024-2025:Providing and fixing drainage sprout pipe 110mm pvc 6kgf/cm2 pipe over GI channel rail 8 mm thredded rod, sleeve, anchor bolt , nut, washers, U-bolt 110mm for fixing drainage sprout pipe 110mm pvc 6kgf/cm2 including all cost conveyance and labour charges etc., complete as per the direction of site Engineer.
14.1B.1.1.A:Furnishing and Placing Reinforced Cement Concrete Grade M25 Using Concrete Mixer as per drawing and Technical Specification. For solid slab super-structure - Height upto 5m
14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
ABDUSALAM
Bidder Name
MOHAMMED KAYANIKKARA
ABDUSALAM
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .