Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹89,000
Closing Date
28 Sept 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer REW Ganderbal
Executive Engineer REW Ganderbal
Construction of P Bund near H/O Ab Gani Lone at Dard patiHalqaWussanA Block Kangan
2021_RDPR_138511_19
e-NIT No.47/2021-22
Open Tender
Chemicals/Minerals
Item Rate
30 days
RD and PR Ganderbal
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
Yes
Executive Engineer REW Ganderbal
Exempted
29 Sept 2021
10 Sept 2021
29 Sept 2021
10 Sept 2021
28 Sept 2021
10 Sept 2021
120 days
Amount
Earth work in excavation in trenches by manual means for foundation drains pipes etc not exceeding 1.5 Mtr in width upto required depth ( all kinds of strata) including dewatering of trenches if required during execution and disposal of excavated earth beyond 50 Mtrs or as directed by incharge engineer at site,disposed earth is to be levelled and neatly dressed.
Supply and laying of stone soling (hand packed ) in trenches of foundation including consolidation watering and ramming and all consequential and incidental costs like all leads,lifts,carriages but excluding head load by manual labour or by ponnies.
P/L in position cement concrete of specified grade of reinforced cement concrete in 1:3:6 (1 cement:3 coarse sand : 6 graded stone aggregate 40mm nominal size) excluding the cost of centering, shuttering, finishing but including cost and carriages of all materials involved but excluding head load by manual labour or ponnies.
centering and shuttering including strutting,propping etc and removal of forms including all consequential and incidental costs like all leads,lifts,carriages and scaffolding etc complete job.
12mm cement plaster in 1:6 (1 cement: 6 fine sand)
Felling of trees of the girth ( measured at a height of 1m above ground level) including cutting of trunk and branches,removing of materials. Beyond 30cm girth upto and including 60cm girth).
Photographs/Signboard.
mohammad ibrahim raina
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .