Loading…
Loading…
Tender ID
Tender Value
₹48.7 L
EMD Value
₹49,000
Closing Date
5 Mar 2026, 6:00 pmClosed
Executive Engineer Ukai Division No.1, Ukai
Construction of New Foot Bridge at Ch.9330 mtr and Ch.14700 mt on Ukai Left Bank High level Canal.
279081
E Tender Notice No.32 of 2025-26
Open
Civil - All
Works
Tapi
8 documents required · 8 mandatory
₹1,500
Yes
Executive Engineer Ukai Division No.1,Ukai
₹49,000
Yes
20 Feb 2026
20 Feb 2026
20 Feb 2026
5 Mar 2026
20 Feb 2026
Name of work :- Construction of New Foot Bridge at Ch.9330 mtr and Ch.14700 mt on Ukai Left Bank High level Canal.
Item No. Quantities
estimated but Estimated Rates
Item of work Unit Total Amount.Rs
Item of work Unit Total Amount.Rs
or less Rs. In words
Item No.1 Removing of exiting disturbed C.C. Block
lining including opening of joints, stacking the same and Rupees Twenty Nine and Paise Ten
disposing of stuff as directed etc. complete with all leads
Item No.2 Excavation for foundation in hard murrum
including depositing the excavated stuff as and where
directed including back filling the tranches with suitable
Rupees Four Hundred Sixty Seven
2.0 33.00 excaveted stuff Etc. complete for lead up to 50 m and 467.20 m3
lift as under (manuly without dewatering). and paise Twenty Only.
(b) Lift 1.5 m. To 3.00 m.
Item No.3 Providing and placing in position
reinforcement bars including cutting, bending welding,
joints where necessary, hooking etc. complete as per Rupees Seven Thousand One
drawing for all lead and lifts. Hundred Ninety Four Only
Item No.4:- Providing and laying Plain/Reinforced
ordinary portland cement concrete of various grade with
cement,sand and coarse aggregate including centering,
shuttering, batching, mixing, transporting, placing,
vibracting, smooth finishing, curing etc complete for all
lead and lift.(Manual with conventional mixer,Excluding
(B) Raft, Bottom slab of barel, footing of columns, Rupees Four Thousand Three
2.40 piers, abutment and bottom slab of sump etc. (i) M-15 4398.20 Hundred Ninety Eight and Paise m3
grade Twenty Only
(C) Piers, abutment, wingwalls, Head walls, returnwall Rupees Four Thousand Seven
22.00 etc. 4762.90 Hundred Sixty Two and Paise m3
(iii) M-20 grade Ninety Only
Item No.5:- Providing and laying plain /reinforced
cement concrete lining of M 15 grade in bed, side
slopes and curvature including batching, mixing,
Rupees Four Hundred Eighty Five
5.0 200.00 transporting placing, smooth finishing, curing 485.70 m2
and Paise Seventy Only
including dewatering where required.( machinary
based with Paver). (b) 10.0cm thick lining in Bed &
Item No.6:- Providing & fixing in position structural
steel/ chequered plate including fabrication by Rupees Ninety Nine Thousand
cutting welding and one coat of oxide both side etc.
Seventy Nine Only.
Item No.7:- Providing videography on the ocassion
of function or for on going construction work Rupees One Thousand Two
7.0 2.00 including dubbing, titeling etc. complete including 1230.51 Hundred Thirty and paise Fifty 4 Hrs.
cost of cassette/CD (b) up to 4.00 hours One Only.
Item No.8:- Providing & fixing in position sign
board of standard size of 1.20mx0.90m with M.S
angle 40mmx40mmx6mm with 3mm thick iron plate
including fixing in 1:5:10 prop. Concrete block size Rupees Three Thousand Eleven and
40cmx40cmx75 cm including painting existing data paise Thirty Only.
on the board etc. complete as directed.
I/We am/are willing to carry out the work at _______________% above/bellow percent (should be written in figures and words) of the estimated rates mensioned
above. Amount of my/our tender works out as under.
· Estimated amount Estimated amount
Put to tender Rs______________________ Put to tender Rs______________________
*( Please strike out whichever is not applicable).
Note 1- All works shall be carried out as per Public Work Department Hand book and other specification of the Division or as directed
Note 2- All the columns in Schedule should be filled in ink and the total entries in the last column should be struck by the contractor under his signature.
Note 3- Rates quoted included clearance of site (Prior commencement of work and at its close) in all respect and hold good for work under all cocition,
site, moisture, weather etc.
Note 4- To be continued on additional sheet, if found necessary.
Deputy Executive Engineer, Executive Engineer
Ukai sub dn no.A/4 Ukai .Dn No.1
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD foot bridge 9330 and 14700.pdf
Schedule -B FB 9330 and 14700.pdf
E Tender Notice No.32 of 2025-26 upload.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .