CE/TP-II/Trichy
Chief Engineer TP-II Periyamilaguparai, Trichy-620 001.
Repairing and reconditioning of 400 KV 230 KV class sick/ healthy Auto/ Power transformers of various capacities available within the region of TP-II/Trichy for a period of two years
2024_EB_429883_1
CE/TP-II/TRY/E-11/23-24
Open Tender
Electrical Works
120 days
Anywhere in Tamilnadu
As per specification
4 documents required · 4 mandatory
₹0
₹19.8 L
Yes
29 Jun 2024
23 Feb 2024
5 Apr 2024
23 Feb 2024
4 Apr 2024
23 Feb 2024
ABSTRACT
Supply of materials & Labour Charges for 50 MVA 230 KV class Auto/Power Transformer
Supply of materials & Labour Charges for 100 MVA 230 KV class Auto/Power Transformer
Supply of materials & Labour Charges for 160 MVA 230 KV class Auto/Power Transformer
Supply of materials & Labour Charges for 200 MVA 400 KV class Auto/Power Transformer
Supply of materials & Labour Charges for 315 MVA 400 KV class Auto/Power Transformer
ABIRAMI ENGINEERING
K K Rao Engineering Works Pvt Ltd
ABIRAMI ENGINEERING
K K Rao Engineering Works Pvt Ltd
SHREE ABIRAMI ENGGINEERING WORKS
ABIRAMI ENGINEERING
ABIRAMI ENGINEERING
K K Rao Engineering Works Pvt Ltd
SHREE ABIRAMI ENGGINEERING WORKS
ABIRAMI ENGINEERING
ABIRAMI ENGINEERING
K K Rao Engineering Works Pvt Ltd
SHREE ABIRAMI ENGGINEERING WORKS
ABIRAMI ENGINEERING
ABIRAMI ENGINEERING
K K Rao Engineering Works Pvt Ltd
SHREE ABIRAMI ENGGINEERING WORKS
ABIRAMI ENGINEERING
ABIRAMI ENGINEERING
K K Rao Engineering Works Pvt Ltd
SHREE ABIRAMI ENGGINEERING WORKS
K K Rao Engineering Works Pvt Ltd
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
Charges for transporting transformer along with accessories from the site to the firm's works
Charges for transporting transformer along with accessories from the site to the firm's works
Charges for transporting transformer along with accessories from the site to the firm's works
Insulating materials
Insulating materials
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid