| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-Finance | ₹1.4 L | L1 | Accepted-Finance ok |
| 2 | L2₹2.1 L+₹64,949.37 (46.2%)Accepted-Finance | ₹2.1 L+₹64,949.37 (46.2%) | L2 | Accepted-Finance ok |
| 3 | Rejected-Technical | - | - | Rejected-Technical Document not complied |
Tender Value
₹1.7 L
EMD Value
₹3,462
Closing Date
3 Aug 2026, 6:00 pmClosed
DFO Nowshera
O/o DFO Nowshera
Planting of Poly Bagged Plants 5900 Nos. in already established closures during different previous years for their restocking under CAMPA at 05 Nos. of different locations in Sunderbani and Nowshera Range, Nowshera Forest Division under CAMPA
2026_FD_318371_1
e-NIT-18 of 2026-27
Open Tender
Civil Works - Others
Percentage
30 days
Sunderbani range
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
DFO Nowshera
₹3,462
21 Aug 2026
28 Jul 2026
4 Aug 2026
28 Jul 2026
3 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Fencing us | |||||
| 1.01 | Location No 01: Closure in Co. 75/D Nahoti of 2012-13 Planting of Polybag plants in pits of size 45cmx 45cmx 45cm: Transportation of saplings from nursery of Nowshera Forest Division to the above work site then site clearance, digging of pits of 45cmx 45cmx 45cm including excavation of soil and planting of saplings/seedlings in the pits, refilling with clean surface soil after planting with provision for water harvesting structure and maintenance for period of three month including all carriage upto site of closure, loading, unloading and labour charges, as per scope of work with all operations complete | - | Nos. | 1 | - |
| 1.02 | Location 02: Closure in Co. 122/D Nad of 2011-12 Planting of Polybag plants in pits of size 45cmx 45cmx 45cm: Transportation of saplings from nursery of Nowshera Forest Division to the above work site then site clearance, digging of pits of 45cmx 45cmx 45cm including excavation of soil and planting of saplings/seedlings in the pits, refilling with clean surface soil after planting with provision for water harvesting structure and maintenance for period of three month including all carriage upto site of closure, loading, unloading and labour charges, as per scope of work with all operations complete | - | Nos. | 1 | - |
| 1.03 | Location 03: Closure in Co. 150/D Peli of 2014-15 Planting of Polybag plants in pits of size 45cmx 45cmx 45cm: Transportation of saplings from nursery of Nowshera Forest Division to the above work site then site clearance, digging of pits of 45cmx 45cmx 45cm including excavation of soil and planting of saplings/seedlings in the pits, refilling with clean surface soil after planting with provision for water harvesting structure and maintenance for period of three month including all carriage upto site of closure, loading, unloading and labour charges, as per scope of work with all operations complete | - | Nos. | 1 | - |
| 1.04 | Location No. 04: Closure in Co. 150/D Peli of 2018-19 Planting of Polybag plants in pits of size 45cmx 45cmx 45cm: Transportation of saplings from nursery of Nowshera Forest Division to the above work site then site clearance, digging of pits of 45cmx 45cmx 45cm including excavation of soil and planting of saplings/seedlings in the pits, refilling with clean surface soil after planting with provision for water harvesting structure and maintenance for period of three month including all carriage upto site of closure, loading, unloading and labour charges, as per scope of work with all operations complete | - | Nos. | 1 | - |
| 1.05 | Location No. 05: Closure in Co. 120/N Badetar 2019-20 Planting of Polybag plants in pits of size 45cmx 45cmx 45cm: Transportation of saplings from nursery of Nowshera Forest Division to the above work site then site clearance, digging of pits of 45cmx 45cmx 45cm including excavation of soil and planting of saplings/seedlings in the pits, refilling with clean surface soil after planting with provision for water harvesting structure and maintenance for period of three month including all carriage upto site of closure, loading, unloading and labour charges, as per scope of work with all operations complete | - | Nos. | 1 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
BOQ_1048488.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .