Loading…
Loading…
Tender Value
₹45.3 L
EMD Value
₹90,700
Closing Date
11 Mar 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
TRACTION
14 conditions · 3 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
All the bidder/Tenderers should ensure that they are GST compliant
Guntakal Division: OHE modification works in connection with the proposed construction of Road Over Bridge in lieu of manned LC 201 @km 508/7-8 in Kuppagal Yard and manned LC 207 @km 529/3-4 in Iranagallu Yard.
GTL-TRD-29-eTN-86-2025-26
GTL-TRD-29-eTN-86-2025-26
Open
Works - General
12 Months
Anantapur, Andhra Pradesh
₹0
₹90,700
11 Mar 2026
18 Feb 2026
25 Feb 2026
94 items across 13 schedules · ₹45,32,165.5 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Supply & Erection | Per Track KM | 10.00 | 20,066 | 2,00,660 |
| 2 | Erection/ Labour | MT | 3.00 | 3,465 | 10,395 |
| 3 | 32/3(a)-Extra Rate for Erection Under Power Block | MT | 3.00 | 3,465 | 10,395 |
| 4 | Erection/ Labour | MT | 6.25 | 15,267 | 95,418.75 |
| 5 | 32/3(b)-Extra Rate for Erection Under Power Block | MT | 6.25 | 15,267 | 95,418.75 |
| 6 | Supply/Material | Each | 2.00 | 9,331 | 18,662 |
| 7 | Erection/ Labour | Each | 2.00 | 1,120 | 2,240 |
| 8 | 32/3(e)-Extra Rate for Erection Under Power Block | Each | 2.00 | 1,120 | 2,240 |
| 9 | Supply/Material | Each | 12.00 | 12,114 | 1,45,368 |
| 10 | Erection/ Labour | Each | 12.00 | 1,080 | 12,960 |
| 11 | 32/4(a)(i)-Extra Rate for Erection Under Power Block | Each | 12.00 | 1,080 | 12,960 |
| 12 | Erection/ Labour | Each | 1.00 | 1,619 | 1,619 |
| 13 | 32/4(a)(ii)-Extra Rate for Erection Under Power Block | Each | 1.00 | 1,619 | 1,619 |
| 14 | Supply/Material | Each | 1.00 | 70,583 | 70,583 |
| 15 | Erection/ Labour | Each | 1.00 | 4,000 | 4,000 |
| 16 | 32/8(a)(v)-Extra Rate for Erection Under Power Block | Each | 1.00 | 4,000 | 4,000 |
| 17 | Erection/ Labour | Each | 1.00 | 185 | 185 |
| 18 | Supply/Material | Each | 2.00 | 4,444 | 8,888 |
| 19 | Erection/ Labour | Each | 2.00 | 956 | 1,912 |
| 20 | 32/8(b)(i)-Extra Rate for Erection Under Power Block | Each | 2.00 | 956 | 1,912 |
| 21 | Supply/Material | Each | 2.00 | 8,201 | 16,402 |
| 22 | Erection/ Labour | Each | 2.00 | 1,120 | 2,240 |
| 23 | 32/8(b)(ii)-Extra Rate for Erection Under Power Block | Each | 2.00 | 1,120 | 2,240 |
| 24 | Supply/Material | Each | 2.00 | 1,859 | 3,718 |
| 25 | Erection/ Labour | Each | 2.00 | 711 | 1,422 |
| 26 | 32/11(a)(i)-Extra Rate for Erection Under Power Block | Each | 2.00 | 711 | 1,422 |
| 27 | Supply/Material | Each | 1.00 | 2,022 | 2,022 |
| 28 | Erection/ Labour | Each | 1.00 | 494 | 494 |
| 29 | 32/11(a)(ii)-Extra Rate for Erection Under Power Block | Each | 1.00 | 494 | 494 |
| 30 | Supply/Material | Each | 4.00 | 756 | 3,024 |
| 31 | Erection/ Labour | Each | 4.00 | 356 | 1,424 |
| 32 | 32/15(a)-Extra Rate for Erection Under Power Block | Each | 4.00 | 356 | 1,424 |
| 33 | Supply/Material | Each | 10.00 | 2,126 | 21,260 |
| 34 | Erection/ Labour | Each | 10.00 | 680 | 6,800 |
| 35 | 32/15(b)-Extra Rate for Erection Under Power Block | Each | 10.00 | 680 | 6,800 |
| 36 | Supply/Material | Each | 11.00 | 833 | 9,163 |
| 37 | Erection/ Labour | Each | 11.00 | 304 | 3,344 |
| 38 | Erection/ Labour | Each | 11.00 | 107 | 1,177 |
| 39 | Erection/Labour | Each | 12.00 | 1,870 | 22,440 |
| 40 | 32/31(a)-Extra Rate for Erection Under Power Block | Each | 12.00 | 1,870 | 22,440 |
| 41 | Erection/Labour | Set | 2.00 | 2,558 | 5,116 |
| 42 | 32/31(e)-Extra Rate for Erection Under Power Block | Set | 2.00 | 2,558 | 5,116 |
| 43 | Erection/Labour | Each Span | 40.00 | 2,286 | 91,440 |
| 44 | 32/31(g)-Extra Rate for Erection Under Power Block | Each Span | 40.00 | 2,286 | 91,440 |
| 45 | Erection/Labour | Each | 2.00 | 589 | 1,178 |
| 46 | 32/31(j)(ii)-Extra Rate for Erection Under Power Block | Each | 2.00 | 589 | 1,178 |
| 47 | Erection/Labour | Each | 4.00 | 3,062 | 12,248 |
| 48 | 32/31(k)(i)-Extra Rate for Erection Under Power Block | Each | 4.00 | 3,062 | 12,248 |
| 49 | Erection/Labour | Each | 2.00 | 4,376 | 8,752 |
| 50 | 32/31(k)(ii)-Extra Rate for Erection Under Power Block | Each | 2.00 | 4,376 | 8,752 |
| 51 | Erection/Labour | Each | 3.00 | 11,520 | 34,560 |
| 52 | 32/31(l)(i)-Extra Rate for Erection Under Power Block | Each | 3.00 | 11,520 | 34,560 |
| 53 | Erection/Labour | Each | 2.00 | 524 | 1,048 |
| 54 | 32/31(n)-Extra Rate for Erection Under Power Block | Each | 2.00 | 524 | 1,048 |
| 55 | Erection/Labour | MT | 1.00 | 5,359 | 5,359 |
| 56 | 32/31(p)-Extra Rate for Erection Under Power Block | MT | 1.00 | 5,359 | 5,359 |
| 57 | Erection/Labour | MT | 2.00 | 709 | 1,418 |
| 58 | 32/31(s)-Extra Rate for Erection Under Power Block | MT | 2.00 | 709 | 1,418 |
| 59 | Erection/Labour | Each | 1.00 | 2,542 | 2,542 |
| 60 | 32/31(t)(i)-Extra Rate for Erection Under Power Block | Each | 1.00 | 2,542 | 2,542 |
| 61 | Erection/Labour | Each | 14.00 | 140 | 1,960 |
| 62 | 32/31(t)(iv)-Extra Rate for Erection Under Power Block | Each | 14.00 | 140 | 1,960 |
| 63 | Erection/Labour | Each | 2.00 | 515 | 1,030 |
| 64 | 32/31(t)(v)-Extra Rate for Erection Under Power Block | Each | 2.00 | 515 | 1,030 |
| 65 | Erection/Labour | Each Span | 24.00 | 4,376 | 1,05,024 |
| 66 | 32/31(t)(ix)-Extra Rate for Erection Under Power Block | Each Span | 24.00 | 4,376 | 1,05,024 |
| 67 | Erection/Labour | Each | 11.00 | 145 | 1,595 |
| 68 | Erection/Labour | MT | 13.00 | 140 | 1,820 |
| 69 | Erection/Labour | MT | 13.00 | 240 | 3,120 |
| 70 | Transportation/Labour | MT-Km | 500.00 | 116 | 58,000 |
| 71 | Supply/Material | Each | 26.00 | 516 | 13,416 |
| 72 | Erection/Labour | Each | 26.00 | 100 | 2,600 |
| Schedule total | ₹14,55,086.5 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
86-2025-26TenderMasterdocument_1.pdf
ATTACHMENT
86-2025-26ExplanatoryNotes.pdf
ATTACHMENT
Standard General Conditions of cont
ATTACHMENT
GCCCorrectionSlips__1.pdf
ATTACHMENT
86-2025-26StandardGeneralConditionsofcontract.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .