Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 CrAccepted-AOC | ₹1.1 Cr | 1 | Accepted-AOC Awarded |
| 2 | 2₹1.2 Cr+₹38,750 (0.34%)Rejected-Finance | ₹1.2 Cr+₹38,750 (0.34%) | 2 | Rejected-Finance Rejected |
Tender Value
Refer Docs
Closing Date
4 Jun 2021, 12:00 pmClosed
CHIEF ENGINEER (P) VARTAK
HQ CE (P) VARTAK, C/O 99 APO, TEZPUR, SONITPUR, ASSAM PIN 784001
PROVIDING LAYING AND COMPACTION BC 30 MM AND CORRECTION WORK WITH BM 30 MM AT DIFFERENT LOCATIONS BETWEEN KM 12.000 TO KM 28.310 ON ROAD Y JN- NELYA FOR RESURFACING WORKS 2021-22 UNDER PROJECT VARTAK IN ARUNACHAL PRADESH
2021_BRO_440791_1
CE (P) VTK/NIT/05/2021-22
Open Tender
Civil Works - Roads
Works
90 days
KM 12 to KM 28.310 on Road Y Jn-Nelya
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
HQ CE (P) VARTAK, C/O 99 APO, TEZPUR, ASSAM
12 Dec 2022
7 May 2021
5 Jun 2021
8 May 2021
4 Jun 2021
8 May 2021
8 May 2021 - 25 May 2021
27 May 2021
Between Km 12.00 TO Km 28.310 on Y Jn-Nelya Road
Providing, laying and compacting Bituminous concrete (BC) to a consolidated thickness of 30 mm including application of tack coat of bitumen emulsion complying with IS 8887 @ 0.25 Kg per square meter area on existing bituminous surface as preparatory to the super imposition of BC mix for carrying out resurfacing works with pre-coated aggregate conforming to table 500-16 and satisfying the requirement of table 500-17 mixed with minimum 5.4% binder asphalt in accordance to Table 500-1 by weight of total mix and 2% cement by weight of mix (for filler) all as specified as per MoRT&H specification for Road and Bridge (Fifth Revision)
Providing, laying and compacting Bituminous Macadam layer (BM) to a consolidated thickness of 30 mm including preparation of surface and application of a tack coat of bitumen emulsion complying with IS 8887 @ 0.25 Kg per square meter area on existing bituminous road surface as preparatory to the super imposition of BM mix with pre-coated aggregate graded as per table No.500-7 and satisfying the physical requirement as per table No.500-6 of MoRT&H specification (Fifth Revision) mixed with minimum 3.4% by weight of total mix as binder in accordance to Table 500-1 as per MoRT&H specification for Road and Bridge works (Fifth Revision)
M/S GLOBAL ROYAL CONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .