Tender Value
₹6.1 L
EMD Value
₹15,300
Closing Date
6 Jul 2026, 3:00 pm
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, PMU, Irinjalakuda
Executive Engineer, PMU,Vydyuthi Bhavanam,Irinjalakuda
Drawing 11KV Covered Conductor from ThekkekurisuAmbazhakkadPPK Transformer
2026_KSEB_857311_1
TENDER/2026-27/5154/59 dtd 23.06.2026
Open Tender
Electrical Works
90 days
Thekkekurisu Ambazhakad Annamanada
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,534
Yes
₹15,300
23 Jun 2026
23 Jun 2026
8 Jul 2026
23 Jun 2026
6 Jul 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc.attached thereon and stacking the same. | 2 | No | 1,796.09 | ₹3,592.18 | BI01010001010000000000000515BI0100001113 |
| 2 | Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm)
0.45x0.45x1.5m, Plastering (1:3) 12mm
0.45x0.45mx5sides. | 9 | No | 4,028.29 | ₹36,254.61 | - |
| 3 | Additional rate for refitting/redoing one Disc set while renewing any type of 11kV cut pole. | 6 | No | 722.41 | ₹4,334.46 | - |
| 4 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). | 7 | No | 4,143.14 | ₹29,001.98 | - |
| 5 | Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point. | 24 | No | 158.91 | ₹3,813.84 | - |
| 6 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 9 | No | 906.41 | ₹8,157.69 | - |
| 7 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. | 7 | No | 3,129.05 | ₹21,903.35 | - |
| 8 | Fiting One no MVT on existing cross arm including 2 nos end termination (for One phase) of any rating for 11 kV AB Cable | 12 | Each | 963 | ₹11,556 | - |
| 9 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. | 18 | No | 1,778.32 | ₹32,009.76 | - |
| 10 | Dismantling (without damage) one HT stay including digging pit in all classes of soil and backfilling, and bringing back to section store. | 1 | No | 904.32 | ₹904.32 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Tender_Documents_ANNAMANADA.pdf
Tender Documents • 0.43 MB
GCC.pdf
Other Document • 0.79 MB
Bid_Form_and_Questionnaire.pdf
Additional Documents • 0.39 MB
BOQ_1449207.xls
BOQ • 0.40 MB