Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance B 49 A GROUND FLOOR GALI NO 5 MANDAWALI UNCHEPAR EAST DELHI DELHI 110092 | EAST DELHI | DELHI | 110092 | Admitted-Finance |
| 2 | Admitted-Finance FLAT NO C 401 LORD KRISHNA GREEN OPPOSITE DOON SCHOLAR SCHOOL KEDARPUR DEHRADUN UK 248001 | DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹3.2 L
Closing Date
12 Jun 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
LT COL H S Seeray
LT COL H S SEERAY, GE GE (ENGR PARK) SURATGARH PIN-901219 C/O 56 APO
DEMAND FOR SURFACING, REPAIRING, SURFACING AND MAINTENANCE OF RAMP GIRDERS QTY 192 (139 FOR MAINTENANCE AND 53 FOR REPAIR AND MAINTENANCE) AT GE (ENGR PARK) SURATGARH
2021_MES_446113_1
3004/QTN/02/E3 of 2021-22
Open Tender
Miscellaneous Services
Lump-sum
60 days
GE (ENGR PARK) SURATGARH
Please refer tender documents
3 documents required · 3 mandatory
₹0
Exempted
17 Jun 2021
27 May 2021
14 Jun 2021
28 May 2021
12 Jun 2021
29 May 2021
60 days
1. DEMAND FOR SURFACING, REPAIRING, SURFACING AND MAINTENANCE OF RAMP GIRDERS QTY 192 (139 FOR MAINTENANCE AND 53 FOR REPAIR AND MAINTENANCE) AT GE (ENGR PARK) SURATGARH :- (a) Removing the above items from the existing stack and shifting the same to the site of work (approx distance 30 to 60 Mtr). (b) Cleaning/removing synthetic materials of old surface with emery paper, wire brush and cotton waste to make the surface free from dust and old material. (c) Supply & replacement of pin locking – 20 Nos, strap – 3 Nos, adapter 8mm dia x 45mm long – 30 Nos, washer flat steel 25mm OD x 13mm ID x 3mm thick 62 Nos, pin steel 12mm dia x 75mm long – 20 Nos, pin cotter split MS 4mm dia x 20mm long – 40 Nos, pin cotter split MS 5mm dia x 30mm long – 40 Nos and all as per sample and directed by BSO/GE. (d) Aluminum welding at the places of cracked/broken portion of the body with suitable aluminum plates, welding rods and finishing, including preparation for welding and all as directed by BSO/GE. (e) De-rusting the steel parts with steel wire brush, emery paper K’Oil and testing by the technician for the smooth functioning of locking Pin, adaptor, guard excel and etc. (f) Mixing thoroughly the araldite and hardener pig hy 88 in the ratio of 2:1 to make synthetic adhesive with the scale of Hardener 0.355 kg, Araldite 0.700 Kg/Girder. (g) Apply the synthetic adhesive on the girder with 3’’ brush smoothly. (h) Spreading the Carborandum cubic brown/black AP type Grit (16) (Carborandum 3.84 Kg/Girder) on the surface of the girders by sieve to cover the complete surface. (j) Apply mild pressure with wooden plank/roller after removing extra grits to ensure even surface. (k) The girder will be kept undisturbed for seven days duly protected against moisture/rain. (l) Only the synthetic adhesive required for progress will be mixed and applied (m) Mixing of araldite & hardner will be done after the surface is well cleaned. (n) Synthetic materials will be applied within 30 to 45 minutes. (o) After repair and surfacing, stacking the same on proper dunnage as directed by the BSO/GE. Note:- 1. All materials and tools required for work will be supplied/provided by the contractors/suppliers. 2. Genr & Welding set for 09 days, almn welding rods 20 Pkts and almn alloy plate 5 mm 20 Kgs to be provided for welding. 3. Old materials will be the property of the department. 4. Before welding almn sheets to be assembled/fixed accurately without gap. 5. Welding work will be done in approved manner with suitable almn welding rods. 6. Welding will be done continuously. Spot welding shall not be accepted. Slags and others deposits to be cleaned before painting. 7. Hardener 0.355 Kg / girders (Make Pidilite) x 192 Nos = 68.16 Kgs - 68.16 Kgs. 8. Araldite 0.700 Kg/girders(Make Pidilite) x 192 Nos = 134.40 Kgs - 134.40 Kgs. 9. Carborandum 3.84 Kg per girder x 192 Nos = 737.28 Kgs - 737.28 Kgs. 10. Grease @ 150gm per main Girder (Make-LG) x 192 Nos = 28.80 Kgs - 28.80 Kgs
PACHR BUILDERS
PACHAR BROTHERS
HARDIK ENTERPRISES
AUTO HOME
ANSH ENTERPRISES
PUNDIR ENTERPRISES
MANOJ SPARES AND SERVICE CENTER
AMAR TRADING COMPANY
BANSAL BROTHERS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .