| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹24.0 L+₹46,031.05 (1.96%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹24.1 L+₹60,602.05 (2.58%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹23.5 L
EMD Value
₹50,000
Closing Date
18 Mar 2023, 6:00 pmClosed
MANAGER (Technical)
SILK STEEL FABRICATION UNIT SL PURAM, CHERTHALA ALAPPUZHA - 688582
Civil work for cooling Tower and Pump Foundation at TTPL
2023_SILK_565760_1
SILK/SFU/04/2022-23/980
Open Tender
Miscellaneous Works
Item Rate
90 days
Alappuzha
As per tender documents
7 documents required · 7 mandatory
₹2,950
₹50,000
Yes
25 Jan 2024
11 Mar 2023
20 Mar 2023
11 Mar 2023
18 Mar 2023
11 Mar 2023
11 Mar 2023 - 18 Mar 2023
Amount
COOLING TOWER
EARTHWORK EXCAVATION IN ORDINARY SOIL AND DEPOSITING ON BANK WITH INITIAL LEAD UP TO 300 MM AND FOR LIFT AS SPECIFIED BELOW INCLUDING SHUTTERING, ALL LABOUR, OTHER INCIDENTALS ETC COMPLETE FOR THE SUCCESSFUL COMPLETION OF THE WORK (RATE IS INCLUSIVE FOR CLEARING OFF DUMPED MATERIAL SUCH AS PIECES OF STEEL SCRAPE ROOTS OF TREES, CONCRETE IF ANY FOUND IN THE AREA OF EXCAVATION) (I) LIFT UP TO 1.5M RATE IS INCLUSIVE OF COST DEWATERING AND LEADING WATER TO NEARBY DRAIN).
BACK FILLING WITH CLEAN EXCAVATED EARTH AND CONSOLIDATED IN LAYERS NOT EXCEEDING 150 MM THICKNESS, FINISHING THE SURFACE IN LINE AND LEVEL INCLUDING ALL LABOUR OTHER INCIDENTALS ETC COMPLETE.
SUPPLY AND FILLING INSIDE PLINTH WITH CLEAN RED EARTH AND CONSOLIDATED IN LAYERS NOT EXCEEDING 150MM THICKNESS FINISHING THE SURFACE IN LINE AND LEVEL INCLUDING ALL LABOUR OTHER INCIDENTALS ETC COMPLETE.
FILLING WITH QUARRY DUST UNDER THE FOUNDATION INCLUDING WATERING, RAMMING, CONSOLIDATING AND DRESSING COMPLETE.
PROVIDING & CONSTRUCTION OF RANDOM RUBBLE PACKING STONE SHALL BE HARD, SOUND FREE FROM DECAY AND WEATHERING AS THE STONES SHALL BE THOROUGHLY WETTED BEFORE LAYING FACE STONES SHALL BE LAID IN ALTERNATE HEADERS AND STRETCHERS FASHON WITH SIZE STONE SIZES NOT LESS THAN 20cm & POINTING HAS TO BE DONE ON THE EXPOSED SURFACES THE COST IS INCLUSIVE OF MATERIAL LABOUR COMPLETE WITH ALL LEAD & LIFT COMPLETE.
PROVIDING AND LAYING PLAIN CEMENT CONCRETE M10 USING 40 MM IS NOMINAL SIZE HARD GRANITE BROKEN STONE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR FOR MIXING, LAYING, CONSOLIDATING CURING, COST OF FORM WORK (COST OF DEWATERING AND LEADING WATER TO NEARBY DRAIN FOR THE CONSTRUCTION OF PILE CAP ETC. COMPLETE, EXCLUDING COST OF CEMENT
PROVIDING AND LAYING R.C.C, M30 USING 20 MM L S NOMINAL SIZE HARD GRANITE BROKEN STONE INCLUDING COST CONVEYANCE OF ALL MATERIALS, LABOUR FOR MIXING, LAYING, CONSOLIDATING, CURING, COST OF FORMWORK, HIRE CHARGES FOR TOOLS AND PLANTS, (COST OF DEWATERING AND LEADING WATER TO NEARBY DRAIN OTHER INCIDENTALS ETC. COMPLETE EXCLUDING COST AND FABRICATION CHARGE OF REINFORCEMENT AND COST OF CEMENT
REINFORCEMENT FOR RCC WORK INCLUDING STRAIGHTENING, CUTTING, BENDING, CRANKING, WELDING PLACING IN POSITION AND BINDING WITH MS BINDING WIRE OF 18 SWG IN DOUBLE STARND ALL COMPLETE USING STEEL BARS CONFIRMING TO IS 1786 IN GRADE Fe-415, COMPLETE ALL INCLUDING COST AND CONVEYANCE OF REINFORCEMENT AS DIRECTED BY ENGINEER IN CHARGE BASIC RATE OF STEEL 72/KG)- (EXCLUDING GST)
BOLT BOX
PLASTERING WITH CM 1:4, 12 THICK FOR THE FOLLOWING MIX AND THICKNESS IN ONE COAT FLOATED HARD AND TROWELLED SMOOTH INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR OTHER INCIDENTALS ETC COMPLETE (EXCLUDING CEMENT)
PAINTING CEMENT PLASTERED SURFACE OUTSIDE WALL WITH TWO COATS OF WEATHER PROOF EXTERIOR EMULSION PAINT (ASIAN PAINTS APEX OR WEATHER COAT OF BERGER OR DULEX) OVER ONE COAT OF WHITE CEMENT WASH OF APPROVED QUALITY BRAND AND COLOUR AFTER RUBBING AND CLEANING THE SURFACE WITH WIRE BRUSH, SAND PAPER ETC. INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LABOUR, OTHER INCIDENTALS ETC COMPLETE.
WATERPROOFING BY SIKA TOP SEAL 109 PROVIDING AND APPLYING WATERPROOFING TREATMENT TO THE AREA WITH SIKA TOP SEAL 109 HI-LIQUID APPLIED, CRACK BRIDGING 2 PACK ACRYLIC POLYMER MODIFIED CEMENTITIOUS WATERPROOFING COATING SYSTEM, TWO COATS AS PER THE SPECIFICATION, AFTER NECESSARY SURFACE PREPARATION, CRACK FILLING WITH POLYURETHANE SEALANT FILLING AND MAKING GOOD ROUGH PATCHES, CHASING OUT V SHAPE GROOVES AROUND PERIPHERY AS WELL AS OUTGOING PIPE LINES FILLING THEM UP WITH SBR MODIFIED MORTAR,, SATURATING THE SURFACE AND BRUSH APPLYING WATERPROOF COATING ETC COMPLETE WITH ALL MATERIALS AND LABOUR EXCEPT CEMENT AND SAND.
PUMP FOUNDATION
EARTHWORK EXCAVATION IN ORDINARY SOIL AND DEPOSITING ON BANK WITH INITIAL LEAD UP TO 300 MM AND FOR LIFT AS SPECIFIED BELOW INCLUDING SHUTTERING, ALL LABOUR, OTHER INCIDENTALS ETC. COMPLETE FOR THE SUCCESSFUL COMPLETION OF THE WORK (RATE IS INCLUSIVE FOR CLEARING OFF DUMPED MATERIAL SUCH AS PIECES OF STEEL SCRAPE ROOTS OF TREES, CONCRETE IF ANY FOUND IN THE AREA OF EXCAVATION) LIFT UP TO 1.5M (RATE IS INCLUSIVE OF COST DEWATERING AND LEADING WATER TO NEARBY DRAIN).
BACK FILLING WITH CLEAN EXCAVATED EARTH AND CONSOLIDATED IN LAYERS NOT EXCEEDING 150 MM THICKNESS, FINISHING THE SURFACE IN LINE AND LEVEL INCLUDING ALL LABOUR, OTHER INCIDENTALS ETC COMPLETE.
COMPACTION OF EXISTING EARTH INCLUDING WATERING, HAMMING, CONSOLIDATING AND DRESSING COMPLETE
FILLING WITH QUARRY DUST UNDER THE FOUNDATION INCLUDING WATERING, RAMMING CONSOLIDATING AND DRESSING COMPLETE
PROVIDING & CONSTRUCTION OF RANDOM RUBBLE PACKING STONE SHALL BE HARD, SOUND, FREE FROM DECAY AND WEATHERING ALL THE STONES SHALL BE THOROUGHLY WETTED BEFORE LAYING FACE STONES SHALL BE LAID IN ALTERNATE HEADERS AND STRETCHERS FASHION WITH SIZE STONE, SIZES NOT LESS THAN 20cm AND POINTING HAS TO BE DONE ON THE EXPOSED SURFACES THE COST IS INCLUSIVE OF MATERIAL LABOUR COMPLETE WITH ALL LEAD & LIFT COMPLETE
PROVIDING AND LAYING PLAIN CEMENT CONCRETE M10 USING 40 MM I.S NOMINAL SIZE HARD GRANITE BROKEN STONE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LABOUR FOR FIXING, LAYING, CONSOLIDATING CURING, COST OF FORM WORK (COST OF DEWATERING AND LEADING WATER TO NEARBY DRAIN FOR THE CONSTRUCTION OF PILE CAP ETC COMPLETE EXCLUDING COST OF CEMENT
PROVIDING AND LAYING RCC, M25 USING 20 MM I.S NOMINAL SIZE HARD GRANITE BROKEN STONE INCLUDING COST CONVEYANCE OF ALL MATERIALS, LABOUR FOR MIXING, LAYING, CONSOLIDATING, CURING, COST OF FORMWORK, HIRE CHARGES FOR TOOLS AND PLANTS (COST OF DEWATERING AND LEADING WATER TO NEARBY DRAIN OTHER INCIDENTALS ETC COMPLETE EXCLUDING COST AND FABRICATION CHARGE OF REINFORCEMENT AND COST OF CEMENT
PEDESTAL
BASE SLAB
REINFORCEMENT FOR RCC WORK INCLUDING, STRAIGHTENING CUTTING, BENDING, CRANKING, WELDING PLACING IN POSITION AND BINDING WITH MS BINDING WIRE OF 18 SWG IN DOUBLE STARNO ALL COMPLETE USING STEEL BARS CONFIRMING TO IS1786 IN GRADE Fe-415, COMPLETE ALL INCLUDING COST AND CONVEYANCE OF REINFORCEMENT AS DIRECTED BY ENGINEER IN CHARGE(BASIC RATE OF STEEL 72 KG) EXCLUDING GST.
BOLT BOX (DEPTH = 0.45m, RADIUS=0.2m)
PLASTERING WITH CM 1:4, 12 THICK FOR THE FOLLOWING MIX AND THICKNESS IN ONE COAT FLOATED HARD AND TROWELLED SMOOTH INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR, OTHER INCIDENTALS ETC COMPLETE (EXCLUDING CEMENT)
K.T.MUSTHAFA
AAYKAYCONSTRUCTIONS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .