Executive Engineer Ukai Division No.1, Ukai
Supplying and erecting commissioning and testing of 315 KVA Transformer for Hill No.2 at Ukai Dam
273730
Nivida No.31 of 2025-26
Open
Electrical Works
Works
Tapi
8 documents required · 8 mandatory
₹900
Executive Engineer Ukai Division No.1,Ukai
₹8,000
6 Feb 2026
6 Feb 2026
6 Feb 2026
19 Feb 2026
6 Feb 2026
Name of Work : Supplying and erecting, commissioning and testing of 315 KVA Transformer for Hill No.2 at Ukai Dam
Per Description Item Rate Words Per Amount
Providing, erecting, testing & commissioning approved make oil
immersed ONAN cooled, double wound, core type indoor / outdoor
copper wound 11KV/ 433V step down transformer of following capacities
operating on 3 phase, 50 Hz 4 wire & neutral earthed system
continuously rated for a full temperature rise in oil not exceeding
Deg.C.at maximum ambient temp. of 50 Deg. C. complete with
necessary radiator first filling of new transformer oil & standard fitting as
below complying with IS 1180( Part 1 ):2014 standards with energy
efficiency level
Off load tap changing range steps +2.5% to -5% on H.V for variation
should be provided. The H.V. shall be connected Delta & Secondary with
star connection. The transformer should have cable-end boxes on H.T.
side suitable for up to 3 core 150 sq.mm. XLPE cable & on L.T. side
suitable for bus duct or cables as per requirement complete with test
certificates from manufacturers
1. Oil conservator with filling Hole & Cap - One No.
2. Thermometer pocket with 6" dial type thermometer switch alarm &
trip contacts- Two nos.
3. Silica-gel breather with charge- One No.
4. Plain oil level gauge - One No.
5. Drain / Sampling / Filter valve- One No.
6. Top Filter Valve - One No.
7. Explosion vent with Diaphragm - One No.
8. Rating & Diagram plate - One No.
9. Additional neutral bushing for earthing - One No.
10. Bi directional Roller - Four Nos.
11. Earthing terminals - Two Nos.
12. Lifting lugs - Two Nos.
13. Air release plug. - One No.
14. Double float buchholz relay with Alarm and trip contacts.
15. Control cable as required from Transformer to VCB Panel is to be
provided with necessary connection to VCB relays for protection.
as per IS 1180 level-2
Rupees Seven Lakh NinetySeven
Max. allowable loses at 50 % of rated load is 1.025 KW and at full load is
1 797411.16 Thousand Four Hundred Eleven Ea.
Paise Sixteen Only
I/We am/are willing to carry out the work at …………………………………………………………………% above/below percent (shouldbe written in figured
and words) of the estimated rates mentioned above. Amount of my/our tender works out as under.
Estimated amount Estimated amount
Put to tender Rs……………. Put to tender Rs…………….
Deduct : ……. % Above RS…………… Deduct : ……. % Below RS……………
Net Rs…………… Net Rs……………
*(Please strike out whitchever is not applicable).
Note 1 – All work shall be carried out as per public works department handbook and other specification of Division ot as directed.
Note 2 – All the columns is schedule should be filled in ink and the total of the entries in the last column should be struck by the contractor under
Note 3 – Rates quoted include clearance of site (prior commencement of work and at its close ) in all respects and hold good for work under all
conditions, site, moisture,weather etc.
Note 4 – To be continued on additional sheets, if found necessary.
Note 5 - The rates quoted by the Contractor must be inclusive of all taxes prevailing on due date of bid submission except GST. However, any
subsequent changes in the tax structure by Government after due date of bid submission will be compensated (+/-) on availability or submission of
actual documentation. Contractor will have to intimate Engineer regarding changes occurred in the tax structure after bid submission. If the
contractor fails to provide such information and if any financial obligation may arise due to change in tax structure, same will be recovered from the
contractor. GST will be paid separately on the bills. Hence, it is the responsibility of the contractor to pay the GST to the concerned Authority.
Deputy Executive Engineer Executive Engineer
Electrical Sub Division Ukai Division No
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Nivida No.31 of 2025-26.pdf
2.0 Special condion Electric (5) (Repaired).pdf
5.0 Approved make list 2013 2014 Part 1.pdf
6.0 Approved make list 2013 2014 Part 2.pdf
FINAL _ SBD 315KVA hill 2.pdf
Schedule-B 315 KvA Hil-2.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .