Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 LAccepted-AOC HARANBARI SAGAR SOUTH 24 PGS KAKDWIP 743373 | KAKDWIP | SOUTH 24 PARGANAS | WEST BENGAL | 743373 | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹11 L+₹30,090 (2.81%)Rejected-Finance MASAT HARIPUR RD VILL P O HARIPUR HOOGHLY | HARIPUR | HOOGHLY | WEST BENGAL | 712701 | L2 | Rejected-Finance Higher bid | |
| 3 | L3₹11.6 L+₹90,090 (8.42%)Rejected-Finance 26 1 BINDABAN PAL LANE KOLKATA 700003 | KOLKATA | KOLKATA | WEST BENGAL | 700003 | L3 | Rejected-Finance Higher bid | |
| 4 | L4₹11.7 L+₹1.0 L (9.37%)Rejected-Finance 230 S N ROY ROAD KOLKATA 700038 | KOLKATA | KOLKATA | WEST BENGAL | 700038 | L4 | Rejected-Finance Higher bid |
Tender Value
₹11.7 L
EMD Value
₹23,340
Closing Date
22 Mar 2022, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE, South 24 Pgs Elect Divn
57/2 DH Road Kolkata - 23
Supply, Delivery and Installation of 02 Nos 20KVA UPS with battery for CCU at Canning SDH, S-24Pgs
2022_WBPWD_369565_1
WBPWD/EE/S24PED/eNIT22R/21-22
Open Tender
ELECTRICAL WORKS ORG
Item Rate
30 days
Canning
Please refer Tender documents.
3 documents required · 3 mandatory
₹23,340
EE, South 24 Pgs Elect Divn
26 Aug 2022
8 Mar 2022
24 Mar 2022
8 Mar 2022
22 Mar 2022
11 Mar 2022
10 Mar 2022
90 days
Amount
SITC of 20 KVA UPS 3phase input & 3 phase out put on line UPS systems
Battary Cabine: With power coated MS angle with MS sheet suiteble dimention and gadge, well air ventilation to ensure the battery optimum life cycle.Useing Nyvin cable with proper rating for interlink cables and battery input and necessary acessiress. , Battery : 12 V, VRLA/SMF batteries - 32 no. , DC Bus : Minimum 384V or above, 30 mim back up required (Minimum 21188 VAH) Battery. Battery Make: Exide/Amar Raja(Quanta) , Protections: Input & Output Over / Under Voltage, surge protection, earth leakage, Single Phasing DC - High / Under Voltage , Neutral failure, Phase reversal. There should be fault identifier/recorder/indicator. , Battery Charging Over Current, Output Overload / Short Circuit / Over Temp., UPS auto ON on Mains recovery As per EIC , Audio Alarm, Mains Fail, Battery Low Pre-alarm, Inverter Trip , Metering: Graphical LCD display for Input & Output - Voltage, Current & Frequency, Battery - Voltage & Current , Indications: Mains - On / Fail / High / Low / Single Phasing DC - On / High, Battery - Low Pre-alarm / Low Trip Inverter - On / Trip / High / Low / Over Current , Switchgear: MCB / MCCB for Input, Battery, Output & Manual Bypass Switch , Termination: Input, Battery, Output & Bypass , Enclosure: IP 20, Operating Temp: 0 to 40 Deg C, Humidity: Upto 95% Rh (non-condensing), Cooling: Forced Air, Noise: < 55 dB, Cold Start : Provided, Communication: RS 232, RS 485, Dual input Kit, Monitoring Software: UPS Monitoring Software on Windows XP Platform, ISO 9001: 2015, ISO 14001: 2015, ISO 45001:2018,ISO 50001;2018 , ISO:20000-1:2011,ISO:27001:2013, ROHS, CE Certification:IEC/EN 62040-1-1,IEC/EN50091-1,IEC/EN 60950 (Safety) IEC/EN 50091-2, IEC/EN 62040-2(EMC Emmission),IEC/EN 62040-3(performance & Design)IEC/EN 61000-4(EMC Emmunity) & IEC/EN 60146 (Design & Manufacture), Warranty: Three years on UPS & Three Years on Batteries
a) Supply & fixing of 63 A Four Pole MCB with enclosure (Legrand/Havells/L&T) - 2 No for each UPS, b) Supply & fixing of 4X10sqmm + 2X6sqmm FR CU Wire(Make: KEI/Finolex/Polycab) as required for connection of the UPS at site., c) Supplying & Fixing Industrial Plug & Socket board with 415 V, 30A, TPN & Earth Metal Industrial Plug socket & 30A Industrial top incl. S&F 32 A TPN/FP MCB breaking capacity 10kA (C- Curve) in SS enclosure fixed on wall and necessary connection. - 4 Nos
Note: 1) All the above rates should be quoted inclusive of all taxes & duties, District charges, Riverine charges and LWC as applicable, with cost of maintenance, servicing, supply & replacement of spares for 3 (three) years from the date of commissioning. 2) Total is rounded off to the nearest rupees.
GHANASHYAM ELECTRIC STORES
Teknet Consultancy
switching avo Electro Power Ltd
technical_718416.pdf
PDF • 0.03 MB
techsummary_718416.pdf
PDF • 0.31 MB
finance_718416.pdf
PDF • 0.29 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_718416.pdf
PDF • 0.32 MB
AOC.pdf
PDF • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .