| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹35.3 L+₹70,791.09 (2.04%)Admitted-Fee/PreQual/Technical/Finance 10061941 ARYA REMA DISTRICT PANCHAYAT IDUKKI | IDUKKI | KERALA | 685501 | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | DHANEESH T L2 | MANOHARAN.K L1 |
|---|---|---|---|---|---|
| 1.00Maintanence | |||||
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 160 | hour | 273.78 ₹43,804.8 Lowest | 275.28 ₹44,044.8 |
| 1.00 | OD323818/2022-2023:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed
earth to be levelled and neatly dressed.In or under waterand liqued mud, pumbing out
All kinds of soil | 1,350 | cum | 316.66 ₹4,27,491 Lowest | 318.4 ₹4,29,840 |
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 525 | sqm | 14.19 ₹7,449.75 Lowest | 14.27 ₹7,491.75 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 191.1 | cum | 205.87 ₹39,341.76 Lowest | 207 ₹39,557.7 |
| 1.00 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 507.96 | cum | 3,358.48 ₹17,05,973.5 | 3,199.39 ₹16,25,162.14 Lowest |
| 1.01 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 105.84 | cum | 1,414.61 ₹1,49,722.32 Lowest | 1,422.35 ₹1,50,541.52 |
| 1.01 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 151.2 | cum | 1,986.29 ₹3,00,327.05 Lowest | 1,997.16 ₹3,01,970.59 |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 35.7 | cum | 8,261.37 ₹2,94,930.91 Lowest | 8,306.59 ₹2,96,545.26 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 2,200.38 | kilogram | 94.56 ₹2,08,068.31 Lowest | 95.08 ₹2,09,212.51 |
Tender Value
₹37.2 L
EMD Value
₹50,000
Closing Date
16 Sept 2026, 5:00 pmClosed
AE, THIRUVALLA MUNICIPALITTY
AE, THIRUVALLA MUNICIPALITTY
AMRUT-2022-23-Rejuvenation of Kulathinkara pond in ward 4, Thiruvalla Municipalitty
2026_LSGD_867214_2
01/AE/LSGD/2026-27
Open Tender
Civil Works - Water Works
Item Rate
180 days
THIRUVALLA
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
8 Oct 2026
2 Sept 2026
18 Sept 2026
2 Sept 2026
16 Sept 2026
2 Sept 2026
2 Sept 2026 - 14 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Maintanence | |||||
| 1.001 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | - | hour | - | - |
| 1.002 | OD323818/2022-2023:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed
earth to be levelled and neatly dressed.In or under waterand liqued mud, pumbing out
All kinds of soil | - | cum | - | - |
| 1.003 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.004 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 1 | cum | - | - |
| 1.005 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 1 | cum | - | - |
| 1.006 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | - | cum | - | - |
| 1.007 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 1 | cum | - | - |
| 1.008 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | cum | - | - |
| 1.009 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 0.6 | kilogram | - | - |
stage.html
html • 0.02 MB
finance_1468421.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.17 MB
KULATHINKARA.pdf
Tender Documents • 1.66 MB
BOQ_1468421.xls
BOQ • 0.31 MB
nitsep.pdf
PDF • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .