Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.4 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹49.5 L+₹4,108.23 (0.08%)Rejected-AOC | L2 | Rejected-AOC L2 Bidder | |
| 3 | L3₹49.5 L+₹5,593.13 (0.11%)Rejected-Finance | L3 | Rejected-Finance Higher Bidder |
Tender Value
₹49.5 L
EMD Value
₹98,993
Closing Date
27 Feb 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Chairman
Dhuliyan Municipality
Construction of Concrete Road with guard wall from Feraj Sk house to Sanjib Chowdhary house at ward no 7 Under Dhuliyan Municipality
2026_MAD_1002920_6
DHLYN/D/50 /2025-2026
Open Tender
CIVIL WORKS
Percentage
45 days
Dhuliyan
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹98,993
29 Oct 2026
11 Feb 2026
2 Mar 2026
11 Feb 2026
27 Feb 2026
11 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches odrains, in all sorts of soil (including mixed soil butexcluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimmingthe sides of trenches, levelling, dressing andramming the bottom, bailing out water as requiredcomplete.
(a) Depth of excavation not exceeding 1,500 mm. | 760 | %Cum | 11,927 | ₹90,64,520 |
| 2 | Earth work in filling in foundation trenches or plinthwith good earth, in layers not exceeding 150 mm.including watering and ramming etc. layer by layercomplete. (Payment to be made on the basis ofmeasurement of finished quantity of work)
(a) With earth obtained from excavation of
foundation. | 760 | %Cum | 7,754 | ₹58,93,040 |
| 3 | Cement concrete with graded stoneballast(40mm size excludingshuttering)In ground floor(A) [Pakur Variety](a) 1:3:6 proportion | 38 | Cum | 5,060.3 | ₹1,92,291.4 |
| 4 | Ordinary Cement concrete (mix 1:1.5:3) with graded stonechips (20 mm nominal size) excluding shuttering andreinforcement if any, in ground floor as per relevant IS codes.(i) Pakur Variety | 396 | Cum | 5,274.24 | ₹20,88,599.04 |
| 5 | Reinforcement for reinforced concrete work in all sorts ofstructures including distribution bars, stirrups, binders etcinitial straightening and removal of loose rust (if necessary),cutting to requisite length, hooking and bending to correctshape, placing in proper position and binding with 16 gaugeblack annealed wire at every intersection, complete as perdrawing and direction. (a) For works in foundation, basement and upto roof of ground JSW/JSPL/SHYAM/SRMB/ BMASL/
floor/upto 4 m II. Other than SAIL/
TATA/RINL | 22.07 | Mt | 55,700.12 | ₹12,29,301.65 |
| 6 | (A) Filling in foundation or plinth by silver sand in
layers not exceeding 150 mm as directed and
consolidating the same by thorough saturationwith
water, ramming complete including the cost of supplyof sand. (payment to be made on measurement offinished quantity)(B) Do - by fine sand | 400 | %Cum | 59,961 | ₹2,39,84,400 |
| 7 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or infoundation or in foundation trenches. | 1,380 | Cum | 24 | ₹33,120 |
| 8 | Hire and labour charges for shuttering with centering andnecessary staging upto 4 m using approved stout props andthick hard wood planks of approved thickness with requiredbracing for concrete slabs, beams and columns, lintels curved
or straight including fitting, fixing and striking out aftercompletion of works (upto roof of ground floor)(When the height of a particular floor is more than 4 m theequivalent floor height shall be taken as 4 m and extra forworks beyond the initial 4 m ht. shall be allowed under 12 (e)for every 4 m or part thereof)
(f) 25 mm to 30 mm shuttering without staging in foundation | 1,075 | Sqm | 205 | ₹2,20,375 |
| 9 | CGST 18% | 1 | Each | 7,47,559.2 | ₹7,47,559.2 |
| 10 | Cess @ 1% | 1 | Each | 49,006.65 | ₹49,006.65 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
2911Form.pdf
Tender Documents • 0.54 MB
Pre.pdf
Additional Documents • 0.58 MB
BOQ_2458624.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .