Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 CrAdmitted-Finance | ₹4.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.5 Cr+₹14.4 L (3.30%)Admitted-Finance | ₹4.5 Cr+₹14.4 L (3.30%) | L2 | Admitted-Finance |
| 3 | L3₹4.6 Cr+₹26.1 L (5.99%)Admitted-Finance UNIT NO 514 515 AND 516 5TH FLOOR SUNCITY SUCCESS TOWER GOLF COURSE EXTENSION ROAD GURGAON 122005 | GURGAON | GURGAON | HARYANA | 122005 | ₹4.6 Cr+₹26.1 L (5.99%) | L3 | Admitted-Finance |
| 4 | L4₹7.2 Cr+₹2.8 Cr (64.9%)Admitted-Finance 8 2 5 RAVULA RESIDENCY MAIN ROAD SRINAGAR COLONY HYDERABAD 500082 TELANGANA | HYDERABAD | TELANGANA | 500082 | ₹7.2 Cr+₹2.8 Cr (64.9%) | L4 | Admitted-Finance |
| 5 | L5₹8.2 Cr+₹3.8 Cr (87.5%)Admitted-Finance B 1 E 27 MOHAN COOPERATIVE INDUSTRIAL ESTATE MATHURA ROAD NEW DELHI 110044 INDIA | SOUTH EAST | DELHI | 110044 | ₹8.2 Cr+₹3.8 Cr (87.5%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Agnitio Infrastructure Projects Pvt. Ltd. L1 | LEA Associates South Asia Pvt. Ltd. L5 | Aarvee Associates Architects Engineers and Consultants Pvt Lts L4 | Technocrats Advisory Services Pvt. Ltd. L2 | MSV INTERNATIONAL INC L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Professional Staff | ||||||||
| 2.00 | Team Leader Cum Senior Highway Engineer | 30 | Man Months | 99,000 ₹29,70,000 Lowest | 2,60,000 ₹78,00,000 | 2,50,000 ₹75,00,000 | 1,20,000 ₹36,00,000 | 2,00,000 ₹60,00,000 |
| 3.00 | Resident cum Highway Engineer | 48 | Man Months | 90,000 ₹43,20,000 Lowest | 2,20,000 ₹1,05,60,000 | 2,00,000 ₹96,00,000 | 90,000 ₹43,20,000 Lowest | 1,60,000 ₹76,80,000 |
| 4.00 | Bridge/Structural Engineer | 30 | Man Months | 90,000 ₹27,00,000 Lowest | 1,50,000 ₹45,00,000 | 2,00,000 ₹60,00,000 | 1,00,000 ₹30,00,000 | 1,80,000 ₹54,00,000 |
| 5.00 | Senior Pavement Specialist | 24 | Man Months | 90,000 ₹21,60,000 Lowest | 1,40,000 ₹33,60,000 | 2,00,000 ₹48,00,000 | 1,10,000 ₹26,40,000 | 1,70,000 ₹40,80,000 |
| 6.00 | Senior Quantity cum Material Expert | 24 | Man Months | 90,000 ₹21,60,000 Lowest | 1,40,000 ₹33,60,000 | 2,00,000 ₹48,00,000 | 1,10,000 ₹26,40,000 | 1,60,000 ₹38,40,000 |
| 7.00 | Road Safety Expert | 14 | Man Months | 90,000 ₹12,60,000 | 1,10,000 ₹15,40,000 | 2,50,000 ₹35,00,000 | 50,000 ₹7,00,000 Lowest | 1,25,000 ₹17,50,000 |
| 8.00Sub-Professional Staff | ||||||||
| 9.00 | Survey Engineer | 32 | Man Months | 81,000 ₹25,92,000 | 97,500 ₹31,20,000 | 60,000 ₹19,20,000 | 90,000 ₹28,80,000 | 30,000 ₹9,60,000 Lowest |
| 10.00 | Assistant Highway Engineer (02 no.) | 72 | Man Months | 63,000 ₹45,36,000 | 1,02,500 ₹73,80,000 | 70,000 ₹50,40,000 | 50,000 ₹36,00,000 | 18,000 ₹12,96,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
10 Jun 2024, 3:00 pmClosed
S
NHIDCL HQ New Delhi
Independent Engineer Services for Four Laning of Badarpur -Churaibari section of NH-37 NH-8 in the state of Assam (Package-IV) on Hybrid Annuity Mode.
2024_NHIDC_801077_1
NHIDCL/Assam/NH-37 8/HAM/IE/S-C/Pkg-IV/2024
Open Tender
Civil Works
PPP-BoT-HAM
1460 days
Assam
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,900
MD NHIDCL
₹2 L
27.03.2024
20 Dec 2024
15 Mar 2024
11 Jun 2024
15 Mar 2024
10 Jun 2024
10 Apr 2024
15 Mar 2024 - 27 Mar 2024
27 Mar 2024
Amount
Professional Staff
Team Leader Cum Senior Highway Engineer
Resident cum Highway Engineer
Bridge/Structural Engineer
Senior Pavement Specialist
Senior Quantity cum Material Expert
Road Safety Expert
Sub-Professional Staff
Survey Engineer
Assistant Highway Engineer (02 no.)
CAD Expert
Environmental Engineer
Assistant Bridge Engineer
Assistant Quality cum Material Engineer (02 no.)
Electrical Engineer
Quantity Surveyor
Horticulture cum Landscaping Expert
Support Staff
Office Manager
Accountant cum Cashier
Steno cum Computer Operator
Office Boy (1 No.)
Transportation (Fixed rate on rental basis) The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run
Innova/Scorpio or equivalent vehicle (not more than 3 years old) -1 No. (During Construction Period - 36 months & During Development and O&M Period 12 Months )
Bolero or equivalent vehicle (not more than 3 years old)-2 No. (During Construction Period - 36 months & 12 Months During Development and O&M Period )
Duty Travel to Site (Fixed Costs) (For all Lengths of projects) : Professional and Sub-Professional Staff
Site to NHIDCL HQ for Key Professionals (Round Trip)
Site to Regional Office for Key Profesionals (Round Trips )
Office Rent (Fixed Costs)– Minimum 200 sqm area of office shall be rented. The rent cost includes electricity and water charges, maintenance, Cleaning, repairs, etc. complete.
Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
Office Furniture and Equipment (Rental) :
Monthly reports (Design and Construction) No of Reports - 48
Half yearly Report (Design and Construction) No of Reports - 24
Various others reports as provided in the Concession Agreement such as Completion Report (Design and Construction) No of Reports - 8
Road Survey Equipment
Surface defects detection and roughness measurement using Network Survey Vehicle (No. of times survey to be conducted - 3
Pavement strength measurement using FWD (No. of times survey to be conducted - 1
Bridge inspection using Mobile Bridge Inspection Unit (No. of times survey to be conducted - 3
Road signs inspection using Retro Reflectometer (No. of times survey to be conducted - 3
Contigencies A fixed amount of Indian Rupees Ten Lakh (Rs 10,00,000/-) shall be included in the Financial Proposal
Technocrats Advisory Services Pvt. Ltd. (BID ID -3019300)
MSV INTERNATIONAL INC (BID ID -3020436)
Aarvee Associates Architects Engineers and Consultants Pvt Lts (BID ID -3014932)
LEA Associates South Asia Pvt. Ltd. (BID ID -3014388)
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .