Tender Value
₹49.8 L
EMD Value
₹50,000
Closing Date
1 Sept 2026, 6:00 pmClosed
Dy.Minicipal Commissioner - West Zone
Const.of RCC Road and New Footpath at Navrangpura village, Rajiv Nagar and village level, Chali area and other areas MLA Shri and others from the budget in Navrangpura Ward in West Zone
339128
2/26-27 (T.N.63)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹1,500
Municipal Commissioner, Ahmedabad
₹50,000
28 Aug 2026
28 Aug 2026
28 Aug 2026
1 Sept 2026
28 Aug 2026
2. Tender Estimated Cost Rs.49,79,807.26(exclusive of GST). GST will be paid extra by
AMC/Authority at prevailing rate to the contractor
1% of the Tender Cost in the form (Rs.50,000/-)
3. Earnest Money
(D.D./Pay Order / Local Micr Check/B.G.)
4 Tender Fee Rs Demand Draft of Rs.1500.00
6. Time-Limit 12 months
7. Validity Period 120 Days
(i) Last Date of Online Submission
a) In Sealed cover in duplicate copies by Registered
(ii) Mode of Sending Post A.D, or by Courier.or hand delivery
b) Tender sent by ordinary post will be rejected out right.
(iii) Description essential to be
a) Name of work, Tender Notice No. & Tender No.
made on sealed cover b) Date of receiving tender by Corporations.
(iv) Mode of quoting rates in
The Price bid shall be submitted online only.
Schedule of Quantities and Rates It shall not be submitted Physically.
9. Date of Opening Dt.2.9.2026 , 15:00 hrs.
Submission of EMD. Tender fee and other Documents during office
Place of Submission & Opening of
10. hours: On date. 2.9.2026 & 12:00 hrs West Zone, 2nd Floor, A.M.
Tender Office, Dr. Ramanbhai Patel Bhavan, Usmanpura.Ahmedabad
Municipal Corporation, W.Z. Office, Ahmedabad-380013.
(1) Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2) Rs.2500
11. Penalty Due to Delay of work per day (for tenders amounting above 10 Lakhs and upto 30 Lakhs), (3)
Rs.5000 per day (for all tenders amounting above 30 Lakhs) but not more
then 10% of bill
12. Defect Liability As per ‘B-1 Form Close
Whenever a work is allotted by Engineering staff, whether minor or
major of part thereof of any amount, the contractor shall be bound
to start the works within 48 hours of intimation of work.
Time permitted to start parts of
13. Communication done telephonically via SMS, Via Whatsapp and
through letter / E-mail shall be considered legal and binding for the
same. Failure of comply to start the works in 48 hours of intimation
as above by contractor the contractor shall be levied penalty of (1)
Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and upto
30 Lakhs), (3) Rs.5000 per day (for all tenders amounting above
30 Lakhs). Three times failures by contractor shall make
contractor responsible to be black listed unless and otherwise
justified properly in writing / binding within 15 days of last notice of
14. ftuLx[t¾xhlu «J<obtl GST yjd&e åþfJJtbtk ytJNu
The staff of the contractor shall wear safety jackets,
shoes, helmets etc. while on duty and any violation will attract
a fine of Rs. 5,000/- for each incident.
15 Safety Failure to erect safety signage or trying to carry out
the works without proper precautions/safety measures as
required will attract a fine of Rs. 5,000/- for each incident.
Contractor's Sign Addl.C.E.(west zone)
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl - vrùbÍtul
y.Bgw.ftu. Ítul Ítulj ytuVem,
ztuo.hbKCtE vxuj CJl, WMbtlÃþht ath hM<t vtmu, ybœtJtœ. vrùb Ítul xuLzh ltuxem
lk-02-2026-27 btk ytJhe juJtguj ftbtule ÂJd<
1. Wvhtuf< xuLzhtu su btLg hSMx[uNl ^htJ<t ftuLx[t¾xh©eytuyu ztWljtuz fhe ChJt.
2. yt xuLzhtu zwÃjefux ftuveytu mt&u Chelu Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg< mbgbtk
btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, xuLzh ftuve <&t yLg vwhtJt mt&u
yawf mtbuj fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu. su ftuLx[tfxh©eytuyu
hSMx[uNl heLgw fhtJuj l ntug.
4. ftuLx[tfxhtuyu xuLzhbt cukfl wltb, Ft<t lkch, btEfh lkch ylu mhltBþ MvÐ yûthu jFÔþ.
5. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
6. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
7. xuLzh mt&u BþfJtbtk ytJ< hfblt ftb btxu htufzt, jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t
Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckuf duhkxelt MJYvbtk
8. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
9. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<&t btuctRj lkch yJ~g jFJtltu hnuNu.
ftuLx[t¾xhu vtu<&t ze.ze. xuLzh R~gw > <theF ct>lt s ytvJt.
10. Nh<e xuLzh hœ ct<j dKtNu.
11. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u
mbglu ftble BþÆ<btk bkswhe ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ œhuf
12. xuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrl.rmvj frb§h©ele hnuNu.
13. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykdu xuLzh Ch<t vnujt AuÕju r>Jmu rlg< JucmtEx y&Jt fauheyu sYhe <vtm
fhelu s xuLzh btufjÔþk.
14. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mw^ele ykœtS< hfblt ftb btxu htufzt, jtufj btRfh auf,
rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/
vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
15. mœh xuLzhbtk " GST rlgb Bþsc jtøþ vzNu. " <u Bþsc dKºte fhe xuLzh ChJtlt hnuNu.
zebtLz z[tVx / auf “Bgwrlrmvj frb§h©e, ybœtJtœ” lt ltbltu fZtJJtu.
As per Government of Gujarat G.R.No.- EMD/10/2021/7729/DMO Dt.28/06/2021 & Circular of
Finance Department, AMC No.10, Date: 05.08.2024, approved Banks are...
A. Guarantees issued by following banks will be accepted as SD/EMD on permanent basis.
B. All nationalized Banks
C. Guarantees issued by following banks will be accepted as SD/EMD for the period up to March-
2025. The validity cut-off date in the GR is with respect to the date of issue of Bank Guarantee
irrespective of the date of termination of Bank Guarantee.
1. Commercial Banks :-
1. A U Small Finance Bank
3. Bandhan Bank
4. City Union Bank
6. DBS Bank India Limited
8. Equitas Small Finance Bank
9. Federal Bank
14. IDFC First Bank
15. IndusInd Bank
16. Jana Small Finance Bank
17. Karnataka Bank
18. Karur Vysya Bank
19. Kotak Mahindra Bank
20. South Indian Bank
21. Tamilnadu Mercantile Bank
22. Utkarsh Small Finance Bank
2. Co-operative and Rural Banks Of Gujarat :-
1. The Ahmedabad Mercantile Co-operative Bank Limited
2. Kalupur Commerical Co-operative Bank Limited
3. Nutan nagrik Sahakari Bank Limited
4. Rajkot Nagarik Sahakari Bank Limited
5. Saraswat Co-operative Bank
6. SVC Co-operative Bank
7. The Cosmos co-opretive Bank
8. Baroda Gujarat Gramin Bank
9. Saurashtra Gramin Bank
10. The Gujarat State Co-Operative Bank
11. The Mehsana Urban Co-operative Bank Limited
12. The Surat District Co-operative Bank
13. The Surat Peoples Co-operative Bank
bu.Bgwrl.frb§h©e, ybœtJtœ Bgwrl. ftuvtuhuNllt mhfgwjh lk.-81, Bþsc <btb
«fthle fLMx[¾Nlle yu¾xeJexebtk BþÏg ftuLx[t¾xh, mc ftuLx[t¾xhlt su bswhtu ftbdehe fh<t
ntug <u <btb bswhtuLþk øþsht< rcÕz´d yuLz y^h fLMx[¾Nl Jfombtk hSMxuNl fhtJÔþ
AHMEDABAD MUNICIPAL CORPORATION
WEST ZONE ENGINEERING DEPARTMENT
Name of Work :- vrùb Ítul lJhkdvhw t Jtuzobt Bgw.ftW©e,^thtmÇg ©e <ubs
yLg csuxbtk&e lJhkdvwht dtb,htSJ ldh <ubs dtb<¤,atje rJM<thbt <ubs yLg
rJM<thbtk yth.me.me. htuz ylu lJe
Vwxvt& fhJtlt ftb ctc< (yu.yth.me.)
Sr. Quantity Item Description Rate Per Amount
1 1283.00 Box cutting the road surface to proper 127.13 Cmt.
slope and camber for making a base for
road work including removing the
excavated stuff and depositing on the
road side slope as directed upto
Mt.lead.(R&B SOR 2021-22 ITEM
CODE 26008 Item no.as per NBO 0 )
2 Conveyance charge of earth, lime,
murrum, building rubbish, manure,
garbage, sludge, excavated rock, fly ash,
aggregates of any kind executed outside
the road site. Rate also includes
spreading & levelling etc complete.
Internal conveyance above 50 mt done
within the work site is not payable.
(R&B 2021-22 Statement No.5 Page no.5
& RA Approved St.Com.Res
500.00 f) Lead From 5 Km to 10 Km. 78.54 Cmt
695.78 g) Lead From 10 Km to 15 Km. 104.65 Cmt
3 Extra rate over item of excavation of
earth for excavation of asphalt pavement
of thickness upto 0.20 meter including
demolishing the asphalt
carpet,metal,soiling etc.comp. with
stacking the material as directed.
(a) 107.19 up to 0.20 meter thickness (By 70.40 Smt
(b) 67.00 0.20 to 0.30 meter (By any type of 177.76 Smt
Breaker Machine or R.C.C.Cutter
machine including cost of operator, fuel,
& transportation etc complete.
4 426.00 Providing and laying cement concrete 2339.5 Cmt
1:3:6 (1- Cement : 3- Coarse sand : 6-
Hand broken stone aggregates 40mm
nominal size) and curing complete.(R &
B SOR Item code 05003A, NBO 5.3.2
5 1.00 Providing and laying controlled cement 3977.8 Cmt
concrete M.200 and curing complete
excluding the cost of formwork and
reinforcement for reinforced concrete
work in (A) Foundations, footings, Base
of columns and Mass concrete
6 Providing, laying, spreading and
compacting graded stone aggregate to
wet mix macadam specification
including premixing the Material with
water at OMC in mechanical mix plant
carriage of mixed Material by tipper to
site, laying in uniform layers in sub- base
/ base course on well prepared surface
and compacting with vibratory roller to
achieve the desired density as per Codal
7 150.00 Providing formwork of ordinary timber 171.68 smt
planking so as to give a rough finishi
ncluding centering shuttering strutting
and propping etc.Height of propping and
centering belows up porting floor to
ceiling not exceeding 4M. and removal
ofthe same for in situ reinforced concrete
and plain concrete work
in.(A)Foundations Footings Bases of
Columns etc. and Mass concrete.
8 5900.00 Providing TMT Bar FE 500D 75.46 Kg
reinforcement for R.C.C. work
including bending, binding and
placing in position complete upto
floor two level
10 167.00 Providing and laying in position Ready 4793.1 cmt
Mixed M-200 grade concrete for
reinforced cement conctere work , using
cement content as per approved Design
Mix manufactured in fully automatic
batching plant and transported to site of
work in transit mixer for a lead up to
kms having continuous agitated mixer,
manufactured as per mix design of
specified grade for reinforced cement
concrete work including pumping of
R.M.C. from transit mixer to site of
laying, excluding the cost of centering
shuttering finishing and reinforcement
including cost of admixtures in
recommended proportions as per IS:
9103 to accelerate/ retard setting of
concrete, improve workability without
impairing strength and durability as per
direction of the Engineer - in - charge.
Without Fly Ash (Min cement level as
per latest IS 456 shall be maintained)
11 1110.00 P/A Trimix with dewatering machine 54.00 smt
and floater machine on constructed RCC
work incl.cost of machine and labour etc
comp as directed. (Approved Rate)
12 150.00 Making 15 mm groove in RCC work on 30.00 rmt
road and filling it with polysulfied
sealant and finished it good incl. all
labour charges etc comp as directed.
(Approved Rate)
13 30.00 Demolition including stacking of 1047.3 Cu.m
serviceable materials and disposal of
unserviceable materials with all lead and
lift. (I) R.C.C work.(R&B SOR 2021-22
ITEM CODE 20002 Item no.as per NBO
14 Repairing damaged M.H. incl. removing
damaged brick and repairing by masonry
in C.M. 1:5 and plaster in C.M. 1:3 and
fixing C.I. steps and M.H. and carting
the same as directed.
(a) 15.00 (A) up to 0.15 mt. (@ Two Coarse) 728.82 No.
(b) 15.00 (B) up to 0.35mt. (@ Four Coarse) 1155.4 No.
15 20.00 Repairing damaged I.C./ Raising 399.96 No.
removing damaged brick work and
repairing by brick masonry in C.M. 1:5
and plaster in C.M. 1:3 and fixing C.I.
steps and existing chamber sheet cover,
removing the debris from chamber and
carting the same as directed. (Based on
DrainageSOR 2009-10)
16 150.00 Providing, supplying and fixing precast 195.54 Rmt
C.C. blocks (M-20) edge kerb having
size of 75 x 300 x 300 mm depth and as
per design conveying it to the site,
jointing into C:M 1:3 and racking out the
joints incl. necessary excavation of
asphalt, soil etc..completed.
17 200.00 Supplying and fixing of 300 mm-L x 150 350.89 Rmt
mm-B x 380 mm-H Kerb block for
Footpath in M-20 grade using 20 mm
nominal size black trap aggregate of
Sevaliya/Timba or equivalent quality for
pre-cast blocks, reasonably exposed
finish/ formwork , mould with well
equipped with vibratory system for kerb
stones of approved design including
curing, etc. complete, including the cost
of formwork etc. complete. The rate
shall also include necessary cutting of
asphalt, fixing the Kerb stones in line
and level on 5 cm thick sand bedding
with necessary equipments and
materials. The rate shall also include the
flush pointing in CM (1:3) for all joints
of the kerbstones. Filling of zari alone
the sides of the kerb stone fixed with
Bituminous concrete mixed in proper
position as directed by Engineer in
change to form a portable mixture. In
any case Gravel or such type of materials
shall not be allowed for production. a)
Laying on 5 cm thick Sand Bedding
18 90.00 Paver Block Providing and laying shot 669.65 Smt
blasted Non - interlocking, Paver blocks
of specified thickness, size, grade of
concrete and colour machine made and
blasting by automatic shot blasting
machine and high density of as per
approved sample of approved make for
footpath, parking areas, service
lanes,cross over and other areas as
mentioned in the drawing. Including
providing and laying 50 mm thick
averave bedding layer of coarse sand
below paver block as per required
grading and specification. Laid paver
block shall be mechanically compacted.
The work of the paving blocks shall be
executed in line and level by skilled
mason of flooring work only. Small size
of paver block with same specification
shall be used at residue or at end. It
should be laid in such a way that the no
cutting of the paver block to be
necessary. If cutting of paver block shall
be required , than cut by machine only
and laying to be done by skilled flooring
mason. The finished surface of the paver
block shall have coarse sand Texture
Finish. Pave blocks shall be compacted
and shall be re-laid if necessary. Actual
laid area shall be measured and paid
without any wastage. (A) 60 mm thick
M-35 grade Grey Paver block of size
3500.00 Providing and Laying of Rubber 501.6 Smt
Moulded Paver Block Grey/Coloured
mm thick, M-35 Grade of any size ;
shape (Usually Uni-Paver Blocks) using
black trap good quality aggragate of
mm nominal size for footpath, parking
areas, service lanes and other areas
as mentioned in the drawing / instruction
of engineer in charge. Cost includes
formworks using rubber mould, Rate
providing and laying paver blocks as per
required grading and specification. The
paver block shall be mechanically
compacted. The work of paving
blocks shall be executed in line and level
by skill mason of flooring work only. It
should be laid in such a way that the no
cutting of the paver block to be
necessary. if cutting of paver block
necessary then it should be cut by
machine only and carting. The finished
surface of the paver block shall have
resonably good, plain finished. Paver
blocks shall be compacted and shall be
relaid if necessary. Gravel or such type
of materials shall not be allowed for
production. Laying on 5cms thick sand
Labour work for fixing any kind of
paving with cement pointing in CM 1:2,
including watering, ramming etc comp.
800.00 For pavement 68.64 Smt
10.00 Constructing Bombay Pattern Type 3110.8 No.
Catch Pit of size 0.60 x 0.60 depth up to
1 mt including excavation, B.B.C.C.
(1:5:10), 23 cms thick brick maso. wall
in the prop. of CM (1:6) with 40 mm
thick IPS flooring in the prop M15 at
bottom and 15 mm thick cement plaster
inside the catch pit in the proportion of
CM (1:3) with out jali etc. comp. as
10.00 CatchPit Jali (Heavy duty) Fixing P/F 1377.6 No.
FRC catch pit jali with frame 600mm x
600mm clear opening etc. comp.. As
directed by engineer in charge.
Providing and supplying, lowering,
laying and jointing ISI mark only
standard length stoneware pipes of
following class and diameter including
all taxes, insurance, transportation,
freight charges, octroi, inspection
charges, loading, unloading, conveyance
to departmental stores, stacking etc.
compl. (IS651/1989 or its latest revision)
15.00 Providing and fixing 75 mm thick. Tree 1005.0 No.
guard as per design and drawing.The rate
shall be inclusive of providing and laying
50mm avg. thick. Sand bedding layer of
coarse sand below the tree guard as per
req.grading and specification.The centre
of grading to be 4 piece.The work of
thegrading bricks shall be executed in the
end of level by skilled mason of flooring
Providing F.R.C. MH seat cover incl.
24 carting to the work site etc. comp.
(SET cover and frame) F.R.C. Heavy 3255.6 Set
Duty [HD-20] Machinehole Covers &
Frames- 560mm ø clear opening, The
dimension of frame and cover as per
mentioned in Amend No.1 to IS
(SET cover and frame) F.R.C. Medium 2355.2 Set
Duty [MD-10] Machinehole Covers &
Frames- 560mm ø clear opening, The
dimension of frame and cover as per
mentioned in Amend No.1 to IS
:2002 table 1 (SET cover and frame)
(SET cover and frame) F.R.C. Medium 2254.9 Set
Duty [MD-10] Chamber Covers &
Frame- 600 x 450 mm clear opening,
The dimension of frame and cover as per
mentioned in Amend No.1 to IS
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION, (Hereinafter called “the Employer”)
invites sealed Tender document from reputed and qualified bidders for the construction of
Works detailed in the Table below:-
Sr.No Name of Works Approximate Bid Security (Rs.) Completio n
value of works Period
1 vrùb Ítul lJhkdvhw t Jtuzobt 4979807.26 50,0000/- 12 Month
Bgw.ftW©e,^thtmÇg ©e <ubs yLg
csuxbtk&e lJhkdvwht dtb,htSJ ldh
<ubs dtb<¤,atje rJM<thbt <ubs
yLg rJM<thbtk yth.me.me. htuz ylu
Vwxvt& fhJtlt ftb ctc<
2. T e n d e r (a complete set of bidding document) fee shall be Rs.1500/- in the form of
Demand Draft / Pay Order from any Nationalized Bank in favor of MUNICIPAL
COMMISSIONER, Ahmedabad, payable at Ahmedabad, which shall be non refundable. The
fees shall be paid at the time of submitting the tender.
3. Interested bidders shall download the tender documents from website
http://amc.nprocure.com and http://nprocure.com. tender fee as mentioned in clause 2 above
shall be paid by the bidder at the time of bid submission.
4. All bids must be accompanied by Bid Security of the amount specified for the Works in the
above Table payable at Ahmedabad and drawn in favor of AHMEDABAD MUNICIPAL
CORPORATION, Ahmedabad. Bid Security will have to be in any one of the forms as
specified in Clause of ITB (Instructions to Bidders).
5. All Bids must be delivered to Assistant Manager " West Zone, Zonal Office", Dr.Ramanbhai
Patel Bhavan Ushmanpura,Ahmedabad. Not later than 12:00 hrs on Dt.07 /03 /2025.
Seal and Signature of the Bidder Addl. City Engineer
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. Contractor shall produce the relevant registration certificate of AMC / State Govt /Central
2. Contractor shall register the work to labour commissioner as per labour act.
3. Contractor shall not sub-let the work without permission of the authority
4. Contractor should have sufficient skilled and unskilled laborers so that he shall start work at
different sites simultaneously. Contractor's having labour force available during festivals
shall only apply. Contractor can not stop the work due to on availably of labour force. In case
progress is delayed, contractor shall be penalized 0.1% of Tender amount per day for work
done after time limit, maximum up to 10% for remaining work.
5. Bitumen rate difference will be paid as per tender conditions, if applicable.
6. Advance payment / machinery advance will not be paid.
7. Payment of running bill will be made as per recent A.M.C. policy in force.
8. No extra payment will be made due to increase of central / state Govt. Taxes.
9. If the work is not completed within time limit the penalty will be recovered from immediate
bills of contractors.
10. If the material i.e. MH cover C.C block etc. supplied from Municipal Corporation store then
contractor shall not claim for any extra rate for non execution of such item, partly/fully.
11. In the specifications, "as directed"/"Approved" shall be taken to mean, "as
directed"/approved" by the Engineer-in-charge.
12. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to
mean as a reference to the latest edition of the same in force on the date of agreement.
13. In "Mode of Measurement" in the specifications wherever a dispute arises in the absence of
specific mention of a particular point or aspect, the provisions on these particular points, or
aspects in the relevant Indian Standards shall be referred to.
14. All measurements and computations, unless otherwise specified, shall be carried out nearest
to the following limits:
(i) Length, width and depth (height)------- 0.01 Meter.
(ii) Areas -----0.01 Sq. Mt.
(iii) Cubic Contents ------0.01 Cu.Mt.
15. The distance, which constitutes lead, shall be determined along the shortest practical route
and not necessarily the route actually taken. The decision of the Engineer-in-charge in this
regard shall be taken as final.
16. Where no lead is specified, it shall mean "all leads"
17. Lift shall be measured from plinth level.
18. Definite particulars covered in the items of work, through not mentioned or elucidated in it,
specifications shall be deemed to be included there in.
19. Reference to specifications of materials as made in the detailed specification of the items of
work is in the form of a designation containing the number of the specification of the
material and prefix 'M' e.g. 'M-5'.
20. Approval to the samples of various materials given by the Engineer-in-charge shall not
absolve the contractor from the responsibility of replacing defective material brought on site
or materials used in the work found defective at a later date.
21. The contract rate of the item of work shall be for the work completed in all respects.
22. No collection of materials shall be made before it is got approved from the Engineer-in-
23. Collection of approved materials shall be done at site of work in a systematic manner.
Materials shall be stone at site of work in a systematic manner. Materials shall be stored in
such a manner as to prevent damage, deterioration or intrusion of foreign matter and to-
ensure the preservation of their quality and fitness for the work.
24. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed
from the site of work within 24 hours.
25. No materials shall be stored prior to, during and after execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
26. All works shall be carried out in workmanlike manners per the best techniques for the
particular item.
27. All tools, templates, machinery and equipment for correct execution of the work as well as
for checking lines, levels, alignment of the works during execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
28. The mode, procedure and manner of execution shall be such that it does not cause damage or
over loading of the various components of the structure during execution or after completion
of the structure.
29. All necessary safety measures and precaution (including those laid down in the various
relevant Indian Standards) shall be taken to ensure the safety of men, materials and
machinery on the works as also of the work itself.
30. The testing charges of all materials shall be borne by the Contractor unless recovery at one
percent towards testing charges is separately made.
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of One Hundred Twenty Calendar
days (120) from opening of price bids.
SECURITY DEPOSIT
Within 10 days of receipt of Acceptance from the Corporation, the successful tender shall
furnish to the Corporation Security Deposit of 5% (Five Percent) of the contract price cheque or
Bank Guarantee, pay order, or demand draft of Nationalized Banks and Schedule Banks only.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 month period after the order to start the works. Progress of work
should be in proportion to time limit.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The
contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic.
He shall be responsible for any damage to public. If any incident happen, during the execution of
work. In case of dispute for unseen or overlooked items the decision of the Dy. City Engineer shall
be final. The contractor shall have to give site clean of all rubbish during the work and at the time of
completion of work and hand over the site with final finishing of the work as directed. All the
rejected materials shall be removed from site within 24 hours by contractor at this risk and cost.
Debris shall have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall have to
prepare through of bigger size and mix the mortar in the required proportion. In on case he shall be
allowed to mix the mortar either on floor or any finished surfaces. The contractor shall have to make
his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the contractor
and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if
item is not available in SOR than based on current market rates. In case of extra item decision of
Add. City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the
propose work the contractor shall carry out the same at his quoted rates without charges any extra
and the contractor will have to carry out the works and he will be paid at the rate quoted by him. No
claim for extra rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall
have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will
be fully responsible for compliance of the various provisions under contract Act. 1970 and the Rules
framed the to under.
The tender for the work shall remain open for a period (120) days from the date of opening of the
tenders for this work and that the tenderer shall not be allowed to withdraw on modify the offer on
his own during the period. If any tenderer withdraw or makes any modifications or addition in the
terms and conditions of his tender not acceptable to the Municipal Corporation the Municipal
Corporation shall without prejudice to any right or remedy be at liberty to forfeit in full the said
earnest money and black list the contractor.
If the work is not carried out within the specified time limit. from the date of order to start the work
the penalty of Rs.- (As per Form - B1) per day of delay shall be recovered from the immediate bills
payable to the contractor. Contractor has to make his own arrangement for procurement of steel and
Contractors should note the following conditions carefully:-
1. Conditional tender shall not be accepted.
2. All tenders are to be submitted in duplicate without which the tenders are liable to be
3. In case of tender downloaded from website, tender fee & EMD should be submitted in form
of demand draft or in cash.
4. Condition of Form - B1 Standard Specification of material & code of practice will be
applicable. Form B1 can be is available in website. Specification shall be as per ' R& B Dept.
- Govt. of Gujarat booklets of Building Works & and Road Works Specifications published
by Gujarat Book Depot, Sector-21. Gandhinagar.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child
Labour Prohibition and Regulation Act 1986. Hon'ble Supreme Court has given certain guide
lines and as per the guide lines. If child labour is employed on the site work, the contractor
shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the child labour
welfare fund. If the employer refuses to deposit then action will be taken for contempt of
Supreme Court Judgement and also will be prosecuted by concerned authority. Because of
the breach of any provision of child labour prohibition and regulation Act 1986 by the
Contractor & Municipal Corporation becomes liable to pay any amount then the Municipal
Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as
per its Reso. No. 1783 Date 06--02-97, but the Municipal Corporation Board has recently
decided that the actual testing charge is taken and the remaining amount is refundable at the
time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register
acordingly,and has to follow other govt.rules.
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim
shall be entertain regarding QUANTITIES.
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be
made by A.M.C. The same shall be placed on A.M.C website which may be downloaded by the
tendrers enclosed along with the tender duly signed. These shall form a part of tender. The tenderer
shall not add or amend the text of any of the documents except in so far as may be necessary to
comply with any addendum.
* ADDENDAUM / CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the
part of the contract documents. The full consideration shall be given to such addendum or
corrigendum or correction before submission tender duly filled in by the contractor. Therefore, the
contractor shall have to watch such addendum or corrigendum or correction published by A.M.C
through its website www.egovamc.com. Tenderes shall verify the number of addendum issued and
enclose the same with the tender documents,failing which the tender shall be liable for rejection and
no any complaint in respect to this shall be entertained under any circumstances.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNI CIPAL CORPO RATI ON ENGI NEER DEP ARTMENT
NAVRANGPURA WARD
TECHNICAL SPECIFICATION
Name of Work ;- vrùb Ítul lJhkdvhw t Jtuzobt Bgw.ftW©e,^thtmÇg ©e <ubs yLg csuxbtk&e lJhkdvwht dtb,htSJ ldh
<ubs dtb<¤,atje rJM<thbt <ubs yLg rJM<thbtk yth.me.me. htuz ylu lJ Vwxvt& fhJtlt ftb ctc<
General Technical Specification Section
Following technical specifications shall be applicable to the relevant items of BOQ
Box cutting the road surface to proper slope and camber for making a base for road
work including removing the excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead
Any soil which generally yields to the application of pickaxes and shovels, spades, rakes
or any such ordinary excavating implement or organic soil, gravel, silt, sand turf loam,
clay, peat etc. falls under this category. For materials and workmanship for earthwork
and excavation, relevant specification IS: 3764 & IS 1200 (Part I) shall be followed.
To protect persons from injury and to avoid damage to property, adequate
barricades, construction signs, red lanterns and guards as required shall be placed and
maintained during the progress of the construction work and until it is safe for the traffic
to use the roadways. The relevant Indian standards and the rules and regulations of
local authorities in regards to safety provisions shall be observed.
The depth of the excavation shall be as required. The site shall be cleared and all
obstructions, loose stones, materials and rubbish of all kind, bush; wood and all type
trees shall be removed, as directed. The materials so obtained shall be the property of
AMC and shall be conveyed and stacked as directed, within 50-m. lead. The roots of the
trees coming in the sides of the trenches shall be cut and coated with hot Bitumen.
All types of trees, woods etc. which requires prior permission of Govt./ Forest
Authority / Municipal Commissioner, before cutting shall be cut after obtaining such
permission from them. The rate of site clearance is deemed to be included in the rate of
The excavation shall be carried out in true line and level and having width and
depth, as shown in the drawings or as directed. The Contractor shall do the necessary
shoring and strutting or shall provide necessary slopes to a safe angle or steps, as
required or directed, at his own cost. No extra payment shall be made for such
precautionary measures, taken. The bottom of the excavated area shall be leveled both
longitudinally and transversely, as directed, by removing excess soil and watering, as
required. No earth filling will be allowed for bringing it to level, if by mistake or any
other reason, excavation is made deeper or wider than shown on the drawings or as
directed. The extra depth or width shall be made up with sand filling, as specified for the
bottom level of the subsequent finishing at the cost of the Contractor or as directed by
Engineer-In-Charge.
The Contractor shall at his own expense and without extra charge make provision
of supporting all utility services, lighting the excavated areas, separating and stacking
serviceable materials nearly, shoring, timbering, strutting, bailing out water either sub-
soil or rainwater, including pumping at any stage of the work. all Excavation work must
executed with manual labour only.
4.2. Precautions :
The blasting operation shall remain in charge of competent and experienced supervisor
and workman who are thoroughly acquainted with the details of handling explosives and
blasting operations. The blasting shall be carried out during fixed hours of the day,
preferably during the mid-day-lunch hours or at the close of the work as ordered in
writing by the Engineer-in-charge. The hours of blasting shall be notified in advance to
the people in the vicinity. All the charges shall be prepared by the man in charge only.
Red danger flags shall be displayed prominently in all directions during the blasting
People except this who actually light the fuse shall be prohibited from entering into this
area. The flag shall be stationed as 200 m. from the firing site in all directions and all
persons including workmen shall be excluded from the flagged area at least 10 minutes
before the firing warning whistle being sounded for this purpose.
During excavation in rock by blasting, the lowest 15 cm. of the stratas shall be blasted
with light charges so as not to shatter or weaken the underlying rock on which the
foundation will be actually laid. If excavation in rock is done to larger width and lengths
than those shown on the drawings or as directed, no payment shall be made for such
over break. If excavation is done to depth grater than shown on the drawings or
directed, excess depth shall be made up with foundation grade concrete as directed at
the contractor’s cost.
The charged hole shall be drilled to the required depth and in suitable places when
blasting Is done with powder, the fuse cut to the required length shall be inserted in the
holes and the powder dropped in. The powder shall be gently tamped with copper rod
with rounded ends. The explosive powder shall then be covered with trapping materials
which shall be tamped lightly but firmly. When blasting is done with dynamite and other
high explosive dynamite cartridges shall be prepared by inserting the square cut ends of
fuse into the detonator, and finished with dippers at the open ends. The detonator
should be gently pushed into the premier leaving one third of the copper exposed
outside. The primer shall be housed into the explosive. Bore holes shall be of such size
that the cartridges can be easily passed down. The primer shall be cleared of all debris
and explosive inserted. The space for about 20 cms. above the charge shall then be
gently filled with dry clay pressed home and rest of the tamping is firmed with any
convenient materials gently packed with a wooden cover.
At a time, not more than 20 such charges shall be prepared and fired. The man in
charge shall blow a whistle in a recognised manner for cautioning the people. All the
people shall then be required to move to safe distances. The charges shall be lighted by
the man in charge only. The man-in-charge shall count the number of explosions. He
shall satisfy himself that the charges have been exploded before allowing the workman
to go to the work site.
The contractor shall be fully responsible to strictly follow the prevailing rules and
procedures regarding blasting procedures.
In case of a misfire the following procedure shall be observed :
Sufficient time shall be allowed to account for the delayed blast. The man in charge shall
inspect all the charges and determine the missed charge.
If it is the blasting powder charge, it shall be completely flooded with water. A new hole
shall be drilled at about 45 cm. from the old and fired. This should blast the old charge.
Should it not blast the old charge. Should it not blast the old charge, the procedure shall
be repeated till the old charge is blasted.
In case of charge of gelatin, dynamite etc. the man in charge shall gently remove the
tamping and the primer with detonator. A fresh detonator and primer shall then be used
to blast the charge. Alternatively the hole may then be drilled 15 cm. away and parallel
to it. This hole shall then be charged fired when the misfired hole should explode at the
same time. The man in charge shall report to the office at once all cases of misfire, the
cause of the same and what steps were taken in connection therewith.
If a misfire has been found to be due to defective detonator or dynamite, the whole
quantity in the box from which defective article was taken must be sent to the authority
as directed for inspection to ascertain whether all the remaining materials in the box are
also defective or not.
4.3. Accidents :
The contractor shall be solely responsible for any accident during the entire procedure of
handling explosive and blasting and shall pay necessary compensation to persons
affected or damage t lands or properly etc., due to the blasting without extra claims on
the department.
A careful and day-to day account of explosives shall be maintained by the contractor in
an approved manner and shall be open to inspection of the Engineer-in-charge at all
times. Surprise visit may also be paid by the Engineer-in-charge to the storage and in
case of any unaccountable shortage or unsatisfactory accounting, the contractor shall be
liable to be penalised by forfeiture of part or whole of his Security Deposit or by
cancellation of tender in which case be shall not be entitled for any compensation.
4.5. Disposal of Excavated materials :
No materials excavated from foundation trenches of whatever kind they may be, are to
be placed even temporarily nearer than1.5m. of distance prescribed by the Engineer
from the outer edges of excavation. All materials excavated shall remain the property of
Government. Rate for excavation includes sorting out of useful materials and stacking
them separately as directed within the specified lead. Materials suitable and useful for
back filling or other use shall be stacked in convenient places but not in such a way as to
obstruct free movement of men, animals and vehicles or encroach upon the area
required for constructional purpose. The site shall be left clean of all debris on
Disposal of excavated materials is subject to the following :
Unsuitable materials obtained from clearing site and excavation shall be disposed off
within a lead of 50 meters as directed. useful materials obtained from clearing site and
excavation shall be stacked within a lead of 50 M. beyond the building area as directed.
Materials suitable for back filling shall be stacked at convenient places within a lead of
50 M. from the structure for reuse. Useful stones from rock excavation shall be stacked
neatly within a lead of 50 M. and will be allowed to be used by the contractor on
payment at rates laid down in the contract or if not so aid down, at schedule of rates of
the Division or at a mutually agreed rates if there are no such rates in the Schedule of
If surplus materials are required to be conveyed beyond 50 M. conveyance will be paid
for under a separate item.
4.6. Mode of measurement and payment :
The work shall be measured for the work limited to the dimensions shown on drawings
or directed, Excavation to dimensions in excess of the above will not be measured or
paid for and if so ordered by the Engineer the contractor shall have to fill up the excess
depth with cement concrete specified for foundation without extra payment.
Driving of sounding bards, drill holes to explore the nature of substratum upto a total
length of meter distributed in 2 or 3 places in each foundation if necessary, will be
considered incidental work and eill not be paid for separately.
Removal of slips and blows in the foundation trenches will not be measured or paid for.
If it is necessary in the opinion of the Engineer-in-charge to carry foundation below the
levels shown on the plants the excavation for the first 1.5 M. of additional depth will be
included in the quantity for the particular classification and will be paid for as extra work
at rate to be decided under the general conditions of contract unless the contractor
unless the contractor is willing to accept payment as tendered rates.
The rate shall be for a unit of one cubic meter.
Dismantling the following including loading, unloading and disposal of unserviceable
material for all lead or as directed by Engineer-In-Charge and stacking the serviceable
material and backfilling the resulting trenches and pits complete.
a. central verge -kerb stone.
b. Dismantling tiled or stone floors laid in mortar including stacking of
serviceable material and disposal of unserviceable material with all lead and
c. Demolition & disposal of unserviceable material with all lead and lift for
unreinforced concrete.
d. Demolition of brick work & stone masonry including stacking of serviceable
materials and disposal of unserviceable materials with all lead and lift (1) In
e. Demolition including stacking of serviceable materials and disposal of
unserviceable materials with all lead and lift. (I) R.C.C work.
The demolition shall consist of demolition of one or more parts of the structure as specified
or shown in the drawings. Demolition implies taking up or down or breaking up. This shall
consist of demolishing whole or part of work including all relevant item as specified or shown in
The demolition shall always be planned before hand and shall be done in reverse order of
the one in which the structure was constructed. Contractor is fully responsible for proper and safe
Necessary dropping, shoring and under pinning shall be provided for the safety of the
adjoining work or property, which is to be left intact, before dismantling and demolishing is
taken up and the work shall be carried out in such a way that no damages is caused to the
adjoining property.
Wherever required, temporary enclosures or partitions shall also be provide 1. Necessary
precautions shall be taken to keep the dust nuisance down as and where necessary.
Dismantling shall be commenced in a systematic manner. All materials which are likely to
be damaged by dropping from a height or demolishing roof, masonry etc. shall be carefully
dismantled first. The dismantled articles shall be properly stacked as directed. All materials
obtained from demolition shall be the property of Government unless otherwise d shall be kept in
safe custody until handed over to the Engineer-in-charge.
Any serviceable materials, obtained during dismantling or demolition shall be separated out
and stacked properly as directed, with all lead and lift. All unserviceable materials, rubbish etc.
shall b stacked as directed by the Engineer-in-charge.
On completion of work, the site shall be cleared of all debris rubbish and cleaned as directed.
Mode of measurements & payment :
Measurements of all work except hidden work shall be taken before demolition
dismantling and no allowance for increase in bulk shall be allowed. The demolition of lime
concrete shall be measured under this item. Specification for deduction for voids, openings etc.
shall be on same basis as that employed for construction of work.
All work shall be measured in decimal system as fixed in its place subject to the following
limits, unless otherwise stated hereinafter : (a) Dimensions shall be measured to the nearest
mt. (b) Area shall be worked out to the nearest 0.01 sq. mt. (c,d,e) Cubical connection shall be
worked out to the nearest 0.01 Cu.m.
The rate shall include cost of all labour involved and tools used in demolishing and
dismantling including scaffolding. The rate shall also include the charges for separating out and
stacking the serviceable materials properly and disposing the unserviceable materials with all
lead and lift. The rate also includes for temporary storing for the safety of the portion not
required to be pulled down or of adjoining property and providing temporary enclosures or
partitions where considered necessary.
The rate shall be for a unit of
one cubic metre. For
Dismantling of Tiled Floor:
The relevant specifications shall be followed except the dismantling of tiled or stone floors
laid on mortars shall be done Dismantling implies carefully taking up or down or these are fixed
by nail screws bolts etc. the shall be taken out with proper tools.
Mode of measurement & Payment :
The supporting materials such as joints beams if any etc. shall be measured separately. The rate
shall include stacking the unserviceable materials as directed will lead and lift.
The rate shall be for a unit of (a) RMT (b) one sq. Meter (C) CMT(d)Cu.m(e)Cu.m
Conveyance charge of earth, lime, murrum, building rubbish, manure, garbage, sludge,
excavated rock, fly ash, aggregates of any kind Including spreading & levelling etc.
e) Lead From 5 Km to 10 Km.
f) Lead From 10 Km to 15 Km.
All the surplus earth etc. shall be carried away immediately from the site of work
to a place within 5km.distance or as directed and ordered by the Engineer, so as not
to cause any inconvenience to the public traffic finding which in view of public safety
and traffic convenience. The corporation shall carry out the work byany other
agency at the contractor’s risk and cost. If the instructions are not completed within
days from the date of order to cart the surplus materials and clear the site, the
said work shall be carried out by the Municipal Corporation at the risk and cost of
the contractor and no claim or dispute shall be entertained in this respect.
If the filling in trenches after settlement of the earth filling in trenches is to be
done and the same shall be carried out by the contractor without asking any extra
rate. The contractor shall have to cart the surplus earth after the trenches we will
watered and refilled with the sand. The rate of carting including carting of brickbats,
metal, rubble vegetable and garbage, if necessary to clear the road surface.
The rate shall be for a unit of one cubic meter.
Extra rate over item of excavation of earth for excavation of asphalt pavement / RCC of
thickness up to 0.20 meter including demolishing the asphalt carpet, metal, soiling/cutting
Reinforcement etc. comp. with stacking the material as directed. (a) up to 0.20 meter
thickness (By Manual)(b) 0.20 to 0.30 meter (By any type of Breaker Machine or
R.C.C.Cutter machine including cost of operator, fuel, & transportation etc complete.(c)
0.30 meter & above (By any type of Breaker Machine or R.C.C.Cutter machine including
cost of operator, fuel, & transportation etc complete.
The Item shall be carried out as per Item description and as per instruction of Engineer-in-Charge
and/or his authorized representative.
The rate includes the cost of excavation of bituminous macadam i.e. bituminous layers only
like DBM, BC etc including the labours, tools, equipment and all other incidental expenses. Non
Bituminous Sub-layer/Sub base are not considered in this item.
Work shall be carried out manually or by Machinery as
per site requirements. The mode of payment for this
item shall be on Smt. Basis.
Providing and laying cement concrete 1:3:6 (1- Cement : 3- Coarse sand : 6- Hand
broken stone aggregates 40mm nominal size) and curing complete.
Before starting the concrete the bed of the foundations trenches shall be cleared
of all loose materials and watered and rammed as directed .
The proportion of cement, sand and coarse aggregate shall be one part of
cement, 3 parts of sand, 6 parts of stone aggregates and shall so measured by volume.
The concrete shall be mixed in a mechanical mixer at the site of work. Hand
mixing may however be allowed for smaller quantity of work if approved by the
Engineer-incharge. When hand mixing is permitted by the Engineer-in-charge incase of
breakdown of machinery’s and in the interest of the work. it shall be carried out on a
water tight platform and care shall be taken to ensure that mixing is continued until the
mass is uniform in colour and consistency. However in such cases 10% more cement
than otherwise required shall have to be used without any extra cost. The mixing in
mechanical mixer shall be done for a period 1 to 2 minutes. The quantity of water shall
be sufficient to produce a dense concrete of required workability for the purpose.
The concrete shall be handled from the place of mixing to the final position in not
more than 15 minutes by the method as directed and shall be placed into its final
position, compacted and finished within 30 minutes of mixing with water i.e. before the
setting commences.
The concrete shall be laid in layers of 15 cms. to 20 cms.
The concrete shall be rammed with heavy iron rammers and rapidly to get the
required compaction and to allow all the interstriees to be filled with mortar.
After the final set, the concrete shall be kept continuously wet, if required by pounding
for a period of not less than 7 days from the date of placement
The concrete shall be measured for its length breadth and depth, limiting
dimensions to those specified on plan or as directed.
The rate shall be for a unit of one cubic meter.
ProvidingandCastinginsitucontrolledCementConcreteM-200 for R.C.C.Raft
and cutt-off walls including necessary shuttering laying, vibrating, ramming and
curing complete.
Before starting the concrete the bed of the foundations trenches shall be cleared of
all loose materials and watered and rammed as directed. The proportion of cement, sand
and hand broken stone aggregates shall be one part of cement, parts of coarse sand,
parts of hand broken stone aggregates and shall so measured by volume. The concrete
shall be mixed in a mechanical mixer at the site of work. Hand mixing may however be
allowed for smaller quantity of work if approved by the Engineer- incharge. When hand
mixing is permitted by the Engineer-in charge in case of breakdown of machinery’s and
in the interest of the work. it shall be carried out on a water tight platform and care
shall be taken to ensure that mixing is continued until the mass is uniform in colour and
consistency. The quantity of water shall be sufficient to produce a dense concrete of
required workability for the purpose. The concrete shall be handled from the place of
mixing to the final position in not more than 15 minutes by the method as directed and
shall be placed into its final position, compacted and finished within 30 minutes of
mixing with water i.e. before the setting commences.
Mode of measurements shall be on CMT basis
Providing formwork of ordinary timber planking so as to give a rough finishi ncluding
centering shuttering strutting and propping etc.Height of propping and centering
belows up porting floor to ceiling not exceeding 4M. and removal ofthe same for in situ
reinforced concrete and plain concrete work in.(A)Foundations Footings Bases of
Columns etc. and Mass concrete.
Providing Formwork of ordinary timber planking so as to give a rough finish including
centering shuttering strutting and propping etc. Height of propping and centering below
supporting floor to ceiling not exceeding 4 M. and removal of the same for in situ reinforced
concrete and plain concrete work in. (A)Foundations Footings Bases of Columns etc. and
Mode of measurement shall be in Smt.
Providing TMT Bar FE 500D reinforcement for R.C.C. work including bending,
binding and placing in position complete upto floor two level
TMT bars shall conform to M-18. Mild steel binding wires shall conform to M-21
The work shall consist of furnishing and placing reinforcement to the shape and
dimensions shows as on the drawings or as directed.
Steel shall be clean and free from rust and loose mill scale at the time of fixing in
position and subsequent concreting.
Reinforcing steel shall conform accurately to the dimensions given in the bar bending
schedules shown on relevant drawings. Bars shall be bent cold to specified shape and
dimensions or as directed using a proper bar bender, operated by hand or power to attain
proper radius of bends. Bars shall not be bent or straightened in a manner that will injure the
material. Bars bent during transport or handling shall be straightened before being used on
the work. They shall not be heated to facilitate bending. Unless otherwise specified, a ‘U’
type hook at the end of each bar shall invariably be provided to main reinforcement. The
radius of the bend shall not be less than twice the diameter of the round bar and the length
of straight part of the bar beyond the end of the curve shall be at least four times the
diameter of the round bar. In case of bars which are not round and in case of deformed bars,
the diameter shall be taken as the diameter of circle having an equivalent effective area. The
hooks shall be suitably encased to prevent anysplitting of the concrete.
All the reinforcement bars shall be accurately placed in exact position shown on the
drawing and shall be securely held in position during, metal hangers, supporting wires or other
approved devices at sufficiently close intervals,. Bars shall not be allowed to sag between
supports nor displaced during concreting or any other operations of the work. All devices used
for positioning shall be of noncorrodible material. Wooden and metal supports shall no extend
to the surface of concrete, except where shown on drawings. Placing of broken stone or brick
and wooden blocks shall not be allowed. Pieces of broken stone or brick and wooden blocks
shall not be used. Layers of bars shall be separated by spacer bars, precast mortar blocks or
other approved devices. reinforcement after being placed in position shall be maintained in a
clean condition until completely embedded in concrete. Special care shall be exercised to
prevent any displacement of reinforcement in concrete already placed. To prevent
reinforcement from corrosion, concrete cover shall be provided as indicated on drawings. All
the bars producing from concrete and to which other bars are to be spliced and which are
likely to be exposed for a period exceeding 10 days shall be protected by a thick coast of neat
Bars crossing each other where required shall be secured by binding wires (annealed) of
size not less than 1 mm in such manner that they do not slip over each other at the time of
fixing and concreting.
As far as possible, bars of full length shall be used. In case this is not possible, overlapping
of bars shall be done directed. When practicable, overlapping bars shall not touch each other,
but be kept apart by 25 mm or 1.25 mm times the maximum size of the coarse aggregate
whichever is greater by concrete between them. Where not feasible, overlapping bars shall be
bound with annealed wires not less than 1 mm thick twisted tight. The overlaps shall be
staggered for different bears and located at points along the span where neither shear nor
bending movement is maximum.
Whenever indicated on the drawings or desired by the Engineer- in-charge, bars shall
be joined by coup lings which shall have a cross-section sufficient to transpit the full stresses
of bars. The ends of the bars that are joined by coupling shall be upset for sufficient length so
that the effective cross section at the base of threads is not less than norma l cross-section of
the bar. Threads shall be standard threads. Steel for coupling shall conform to I.S.
When permitted or specified on the drawings, joints of reinforcement bars shall be butt-
welded so as to transmit their full stresses. Welded joints shall preferably be located at points
when steel will not be subject to more than 75 percent of the maximum permissible stresses
and welds so staggered that at any one section not more than 20 percent of the rods are
welded. Only electric are welding using a process which excludes air from the molten metal
and conforms to any or all other special provisions for the work shall be accepted. Suitable
means shall be provided for holding bars securely in position during welding. It shall be
ensured that no voids are left in welding and when welding is done in two or three stages,
previous surface shall be cleaned properly. Ends of the bars shall be cleaned of all loose scale,
rust, grease, paint and other foreign matter before welding. Only competent welders shall be
employed on the work. the M.S. electrodes used for welding shall conform to I.S. 814. Welded
pieces of reinforcement shall be tested. Specimen shall be taken from the actual site and their
number and frequency of test shall be as directed.
M/s. shall be on kg. basis.
Providing and laying in position Ready Mixed M-200 grade concrete for reinforced
cement conctere work , using cement content as per approved Design Mix manufactured in
fully automatic batching plant and transported to site of work in transit mixer for a lead up to
10 kms having continuous agitated mixer, manufactured as per mix design of specified grade
for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of
laying, excluding the cost of centering shuttering finishing and reinforcement including cost of
admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of
concrete, improve workability without impairing strength and durability as per direction of the
Engineer - in - charge. Without Fly Ash (Min cement level as per latest IS 456 shall be
Providing and laying in position Ready Mixed M-200 grade concrete for reinforced
cement conctere work, using cement content as per approved Design Mix manufactured in
fully automatic batching plant and transported to site of work in transit mixer for a lead up
to 10 kms having continuous agitated mixer, manufactured as per mix design of specified
grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer
to site of laying, excluding the cost of centering shuttering finishing and reinforcement
including cost of admixtures in recommended proportions as per IS: 9103 to
accelerate/retard setting of concrete, improve workability without impairing strength and
durability as per direction of the Engineer - in - charge. Without Fly Ash (Min cement level
as per latest IS 456 shall be maintained)
Mode of measurement shall be in Cmt.
P/A Trimix with dewatering machine and floater machine on constructed RCC work
incl.cost of machine and labour etc comp as directed.
P/A Trimix with dewatering machine and floater machine on constructed RCC work incl.cost
of machine and labour etc comp as directed.
Measurements for Payment
The rate shall be for a unit of Square meter.
Making 15 mm groove in RCC work on road and filling it with polysulfied sealant and
finished it good incl. all labour charges etc comp as directed.
Making 15 mm groove in RCC work on road and filling it with polysulfied sealant and finished it good
incl. all labour charges etc comp as directed.
Measurements for Payment
The rate shall be for a unit of one meter.
Demolition including stacking of serviceable materials and disposal of unserviceable materials
with all lead and lift. (I) R.C.C work.
The rate shall be for a unit of cubic meter.
Repairing damaged M.H. and rasing M.H. up to road level incl. removing damaged brick
work and repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I.
steps and existing MH sheet cover, removing the debris from MH and carting the same as
a. up to 0.15 mt. (@ Two Coarse)
b. up to 0.35mt. (@ Four Coarse)
The rate shall be for a unit of no.
Repairing damaged I.C./ Raising removing damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing chamber
sheet cover, removing the debris from chamber and carting the same as directed.
The rate shall be for a unit of no.
Providing, supplying and fixing precast C.C. blocks (M-20) edge kerb having size of 75 x
x 300 mm depth and as per design conveying it to the site, jointing into C:M 1:3 and racking
out the joints incl. necessary excavation of asphalt, soil etc..completed.
Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H Kerb block for Footpath
in M-20 grade using 20 mm nominal size black trap aggregate of Sevaliya/Timba or
equivalent quality for pre-cast blocks, reasonably exposed finish/ formwork , mould
with well equipped with vibratory system for kerb stones of approved design including
curing, etc. complete, including the cost of formwork etc. complete. The rate shall also
include necessary cutting of asphalt, fixing the Kerb stones in line and level on 5 cm
thick sand bedding with necessary equipments and materials. The rate shall also
include the flush pointing in CM (1:3) for all joints of the kerbstones. Filling of zari
alone the sides of the kerb stone fixed with Bituminous concrete mixed in proper
position as directed by Engineer in change to form a portable mixture. In any case
Gravel or such type of materials shall not be allowed for production. a) Laying on 5 cm
thick Sand Bedding
Trenches of specified width and depth shall first be made along the edges of the
wearing course of the road or along the line of pave block flooring to receive the
restraint blocks. The bed of the trenches shall be compacted manually with steel
rammers to a firm and even surface and then stones shall be set in P.C.C.
The edge restraint blocks shall be laid with their length running parallet to the
paving edge, true in line and gradient. The joints of blocks shall be not more than
mm and filled with the CM 1:3 ( 1 cement : 3 fine sand ) which shall be cured for
Finishing The edges shall be restored and all surplus earth including rubbish etc.
disposed off as directed by the Engineer-in Charge.
Measurements Length of the finished work shall be measured in running metre
along the edge of the paving correct to a cm.
Rate The rate shall include the cost of the materials and labour including stone of
specified material involved in all the operation described above. The rate shall be for a
unit of one meter basis.
Paver Block Providing and laying shot blasted Non - interlocking, Paver blocks of specified
thickness, size, grade of concrete and colour machine made and blasting by automatic shot
blasting machine and high density of as per approved sample of approved make for
footpath, parking areas, service lanes,cross over and other areas as mentioned in the
drawing. Including providing and laying 50 mm thick averave bedding layer of coarse sand
below paver block as per required grading and specification. Laid paver block shall be
mechanically compacted. The work of the paving blocks shall be executed in line and level
by skilled mason of flooring work only. Small size of paver block with same specification
shall be used at residue or at end. It should be laid in such a way that the no cutting of the
paver block to be necessary. If cutting of paver block shall be required , than cut by machine
only and laying to be done by skilled flooring mason. The finished surface of the paver block
shall have coarse sand Texture Finish. Pave blocks shall be compacted and shall be re-laid if
necessary. Actual laid area shall be measured and paid without any wastage. (A) 60 mm
thick M-35 grade Grey Paver block of size 200mm x 200mm.
1.0 The scope of work: It includes supplying and laying of Precast shot blasted by automatic shot blasting
factory (not on site) paver blocks at footpath, parking area, service lane and other areas.
The work includes:
1.1 Paver block should be laid over prepared sub grade.
1.2 Clearing the site by removing all obstacles such as stones, debris etc. for laying of paver blocks.
1.3 Manufacturing of paver blocks by one of the approved suppliers as per requirements intechnical
1.4 Supplying of paver blocks at site, including handling at both ends. The type of paver block may be
interlocking or noninterlocking.
1.5 Providing and laying average 50 mm coarse sand bedding for laying blocks.
1.6 Laying of paver blocks at site as per requirement in technical specification, within shortest possible time.
1.7 Testing of paver blocks through reputed Govt. /Non Govt. Test house and submission of test results as
requirements in Technical Specifications. Client reserves the right to carryout test at random. Cost for such
borne by contractor.
1.8 The contractor shall guarantee that all material and components designed, fabricated, supplied and laid
be free from any type of defect due to faulty material and/or workmanship/erection for a period of five year
date of completion of work at individual sites. However, the contractor for five years shall render free
2.0 Technical Specifications:
2.1 Paver Block Manufacturing Facilities:
The Paver Block shall be made in factory with following minimum facilities:
Concrete Block making Machines:
The machine should be capable of producing high quality Paver Blocks by obtaining high level of compaction
application of hydraulic compaction and also by high intensity vibration to the moulds. The machine should
automatic control panel for uniformity in strength.
Concrete Batching & Mixing Plant: (Not essential) The concrete Mix Design should be followed for each batch
materials. The concrete ingredient should be mixed in concrete Batching & Mixing plant with minimum
cum/hour. The plant should be equipped with automatic control panel for maintaining water cement ratio from
batch to obtain concrete of uniform quality and strength.
The plant should be equipped with adequate mechanism for mechanized loading of raw materials into mixer
conveyor belt for transportation of concrete from mixer to concrete block making machine to maintain quality
The factory should have well designed curing area to ensure adequate curing of paver blocks. Steam curing
facility of the
paver blocks is preferable.
Laboratory (Desirable but not essential) :
The factory should have the following:
Compression testing machine of adequate capacity.
Other tools and equipment for testing raw materials and paver blocks.
(1) Systematic record of test results of various paver blocks manufactured in the factory.
(2) Concrete Mix Design for various grade of concrete used for making of paver blocks.
2.2 Specifications for Coloured Paver Blocks:
Colour concrete paver blocks shall be manufactured as per attached specifications using approved colour
Pigment of iron
oxide of approved brand like Bayer, Tata etc. with minimum colour pigment of 3% by weight of cement. The
shall be as selected by Architect before commencement of the work. The job also includes providing 50 mm
bedding to match the shade of the paver block.
The colour of the paver block shall be guaranteed against fading of colour for period of 12 months from the
of the same at site.
All other technical specifications & Procedure for testing, laying & sampling of Color pavers will be as per
2.3 Paver Block Characteristics:
The concrete pavers should have perpendicularities after release from the mould and the same should be
The surface should be reasonably smooth and of anti skid and anti glare type. The paver should have uniform
facilitate easy drainage surface run off.
The pavers should have uniform interlocking space of 2mm to 3mm to ensure compacted sand filling after
the paver Surface.
The concrete mix design should be followed for each batch of materials separately and automatic batching
used to achieve uniformity in strength and quality.
The pavers shall be manufactured in Double layer only.
Skilled labour should be employed for laying blocks to ensure line and level of laying, desired shape of the
adequate compaction of the sand in the joints.
2.4 Paver Block Dimensions:
Layers Double layered, top layer minimum 8 to 10 mm
Shape Irregular (Uniform Shape with no Hollow Or Cracks) / as per drawing
Chamfer 4mm to 6mm along top edges
Colour Natural cement grey Colour without use of any pigment.
For Colour pavers refer “specifications for Colour pavers”
Dimensional (+/-) 2mm for length & width,
Tolerance (+/-) 3mm for Height (Thickness)
2.5 Testing of Paver Blocks:
* Sampling and testing procedure as per enclosed specifications
3.0 Sampling & Testing Procedures for Paver Blocks:
3.1 Sample Size:
INTERNAL – Average of minimum 3 samples per 10000 Blocks for compressive strength and water
EXTERNAL – Minimum 2 Blocks per 10000 blocks for abrasion and flexure.
3.2 Sampling For Testing: Sampling for testing of paver blocks shall be done in accordance with Appendix-A.
Compressive Strength: Testing for compressive strength shall be undertaken in accordance with Appendix-B.
compressive strength of the blocks tested shall be 30/40 N/Sq.mm as per thickness.
Abrasion Resistance: Testing for abrasion shall be in accordance with IS 1237 (Specifications for Cement
Flexural Strength: Testing for flexural shall be in accordance with IS 1237 (Specifications for Cement Concrete
Water Absorption: Testing for water absorption shall be in accordance with IS 2185:1979: Part I (Specifications
Concrete Masonry Units).
Method of sampling: Before laying paver blocks, each designated section comprising not more than
be divided into five approximately equal groups. One block shall be drawn from each group i.e. 3 for internal
for external testing.
Marking and identification: All samples shall be clearly marked at the time of sampling in such a way that the
sections of part thereof, and the consignment represented by the sample, are clearly defined.The sample
dispatched to the approved test laboratory taking precaution to avoid damage to the paving in transit. Protect
from damage and contamination until they have been tested. The testing shall be carried as soon as possible,
sample has been taken. As soon as practicable after sampling. The samples shall be stored in water at
hours prior to testing.
SR.NO. * TEST SPECIFICATION Average Values
(Average of Minimum Five Samples/Site)
1. Compressive Strength Min. 30 N/Sq.mm for 60mm thick and Min. 40 N/Sq.mm
2. Flexural Strength Minimum 3.80 N/Sq.mm and 4.5 N/ Sq. mm for 60 and
mm thick paver block respectively.
3. Abrasion Resistance Maximum
4. Water Absorption Maximum 5.80%
5. Minimum Cement Content 380 Kg/Cum for M 30 concrete and 430 Kg/Cum for M 40 concrete
3.0 Sampling & Testing Procedures for Paver Blocks:
3.1 Sample Size:
INTERNAL – Average of minimum 3 samples per 10000 Blocks for compressive strength and water
EXTERNAL – Minimum 2 Blocks per 10000 blocks for abrasion and flexure.
3.2 Sampling For Testing: Sampling for testing of paver blocks shall be done in accordance with Appendix-A.
Compressive Strength: Testing for compressive strength shall be undertaken in accordance with Appendix-B.
compressive strength of the blocks tested shall be 30/40 N/Sq.mm as per thickness.
Abrasion Resistance: Testing for abrasion shall be in accordance with IS 1237 (Specifications for Cement
Flexural Strength: Testing for flexural shall be in accordance with IS 1237 (Specifications for Cement Concrete
Water Absorption: Testing for water absorption shall be in accordance with IS 2185:1979: Part I (Specifications
Concrete Masonry Units).
Method of sampling: Before laying paver blocks, each designated section comprising not more than
be divided into five approximately equal groups. One block shall be drawn from each group i.e. 3 for internal
for external testing.
Marking and identification: All samples shall be clearly marked at the time of sampling in such a way that the
sections of part thereof, and the consignment represented by the sample, are clearly defined.
The sample shall be dispatched to the approved test laboratory taking precaution to avoid damage to the
transit. Protect the paving from damage and contamination until they have been tested. The testing shall be
soon as possible, after the sample has been taken. As soon as practicable after sampling. The samples shall
water at 20 degree C 5 degree C for 24 hours prior to testing.
Test For Compressive Strength:
Testing Machine: The testing machine shall be of suitable capacity for the test and capable of applying the load
rate specified. It shall comply, as regards repeatability and accuracy, with the requirements of clause 2.1 of
Procedure: The sample specimen shall be tested in a wet condition after being stored for at least 24 hours in
maintained at a temperature of 20 C + or – 5 C. Before thespecimens are submerged in water, the
necessary area shall
The plates for testing machines shall be wiped clean and any loose grit or other material removed from the
of the specimen. Plywood, nominally 4 mm thick shall be used as packing between the upper and lower faces
specimen and the machine plates and these boards shall be larger than the specimen by the margin of at
at all points. Fresh Packing shall be used for every specimen tested.
The specimen shall be placed in the machine with the wearing surface in the horizontal plane and in such a
axes of the specimen are aligned with those of the machine plates.
The load shall be applied without shock and increased continuously at the rate of approximately 15 N/ Sq.mm
until no greater load can be sustained. The maximum load applied to the specimen shall be recorded.
Calculation of corrected strength for individual Blocks: The compressive strength of each block specimen shall be
calculated by dividing the maximum load by full cross section area of the block and multiplying with an
appropriate factor
a) For 100 mm thick blocks –
b) For 80 mm thick blocks –
c) For 60 mm thick blocks –
Ahmedabad Municipal Corporation
Compressive Strength Calculation: The average corrected compressive strength for the designed block section
4.0 Method of laying:
Blocks shall be placed on the sand bedding etc. which were well rammed so as to act as firm bed. Blocks
shall be laid in
such manner that no gap shall be left in between. Blocks so laid shall be compacted by means of mechanical
equivalent compacting method so as to obtain required finished surface. All the joints shall be matched and if
manufacturing defect is detected the lot shall be replaced and relaying shall be done with out any extra cost
satisfaction of Engineer in charge.
50 to 80mm thick coarse sand shall be laid as cushioning layer for arranging the paver blocks. Joints of the
shall be filled with the sand.
The paver blocks shall be laid properly on the prepared sub-base as per manufacturer's specification and as
and Engineer-in-charge's instruction.
Paver block shall be laid by the approved agency only. If manufacturer of the paver block providing the laying
then it shall be laid through the supplying agency only. The labourers for paver block fixing shall be skilled
only. Only cutting tool shall be used for cutting the paver block. Full depth cutting toll shall be used for proper
surface after cutting. Manual cutting or breaking of the paver block is not permitted.
After laying of the paver block fine sand shall be spread over it and paver block shall be compacted with
compactor. Any settlement or undulation in the laid area shall be repaired immediately.
5.0 Mode of Measurement and payment:
Measurement shall be done as per actual area laid without considering any wastage.
The Measurement of the item shall be in Sqmt basis.
Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm thick, M-35
Grade of any size ; shape (Usually Uni-Paver Blocks) using black trap good quality
aggragate of 20 mm nominal size for footpath, parking areas, service lanes and
other areas as mentioned in the drawing / instruction of engineer in charge. Cost
includes formworks using rubber mould, Rate providing and laying paver blocks as per
required grading and specification. The paver block shall be mechanically compacted.
The work of paving blocks shall be executed in line and level by skill mason of flooring
work only. It should be laid in such a way that the no cutting of the paver block to be
necessary. if cutting of paver block necessary then it should be cut by machine only and
carting. The finished surface of the paver block shall have resonably good, plain
finished. Paver blocks shall be compacted and shall be relaid if necessary. Gravel or such
type of materials shall not be allowed for production. Laying on 5cms thick sand
Scope of work :
Excavation and compaction up to 30 cm in height . for footpath paving in all sorts of soil
murrum including sorting outs and stacking of useful materials stuff up to 50 mt. lead
from excavated place and same well be carting. Up to 5 km.
The scope of work includes manufacturing, supplying and laying of precast paver blocks
at various Retail outlets. The work includes :
Verification of the existing site condition and advising our project in charge to lay
suitable base course if required. Contractors are required to satisfy themselves with
quality of sub grade, sub-base course before the paver blocks are laid and suggest
strengthening if required.
Clearing the site by removing all obstacles such as stones, debris etc. for laying of
Manufacturing of paver blocks in your plant as per requirements in technical
specification enclosed.
Supplying of paver blocks at site, including handling at both ends.
Laying of paver blocks at site as per requirement in technical specification, within
shortest possible time. The site being existing operating Retail Outlets, care should be
taken to ensure that the operation is not closed. The job of laying may required to be
carried out during night also.
Testing of paver blocks through reputed Govt./Non Govt. Test house and submission of
test results as per requirements in Technical Specifications. HPCL reserves the right to
carryout test at random. Cost for such tests to be borne by party.
The contractor shall guarantee that all material and components designed, fabricated,
supplied and laid by him shall be free from any type of defect due to faulty material
and/or workmanship/erection for a period of One year from the date of completion of
work at individual sites. However, the contractor fro two years shall render free
TECHNICAL SPECIFICATIONS :
I) Paver Block Manufacturing Facilities :
The Paver Block shall be made in factory with following minimum facilities :
1.1 Concrete Block making Machines :
The machine should be capable of producing high quality Paver Blocks by
obtaining high level of compaction by application of hydraulic compaction and
also by high intensity vibration to the moulds. The machine should have
automatic control panel for uniformity in strength.
1.2 Concrete Batching & Mixing Plant : (Not essential)
The concrete Mix Design should be followed for each batch of materials. The
concrete ingredient should be mixed in concrete Batching & Mixing plant with
minimum capacity of 30 cum/hour. The plant should equipped with automatic
control panel for maintaining water cement ratio from batch to batch to obtain
concrete of uniform quality and strength. The plant should be equipped with
adequate mechanism for mechanized loading of raw materials into mixer and
conveyor belt for transportation of concrete from mixer to concrete block making
machine to maintain quality of wet cement.
1.3. Curing:- The factory should have well designed curing area to ensure adequate
curing of paver blocks.
Laboratory (Desirable but not essential) :
The factory should have the following:
Compression testing machine of adequate capacity.
Other tools and equipment for testing raw materials and paver blocks.
(1).Systematic record of test results of various paver blocks manufactured in the
(2).Concrete Mix Design for various grade of concrete used for making of paver
II) SPECIFICATIONS FOR COLOURED PAVER BLOCKS :
Coloured concrete paver blocks shall be manufactured as per attached
specifications using approved colour Pigment of “BAYER” Make “BAYFERROX
IRONOXIDE PIGMENTS” with minimum colour pigment of 3% by weight of cement. The
colour shade shall be “RED” as selected by HPCL before commencement of the work.
White cement shall be used for colored pavers to obtain the desired colour shade. The
job also includes providing 50 mm thick sand bedding to match the shade of the paver
The colour of the paver block shall be guaranteed against fading of colour for
period of 12 months from the date of laying of the same at site.
All other technical specifications & Procedure for testing, laying & sampling of
coloured pavers will be as per attachment.
III) PAVERS BLOCK CHARACTERISTICS :
The concrete pavers should have perpendicularities after release from the mould and
the same should be retained until the laying.
The surface should be reasonably smoothe and of anti skid and anti glare type.
The paver should have uniform chamfers to facilitate easy drainage surface run off.
The pavers should have uniform interlocking space of 2mm to 3mm to ensure
compacted sand filling after vibration on the paver Surface.
The concrete mix design should be followed for each batch of materials separately and
automatic batching plant is to be used to achieve uniformity in strength and quality.
The pavers shall be manufactured in single layer only.
Skilled labour should be employed for laying blocks to ensure line and level of laying,
desired shape of the surface and adequate compaction of the sand in the joints.
The pavers shall be of cement gray colour without any pigment & for coloured pavers
refer “specifications for coloured pavers.”
The pavers are to be skirted all round with kerbing using solid concrete blocks of size
150mm X 250mm X 380mm. The kerbing should be embedded for 100mm depth. The
concrete used for kerbing shall be cured properly for 7 days minimum.
IV) Paver Block Dimensions :
Thickness 60mm or 80mm
Shape Uniregular (Uniform Shape with no Hollow
Chamfer 4mm to 6mm along top edges
Colour Natural cement grey colour without use of
For coloured pavers refer “specifications
for coloured pavers”
Dimensional Tolerance (+/-) 2mm for length & width,
(+/-) 3mm for Height (Thickness)
V) Testing of Paver Blocks :
SR. Average Values
NO. (Average of Minimum
Five Samples/Site)
1. Compressive Strength Min. 45 N/Sqmm for 80mm
thick OR Min. 35 N/Sqmm for
2. Flexural Strength Minimum 4.5 N/Sqmm
3. Abrasion Resistance Maximum
4. Water Absorption Maximum 5.80%
5. Minimum Cement Contact 380 Kg/Cum (Not Essential)
* Sampling and Testing procedure as per enclosed specifications
SAMPLING AND TESTING PROCEDURES FOR PAVER BLOCKS.
INTERNAL – Average of minimum 3 samples per 5000 Blocks.
Essential – Minimum 2 Blocks per 10000 bocks. Average of minimum 8 blocks per site.
1. Sampling For Testing
Sampling for testing of paver blocks shall be done in accordance with Appendix-
Compressive Strength
Testing for compressive strength shall be undertaken in accordance with
The average compressive strength of the bocks tested shall be 35 N/Sqmm.
Abrasion Resistance
Testing for abrasion shall be in accordance with IS 1237 (Specifications for
Cement Concrete Floor Tiles) – Appendix C.
Flexural Strength
Testing for flexural shall be n accordance with IS 1237 (Specifications for Cement
Concrete Floor Tiles) – Appendix D.
Water Absorption
Testing for water absorption shall be in accordance with IS 2185:1979 : Part I
(Specifications for Concrete Masonry Units) – Appendix E.
Sampling of Paver blocks.
1. Method of sampling :
Before laying paver blocks, each designated section comprising not more than
50000 blocks, shall be divided into ten approximately equal groups. Three blocks shall
be drawn from each group.
Marking and identification :
All samples shall be clearly marked at the time of sampling in such a way that the
designated section of part thereof, and the consignment represented by the sample, are
clearly defined.
The sample shall be dispatched to the approved test laboratory taking precaution
to avoid damage to the paving in transit. Protect the paving from damage and
contamination until they have been tested. The testing shall be carried as soon as
possible, after the sample has been taken. As soon as practicable after sampling. The
samples shall be stored in water at 20 degree C 5 degree C for 24 hours prior to
Labour work for fixing any kind of paving with cement pointing in CM 1:2, including watering, ramming etc comp. as
directed For pavement
The Measurement of the item shall be in Sqmt basis.
Constructing Bombay Pattern Type Catch Pit of size 0.60 x 0.60 depth up to 1 mt
including excavation, B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the prop. of CM
(1:6) with 40 mm thick IPS flooring in the prop M15 at bottom and 15 mm thick cement
plaster inside the catch pit in the proportion of CM (1:3) with out jali etc. comp. as
directed. The Measurement of the item shall be in no basis.
CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit jali with frame 600mm x 600mm
clear opening etc. comp.. As directed by engineer in charge.
The Measurement of the item shall be in no basis.
Providing and supplying,and jointing ISI mark
only standard length stoneware pipes of following class and diameter including
excavation for laying of pipes, insurance, transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to departmental stores, stacking etc. compl.
(IS651/1989 or its latest revision) including labour work for lowering, laying,
joiting with cement mortar (1:1) proportion, proper postion, grade and alignment
and all level as directed by engineer in charge including store to site of work jointing
etc complete 230 mm dia
The Measurement of the item shall be in Rmt basis.
Item no.23 (a,b,c)
Providing F.R.C. MH seat cover incl. carting to the work site etc. comp. Directed.
(SET cover and frame) F.R.C. Heavy Duty [HD-20] Machinehole Covers & Frames- 560mm ø clear
opening, The dimension of frame and cover
(SET cover and frame) F.R.C. Medium Duty [MD-10] Machinehole Covers & Frames- 560mm ø clear
opening, The dimension of frame and cover
(SET cover and frame) F.R.C. Medium Duty [MD-10] Chamber Covers & Frame- 600 x 450 mm clear
opening, The dimension of frame and cover
Providing and laying for approved quantity (ISO Certified brand) floor hardener @
The Measurement of the item shall be in Smt basis.
Seal and Signature of the Bidder Add.City Engineer(West Zone)
Amdavad Municipal Corporation
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl – vrùbÍtul
vrùb Ítul Ítulj ytuVem,
1. Wvhtuf< xuLzhtu su <u Jdobtk btLg hSMx[uNl ^htJ<t ftuLx[tfxh©eytuyu ChJt.
2. xuLzhle rlg< xuLzh Ve <&t R.yub.ze. ck^ fJhbtkk Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg<
mbgbtk btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, (xuLzh ftuve <&t yLg
vwhtJt mt&u) yawf mtbuj fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.ck^
fhJh Wvh xuLzh ltuxem lkch, xuLzh lkch, ftblwk ltb <&t, ftuLx[[tfxhle mkM&tlwk ltb <&t ftuLxufx lkch yJ~g
œNtoJJtlt hnuNu. ftuLx[tfxhtuyu xuuLzhbt cukfl wltb, Ft<t lkch, btRfh lkch ylu mhltb wMvÐ yûthtubtk jFJw.
4. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
5. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
6. xuLzh mt&u BþfJtbtk ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhLxe / zebtLz z[tVx / vu ytuzoh / jtufj btRfh
auf&e s MJefthJtbtk ytJNu. œhuf xuLzh œeX yjd R.yub.ze. ChJtle hnuNu. R.yub.ze. hfb Yt. yuf fhtuz mwDele
ykœtS< hfblt ftb btxu jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e
Wvhle ykœtS< hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckuf duhkxelt MJYvbtk ytvJtle
7. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
8. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj lkch
yJ~g jFJtltu hnuNu. ftuLx[t¾xhu vtu<tle mkkM&tlt auf <&t ze.ze. xuLzh R~gw > <theF ctœlt s ytvJt.
9. Nh<e xuLzhtu hœ ct<j dKtNu.
10. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u
mbglu ftble BþÆ<btk bshu ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^
>huf xuLzhh ujuJe.
11. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele hnuNu.
12. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu sYhe
<vtm fhelu s xuLzh btufjJw.
13. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf,
rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe
zevtuÍex/ vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
14. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto
Jdhle mne mefft fhe mcbex fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
15. dwsht< mhfth ©b,ftuiNÕg ylu htusdth rJCtd îtht XhtJ ¢btf:LED/WRT/e-file/11/2024/0293/M2
mraJtjg ,dtk^eldh <t.15.02.24 lt XhtJ v{btKu yusLme/¢tuLx[fxhtulu îtht ©bgtude ftgœtle studJtR vhevqKo
&tg <u mwrlµ< fhJtlwk hnNu.
16. ybœtJtœ Bgwrlrmvj ftuvtuohuNl îtht ybœtJtœ Nnuh lt ltdheftulu vwhe vtzJtbtk ytJ<e mwrJ^tytulu jd<e Vhegtœ
ltuk^Jt btxu me.me.yth.yum «tusufx ybj bwfJtbtk ytJuj Au.su yk<do< su <u zevtxobuLx JtRÍ le fuxdhe lt «tuçjb
lt rlhtfhK btxu yum.yuj.yu mbg dt¤tu rl^tohe< fhJtbtk ytJuj Au.su yk<do< vrµbÍtullt lJhkdvwht Jtuzolt htuz
ylu Vwxvt< Jtr»tof huRx xuLzhbtk bhtb<-rlCtJltk htuz ylu Vwxvt& buLxulLm lt swœt swœt ftbtu btxu ltdhef
yr^fth vºtfbtk sKtJuj mbg bgtoœtbtk Vhegtœltu rlftj fhJt <ubs muJtfeg ftbdehe mbg bgtoœtbtk vqKo &tg <u
btxu R-dJolLm me.me.yth.yum. «tusufx yk<do< <t.21.08.2021 lt mhfgwjh <&t mexe Rsluh Ft<w vrhvºt
lk.2,<t.07.10.2023 lt vrhvºt,Bgw frb.©ebe <t.23.04.2026 le belexm ytuV bexekd lt bwœt lk.21
ylwmk^tlu leau bwscle mtbuj fhuj Nh<tu bwscle vulÕxe Jmwj fhJtle Nh<u bkswhe y&uo mtœh fhuj Au
xuLzhbtk mtbuj fhuj Nh<tu yt «btKu Au
me.me.yth.yum.btk ltu^t<e Vhegtœ Jtuzolt Rsluh MxtV îtht ftuLx[tfxh/yusLmelu Jtuxmyuv/xujeVtulef btægb&e
y&Jt YcY juFe<btk Vhegtœ ytvJtbtk ytJNu.mœh Vrhgtœle ftbdehe yum.yuj.yu. le mbg bgtoœtbtk
ftbdehe vqKo > ctœ <ult Vtuxtud{tV,mxeoVefux ylu ftbdehe vqKo > le òK yum.yuj.yu. mbg bgtoœtbtk
Jtuzolt MxtVlu fhJtle hnuNu
stu ytvlu ytvuj Vrhgtœ yum.yuj.yu. mbg bgtoœtbtk vqKo lne &tg <tu vulÕxe le hfb ytvlt cejbtk&e Jmwj
ytvlu mtuvJtbtk ytJuj me.me.yth.yum. Vrhgtœtu ltu hevtuxo yXJtzef ^tuhKu rlg< Vtubuoxbtk «btrK< fhe Jtuzo
ytuVemu hsw fhJtltu hnuNu.
ftuLx[tfxh îtht yhsœthlu Vtul fgto ctœ mœh Vrhgtœ yLg Jtuzo fu yLg rzvtxobuLx fu y.Bgw.ftuvtuohuNl lt
ftgoûtuºtbtk l ytJ<e ntuR <ule òK Jtuzo MxtV lu <tðftrjf fhJtle hnuNu.
ftuLx[tfxhle mrn <&t me¬tu yuze.mexe Rsluh (v.Ítul)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 63.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .