| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 LAccepted-AOC | L1 | Accepted-AOC since L1 is accepted | |
| 2 | L2₹9.3 L+₹61,789.37 (7.14%)Rejected-AOC VRP XX 537 RAJEEV HOUSE THOZHICHAL MULAVILAKAM THIRUVANANTHAPURAM KERALA 695527 | THIRUVANANTHAPURAM | THIRUVANANTHAPURAM | KERALA | 695527 | L2 | Rejected-AOC since L2 is rejected |
Tender Value
₹10.2 L
EMD Value
₹25,700
Closing Date
17 Jan 2023, 6:00 pmClosed
AEE HESD TKY
AEE HESD TKY
Construction of compound wall and providing gate at Thangassery
2023_HED_545978_1
10/2022-23/AEE
Open Tender
Civil Works - Others
Item Rate
180 days
Thangassery Fishery Harbour
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,670
₹25,700
Yes
3 Apr 2023
4 Jan 2023
20 Jan 2023
4 Jan 2023
17 Jan 2023
4 Jan 2023
Amount
Appendix A Construction of Compound Wall
15.19 : Dismantling steel work manually / by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per directions of Engineer -in-Charge.
15.7.4 : Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
15.9.2 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
60.7.8 : DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
50.6.2.2 : Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
5.1.3 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
13.4.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand)
13.16.1 : 6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
5.18.1 : Providing precast cement concrete jali 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 6 mm nominal size) reinforced with 1.6 mm dia mild steel wire including centering and shuttering, roughening cleaning, fixing and finishing in cement mortar 1:3 (1 cement : 3 fine sand ) etc. complete excluding plastering of the jambs, sills and soffits.50 mm thick
10.16.3 : Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Electric resistance or induction butt welded tubes
od2451/2022_2023 : Laterite stone cladding using neatly dressed stones of size 30cmx24cm or nearest size using in adhessive paste applying in wall and tiles , thin joints as per the instruction of departmental officers at site including all cost of conveyance and labour charges etc. complete.
od2452/2022_2023 : Finishing walls with Smooth exterior texture paint approved quality & additives of required shade
13.52.1 : Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
RENJITH R A
Bidder Name
ABDUL RASHEED
RENJITH R A
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_798455.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .