Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | ₹4.9 L | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹5.0 LRejected-Finance | ₹5.0 L | L2 | Rejected-Finance HIGHER BID VALUE |
| 3 | L3₹5.0 LRejected-Finance | ₹5.0 L | L3 | Rejected-Finance HIGHER BID VALUE |
Tender Value
₹4.9 L
EMD Value
₹10,000
Closing Date
24 Jan 2026, 1:00 pmClosed
EE/IGWTP
OFFICE OF THE EE/IGWTP, MONIRAMPORE, BARRACKPORE.
DEVELOPMENT THE PREMISES OF THE OLD PLANT AE AND SAE ROOM AND ITS ADJACENT GO DOWN AREA AT IGWTP.
2026_KMC_988147_1
KMC/IGWTP/152/25-26
Open Tender
CIVIL WORKS
240 days
IGWTP/KMC
AS PER NIET
4 documents required · 4 mandatory
₹0
₹10,000
IGWTP/KMC
14 Mar 2026
14 Jan 2026
27 Jan 2026
14 Jan 2026
24 Jan 2026
17 Jan 2026
14 Jan 2026
BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. II. COMPOUND DEVELOPMENT: 19) Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary). (Payment to be made on area cleared)
SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER B. MISCELLANEOUS ITEMS 1.Scraping of moss, blisters etc.thoroughly from exterior surface of walls necessitating the use of scraper, wire brush etc.(Payment against this item will be made only when this has been done on the specific direction of the Engineer-in-charge)
BUILDING WORKS (D) Flooring B. REPAIR AND REHABILITATION 12. Washing and cleaning with soap water and rubbing with oil cloth in all types of floor and dado.
BUILDING WORKS. (T)MISCELLANEOUS WORKS: B. MAINTENANCE WORKS : 11)Removing scum form the bottom floor of service latrine washing the floor thoroughly and treating the same with liberal sprinkling of bleaching powder (including cost of bleaching power). (Payment to be made on affected area of floor)
BUILDING WORKS. (T)MISCELLANEOUS WORKS: B. MAINTENANCE WORKS : 12)Cleaning and removing conservancy garbage mixed with rubbish & other filthy materials from the road side flank, drain and compound including cutting, loading, unloading to and from truck or cart by Mathor labour & removing the same to any distance.
MATERIALS AND LABOUR ETC.(C)-(I) MISCELLANEOUS 28.Cleaning rubbish, sludge, weeds scum, liquid earth, mud etc.etc.from road side masonary drain/ hume pipe drain/ culvert etc. by mathor labour after removing concrete.Slab/manhole cover etc.without damaging the same and refixing the same properly after cleaning as necessary and removing thesludge etc.etc.by using iron pans,buckets including all labour, tools & plants including removing the spoils in dry condition and disposing thesame by truck beyond the road side in conformity with municipal/corporation rules for such disposal including loading into truck and cleaning the road side in all respects as per direction of the Engineerin- Charge. (Payment will be made on the basis of actual stack measurment of spoils in dry condition at roadside)
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC. 1. Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. (a) In ground floor including roof.
BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 8. Brick work with 1st class bricks in cement mortar (1:6) (b) In superstructure, ground floor
BUILDING WORKS ( C ) Brickworks,Concrete Works etc?33..Ordinary Cement concrete (mix 1:2:4) with graded stone chips (6mm nominal size) excluding shuttering and reinforcement,if any, in gound floor as per
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](iii) With 1:3 cement mortar (a) 20 mm thick plaster
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 15 Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
Sub Total
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
techbid.pdf
Tender Documents • 1.32 MB
BOQ_2413927.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid