Construction of Dining Hall to Zilla Praja Parishad High School in Peddapurappadu village of Karapa (M) Est Rs 15.00 Lakhs
914521
NIT No 99/CSR-ONGC Grant/2025 Dt 12.02.2026 of the Executive Engineer, PRI Division, Kakinada
OPEN - NCB
Buildings
KAKINADA
10 documents required · 9 mandatory · 1 optional
₹443
₹12,490
14 Apr 2026
14 Mar 2026
14 Mar 2026
Name of the Work: Construction of Dining Hall to Zilla Praja Parishad High School in Peddapurappadu (v) of Karapa (M) Est Rs 15.00 Lakhs Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including overhead charges & Contractors profit but excluding GST.
Filling with Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) including overhead charges & Contractors profit but excluding GST.Foundation & Basement filling
Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for Foundations (APSS No. 402) including overhead charges & Contractors profit but excluding GST and Seigniorage charges.
Plain Cement Concrete corresponding to M 5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG (SS5) metal from approved quarry with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)including overhead charges & Contractors profit but excluding GST and Seigniorage charges for finished item of work.
Supply and placing of the M20 Grade Nominal Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (fine sand (unscreened) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, steel centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work.including overhead charges & Contractors profit but excluding cost of steel and its fabrication charges,GST and Seigniorage charges for finished item of work. Footings
Supply and placing of the M20 Grade Nominal Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (fine sand (unscreened) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, steel centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work.including overhead charges & Contractors profit but excluding cost of steel and its fabrication charges,GST and Seigniorage charges for finished item of work. Pedastals
Supply and placing of the M20 Grade Nominal Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (fine sand (unscreened) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, steel centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work.including overhead charges & Contractors profit but excluding cost of steel and its fabrication charges,GST and Seigniorage charges for finished item of work. Plinth Beam
Supply and placing of the M20 Grade Nominal Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (fine sand (unscreened) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, steel centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work.including overhead charges & Contractors profit but excluding cost of steel and its fabrication charges,GST and Seigniorage charges for finished item of work. Columns
Supply and placing of the M20 Grade Nominal Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (fine sand (unscreened) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, steel centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work.including overhead charges & Contractors profit but excluding cost of steel and its fabrication charges,GST and Seigniorage charges for finished item of work. Lintels
Supply and placing of the M20 Grade Nominal Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (fine sand (unscreened) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, steel centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work.including overhead charges & Contractors profit but excluding cost of steel and its fabrication charges,GST and Seigniorage charges for finished item of work. Sunshades
Brick masonry 230 mm thick for panel walls in superstructure with CM (1:6) proportion using II nd class country bricks of size 23x11x7 cm from approved source having crushing strength not less than 35kg/sqcm including cost and conveyance of all materialslike cement, sand, bricks, water etc., to site, including seignorage charges, sales and other taxes on all materials and all operational, incidental and labour charges such as mixing cement mortar, curing scafolding charges, constructing masonary, lift charges, curing etc., complete for finished item of work including overhead charges & Contractors profit but excluding GST and Seigniorage charges for finished item of work for Basement
Brick masonry 230 mm thick for panel walls in superstructure with CM (1:8) proportion using II nd class bricks of size 23x11x7 cm from approved source having crushing strength not less than 35kg/sqcm including cost and conveyance of all materials like cement, fine sand(unscreened), bricks, water etc., to site , including seignorage charges, sales and other taxes on all materials and all operational, incidental and labour charges such as mixing cement mortar, curing scafolding charges, constructing masonary, lift charges, curing etc., complete for finished item of work complete. including overhead charges & Contractors profit but excluding GST and Seigniorage charges for superstructure.
Flooring with 100 mm thick CC (1:6:10) mix using 40mm HG metal, 100mm thick and 20mm cement concrete surface (Ellies pattern, first sort) including cost and conveyance of all materials and all labour charges etc., complete.including overheads & contractors profit but excluding GST & Seignorage complete
Plastering with CM (1:5) to 12mm thick including cost and conveyance of all materials and all labour charges,mixing mortar, scaffolding, lift charges, curring etc.,for finished item of work.
Providing Thermo Mechanically Treated (TMT) (Fe 500 / Fe 500 D grade as per IS 1786-1979) of different diameters for RCC works including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., and including overheads & contractors profit but excluding GST complete for finished item of work.( APSS No.126)
Supplying and fixing of R.C.C Precasted Jalis 50mm thick for ventilators including cost and conveyance of all materials and all labour charges etc., completed including overhead charges & contractors profit but excluding GST
Cost,Supply and Fabrication charges of 50mm dia MS Pipe for any Design to required sizes and shapes approved by the Departmental Drawings including cutting,bending,welding rods, cost and conveyance of all materials and Labour charges etc complete for Medium class (Class B) 50mm MS Pipe as per IS 1239 including overheads & contractors profit but excluding GST complete for finished item of work.
Cost,Supply and Fabrication charges of 25mm dia MS Pipe for any Design to required sizes and shapes approved by the Departmental Drawings including cutting,bending,welding rods, cost and conveyance of all materials and Labour charges etc complete for Medium class (Class B) 50mm MS Pipe as per IS 1239 including overheads & contractors profit but excluding GST complete for finished item of work.
Roofing with corrugated G.I sheets 0.50mm thick fixed with G.I ‘J’ bolts & nuts 8 mm dia with bitumen & G.I limpet washers filled with white lead & including a coat of approved steel primer and two coats of approved paint on over lapping of sheets complete (up to a pitch of 600) and seigniorage charges, etc., complete, excluding the cost of purlins, rafters, trusses & cost of conveyance of all materials including overheads & contractors profit but excluding GST complete for finished item of work.
White washing two coats with lime of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials including overhead charges & contractors profit but excluding GST
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ Dining hall.xlsx
TENDER_DOCUMENT • 0.27 MB
new SBD Dining Hall.doc
TENDER_DOCUMENT • 1.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .