Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC | ₹9.6 L Quoted ₹9.7 L | L1 | Accepted-AOC L1 Party |
| 2 | L2₹9.9 LRejected-Finance | ₹9.9 L | L2 | Rejected-Finance L2 Party |
| Sl No | Description | Qty | Unit | ANUKUMAR R L1 | K A AHAMAD L2 |
|---|---|---|---|---|---|
| 1.00Cutting the GSB with JCB and Tipper | |||||
| 1.01 | Hire and running charges of hydraulic excavator (JCB/Hitachi)and tipper including
fuel/ operator for cutting the GSB with JCB and carrying to the stack area. | 8 | hour | 2,000.7 ₹16,005.60 | 1,147.41 ₹9,179.28 |
| 2.00Excavation for column pedestal | |||||
| 2.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5
m, as directed by Engineer-in-charge.All kinds of soil | 50.84 | cum | 300.7 ₹15,287.89 | 311.61 ₹15,842.69 |
| 3.00PCC for column pedestal | |||||
| 3.01 | Providing and laying in position cement concrete of specified grade excluding the cost
of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse
sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm
nominal size derived from natural sources) | 4.36 | Cum | 9,300.07 ₹40,520.40 | 9,581.48 ₹41,746.50 |
| 4.00Shuttering work | |||||
| 4.01 | Centering and shuttering including strutting, etc. and removal of form for:Foundations,
footings, bases of columns, etc for mass concrete | 87.62 | Sqm | 400.07 ₹35,054.13 | 466.21 ₹40,849.39 |
| 5.00RCC work | |||||
| 5.01 | Providing and laying in position specified grade of reinforced cement concrete,
excluding the cost of centering, shuttering, finishing and reinforcement - All work up
to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm
nominal size derived from natural sources) | 36.15 | Cum | 12,300.07 ₹4.4 L | 12,669.82 ₹4.6 L |
Tender Value
₹8.2 L
EMD Value
₹20,450
Closing Date
15 Oct 2025, 3:00 pmClosed
HOU(TP)
KMML,CHAVARA
Cutting the existing GSB with JCB and Tipper,Excavation and pcc for column pedestal . shuttering work . RCC work ,TMT steel work for RCC works.Compacting the ground using a vibratory compactor.
2025_KMML_800897_1
EAF/CIV/0340/2025-2026,Dtd 12-09-2025
Open Tender
Civil Works - Others
60 days
KMML, CHAVARA
Refer tender documents
6 documents required · 6 mandatory
₹1,930
₹20,450
20 Feb 2026
30 Sept 2025
16 Oct 2025
30 Sept 2025
15 Oct 2025
30 Sept 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid