Loading…
Loading…
Tender Value
₹14.4 L
EMD Value
₹14,400
Closing Date
23 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Chief Officer halol nagar palika halol
CONSTRUCTION OF RCC CHAMBER STORM WATER CATTLE DRAIN AND STORM WATER DRAIN 15 VIVEKADHIN YOJANA YEAR 2025 -2026 DIST.: PANCHMAHAL
296072
Tender Notice 2026-2027
Open
Miscellaneous Works
Panchmahal
2 documents required · 0 mandatory · 2 optional
₹1,062
Chief Officer Halol Nagar palika
₹14,400
13 Apr 2026
13 Apr 2026
13 Apr 2026
23 Apr 2026
13 Apr 2026
Name of Work :- CONSTRUCTION OF RCC CHAMBER AT VADODARA ROAD SHERON PARK HALOL DIST.: PANCHMAHAL
Memorendom showing items of works to be RCC Chamber
Sr No Item Total Qty. Rate Per Amount
Demolition including stacking of serviceable materilas and
disposal of unserviceable materials with all lead and lift. (i) R.C.C.
Excavation for base footings upto depth 1.5 m. including sorting
out and stacking of useful material and disposing off the
2 excavated stuff upto 50 m lead (A) loose or soft soil 6.00 117.08 Cmt.
Excavation for foundation for depth from 1.5 m to 3.0 m including
sorting out and stacking of useful materials and disposing off the
excavated stuff upto 50 Meter lead.(C) Hard Murrum
Filling available excavated earth (excluding Rock) in trenches.
Plinth, sides of foundations etc. in layers not exceeding 20cm. In
depth consolidating each disposited layer by ramming and
4 watering. 3.50 130.39 Cmt.
Providing and laying cement concrete 1:3:6 (1 Cement : 3 Course
sand : 6 Broken stone aggregates 40 mm nominal size) and
curing complete excluding cost of form work in (A) Foundation
5 and Plinth. 1.00 2980.90 Cmt.
Providing and laying controlled cement concrete M-250 and
curing complete including the cost of formwork but excluding the
cost of reinforcement of reinforced concrete work in. Base Slab
6 Footing 1.50 4345.02 Cmt.
Providing and laying controlled cement concrete M-250 and
curing complete including the cost of formwork but excluding the
7 cost of reinforcement of reinforced concrete work in. Wall 4.00 6475.11 Cmt.
Providing and Laying controlled cement concrete M-250 and
curing compound, including the cost of formwork but excluding the
8 cost of reinforcement for reinforced concrete work in Slab 1.00 5619.64 Cmt.
Providing and supplying ISI - TMT Fe-500 bar steel reinforcment
for R.C.C work including bending, binding and placing in position
9 etc. complete 1005.00 76.21 Kg.
Providing and supplying including fixing of FRC catpit frame and
cover as per required with suitable opening, The FRC catchpit
features a robust frame with a size of 36” x 36” (900 x 900 mm), a
thickness of 7” (175 mm), and a weight of 159 kg. The cover
measures 30” x 30” (750 x 750 mm) with a thickness of 4” (100
mm) and a weight of 117 kg. It provides a clear opening of 24” x
24” (600 x 600 mm) to facilitate access. The durable construction
ensures reliability for heavy-duty applications, meeting stringent
performance standards including cost of transportation, loading,
unloading, fixing as per instruction given by engineer in charge for
suitable size of chamber size.
Contractor Chief Officer
Sign & Seal HALOL Nagarpalika
HALOL NAGARPALIKA HALOL
SCHEDULE - "B2"
Name of Work :- CONSTRUCTION OF STORM WATER CATTLE DRAIN AT DHAVAL PARK HALOL DIST.: PANCHMAHAL
Memorendom showing items of works to be STORM WATER
Sr No Item Total Qty. Rate Per Amount
Demolition including stacking of serviceable materilas and
disposal of unserviceable materials with all lead and lift. (i) R.C.C.
Excavation for base footings upto depth 1.5 m. including sorting
out and stacking of useful material and disposing off the
2 excavated stuff upto 50 m lead (A) loose or soft soil 16.00 117.08 Cmt.
Filling available excavated earth (excluding Rock) in trenches.
Plinth, sides of foundations etc. in layers not exceeding 20cm. In
depth consolidating each disposited layer by ramming and
3 watering. 40.00 130.39 Cmt.
Providing and laying cement concrete 1:3:6 (1 Cement : 3 Course
sand : 6 Broken stone aggregates 40 mm nominal size) and
curing complete excluding cost of form work in (A) Foundation
4 and Plinth. 2.00 2980.90 Cmt.
Providing and laying controlled cement concrete M-250 and
curing complete including the cost of formwork but excluding the
cost of reinforcement of reinforced concrete work in. Base Slab
5 Footing 2.50 4345.02 Cmt.
Providing and laying controlled cement concrete M-250 and
curing complete including the cost of formwork but excluding the
6 cost of reinforcement of reinforced concrete work in. Wall 4.50 6475.11 Cmt.
Providing and fixing to wall, ceiling and floor galvanised Mild steel
tubes (Medium grade) of the following nominal bore, tube fitting
and clamps including making good the all ceiling and floor.(F)
Providing and supplying ISI - TMT Fe-500 bar steel reinforcment
for R.C.C work including bending, binding and placing in position
8 etc. complete 1213.12 76.21 Kg.
Provinding Laying And Fixing Automatic Pump System For Strom
9 Water Drain Dumping In 1.00 101000.00 Nos
Contractor Chief Officer
Sign & Seal HALOL Nagarpalika
HALOL NAGARPALIKA HALOL
SCHEDULE - "B3"
Name of Work :- CONSTRUCTION OF STORM WATER DRAIN AT KANJARI CHAR RASTA HALOL DIST.: PANCHMAHAL
Memorendom showing items of works to be Storm Water
Sr No Item Total Qty. Rate Per Amount
Demolition including stacking of serviceable materilas and
disposal of unserviceable materials with all lead and lift. (i) R.C.C.
Excavation for base footings upto depth 1.5 m. including sorting
out and stacking of useful material and disposing off the
2 excavated stuff upto 50 m lead (A) loose or soft soil 76.50 117.08 Cmt.
Filling available excavated earth (excluding Rock) in trenches.
Plinth, sides of foundations etc. in layers not exceeding 20cm. In
depth consolidating each disposited layer by ramming and
3 watering. 37.00 130.39 Cmt.
Providing and laying cement concrete 1:3:6 (1 Cement : 3 Course
sand : 6 Broken stone aggregates 40 mm nominal size) and
curing complete excluding cost of form work in (A) Foundation
4 and Plinth. 7.00 2980.90 Cmt.
Providing and laying controlled cement concrete M-250 and
curing complete including the cost of formwork but excluding the
cost of reinforcement of reinforced concrete work in. Base Slab
5 Footing 10.50 4345.02 Cmt.
Providing and laying controlled cement concrete M-250 and
curing complete including the cost of formwork but excluding the
6 cost of reinforcement of reinforced concrete work in. Wall 15.50 6475.11 Cmt.
Providing and Laying controlled cement concrete M-250 and
curing compound, including the cost of formwork but excluding the
7 cost of reinforcement for reinforced concrete work in Slab 13.50 5619.64 Cmt.
Providing and supplying ISI - TMT Fe-500 bar steel reinforcment
for R.C.C work including bending, binding and placing in position
8 etc. complete 7100.00 76.21 Kg.
Contractor Chief Officer
Sign & Seal HALOL Nagarpalika
Name of Project :- CONSTRUCTION OF RCC CHAMBER
STORM WATER CATTLE DRAIN AND
STORM WATER DRAIN 15 % VIVEKADHIN
YOJANA YEAR 2025 -2026 DIST.:
SCHEDULE - A B S T R A C T
Description Estimated Cost Tender Cost
CONSTRUCTION OF RCC CHAMBER AT
"B1" VADODARA ROAD SHERON PARK HALOL DIST.:
CONSTRUCTION OF STORM WATER CATTLE
"B2" DRAIN AT DHAVAL PARK HALOL DIST.:
CONSTRUCTION OF STORM WATER DRAIN AT
"B3" KANJARI CHAR RASTA HALOL DIST.:
I/We am/are willing to carry out the work at ______________% above / below percent (should be written in figures and words)
of the estimated rates mentioned above. Amount of my/our tender works out as under.
Estimated amount Estimated amount
Put to tender Rs. 14,39,386.00 Put to tender Rs.14,39,386.00
Signature of Contractor. HALOL Nagarpalika
HALOL NAGARPALIKA
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
00 Halol Title.pdf
01 Halol Pg 02 to 06.pdf
02 Halol Pg 07 to 49.pdf
03 Halol Pg 50 to 54.pdf
04 Halol Pg 55 to 58.pdf
05 Halol Pg 59 to 75.pdf
05_Building Specification.pdf
05_Material spesification.pdf
Abstract.pdf
Schedule B.pdf
Download all tender documents and submit your bid