Loading…
Loading…
Tender Value
₹6.9 Cr
EMD Value
₹13.9 L
Closing Date
5 Oct 2026, 3:00 pm6d left
S.E.Drainage Circle. Aligarh
Office Of S.E.Drainage Circle. Ali
Construction of Sub-Divisonal Office, Type 4, Type 3 Quarters and Repairing of I.H of Second Sub Division Jalesar under Irrigatio division Firozabad
2026_UPIDC_1190043_1
16/SE/DCA/2026-27
Open Tender
Civil Works
Item Wise
365 days
FIROZABAD
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,944
₹13.9 L
Office Of S.E.Drainage Circle. Aligarh
28 Sept 2026
28 Sept 2026
5 Oct 2026
28 Sept 2026
5 Oct 2026
28 Sept 2026
30 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | 72.6 | cum | - | - |
| 2 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 523 | sqm | - | - |
| 3 | Dismantling doors, windows and clerestory windows (wood) shutter including chowkhats, architrave, holdfasts etc. complete andstacking within 50 metres lead : | 13.1 | sqm | - | - |
| 4 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer -in - charge | 14.75 | cum | - | - |
| 5 | Earth work in foundation in all type of soil including lift up to 1.5 meter and lead up to 30 meter and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by the Engineer-in-charge up to a distance of 30M from the foundation trenches:(Building) including all cost of T&P etc complete. | 2,077 | Cum | - | - |
| 6 | Earth work in cutting or in embankment in all type soil , excavation to be in the form of regular pits and earth work in embankment to be in 20cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50m lift and above 30m all lead and including all cost of T&P etc complete. | 3,067 | cum. | - | - |
| 7 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete . | 115 | cum. | - | - |
| 8 | Providing and laying in position cement concrete of 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) excluding the cost of centering and shuttering - All work up to plinth level including all cost of T&P etc complete. | 275.5 | cum. | - | - |
| 9 | Providing and laying in position cement concrete of 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)excluding the cost of centering and shuttering - All work up to plinth level including all cost of T&P etc complete. | 272 | cum. | - | - |
| 10 | Providing and laying in position ready mixed or site batched design mix Cement Concrete of M25 grade with minimum cement Content of 330 kg /cum for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: All works upto plinth level | 351.5 | cum. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
Tendernotice_2.pdf
PDF • 3.03 MB
BOQ_2242681.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .