Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-AOC AITHARA KALEELAZHIKATHU VEEDU ODANAVATTOM PO | IDUKKI | KERALA | 685533 | L1 | Accepted-AOC Work awarded to the technically and financially qualified lowest bidder | |
| 2 | L2₹2.6 L+₹35,205.11 (15.7%)Rejected-AOC SREENILAYAM MANNADI P O | IDUKKI | KERALA | 685501 | L2 | Rejected-AOC High quoted bidder |
| Sl No | Description | Qty | Unit | ASOKAN. V L1 | R.Rajendran Pillai L2 |
|---|---|---|---|---|---|
| 1.00Annual maintenance | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 1,875 | sqm | 14.5 ₹27,187.5 Lowest | 17.64 ₹33,075 |
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 6,600 | sqm | 8 ₹52,800 Lowest | 9.1 ₹60,060 |
| 1.00 | OD19381/2025-2026:Desilting of canals- by mechanical means (Hydraulic excavator)/manual means over areas including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth/silt to be levelled and neatly dressed. All kinds of soil | 60 | cum | 190 ₹11,400 Lowest | 209.86 ₹12,591.6 |
| 1.00 | OD19382/2025-2026:Engaging coolies for the removal of floating materials from the canal wherever
during the water and removal of silt and slipped earth at salient points for smooth flow in the canal including
all the cost , labour and hire required for working,all the cost for purchasing Bleaching powder and other antibacterial chemicals from market, Lotion and
glouse to workers, labour for drying and burning the bio degradable waste in eco-friendly environment,
charges for removing plastic wastes separated from site etc. complete as per the directions of departmental
officers at site. | 125 | each | 900 ₹1,12,500 Lowest | 1,049.71 ₹1,31,213.75 |
| 1.00 | 50.6.1.7:Solid block masonry using pre cast solid blocks ( Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15 cm in : CM 1:6 ( 1 cement : 6 coarse sand ) etc complete | 1.95 | cum | 5,500 ₹10,725 Lowest | 6,015.9 ₹11,731.01 |
| 1.01 | OD19383/2025-2026:9 mm cement plastering of mix : 1:4 (1 cement : 4 fine sand ) including all cost of materials, labour charges etc complete | 32.75 | sqm | 300 ₹9,825 Lowest | 335 ₹10,971.25 |
Tender Value
₹2.7 L
EMD Value
₹6,692
Closing Date
15 Oct 2025, 4:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
O/o The ASSISTANT EXECUTIVE ENGINEER, KIP LB SUB DIVISION NO 17 KOTTARAKKARA.
Annual maintenance works of Kudavattoor distributary and Left Bank Main canal (Ch 26129 m to 29000 m) for the water distribution year 2025-26-General Civil Work
2025_Irrig_807085_1
IRR/PII/TR/2807/2025_5_2_2/1 The
Open Tender
Civil Works - Canal
Item Rate
330 days
Kudavattoor
Please refer tender documents
7 documents required · 7 mandatory
₹590
Yes
₹6,692
Yes
30 Oct 2025
8 Oct 2025
17 Oct 2025
8 Oct 2025
15 Oct 2025
8 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .