Loading…
Loading…
Tender ID
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
27 Feb 2026, 6:00 pmClosed
Executive Engineer, GSPHCL, Gandhinagar
ARC for Soil Investigation for various work at various places in Gandhinagar, kheda, and Anand district of Gujarat State.
274143
NIT No. 33 of 2025-26 (Sr.No.1) (1st Attempt)
Open
Civil Works - Others
Works
Gandhinagar
10 documents required · 10 mandatory
₹1,500
Yes
GUJARAT STATE POLICE HOUSING CORPORATION LTD, Payable at Gandhinagar
₹25,000
Yes
7 Feb 2026
7 Feb 2026
7 Feb 2026
27 Feb 2026
7 Feb 2026
Schedule A for completion of designated parts or percentages
of work and rates of Liquidated damages to be paid for delay
Schedule B showing items and rates of works to be executed
No defect and satisfactory maintenance certificate
Section- 5 Contract Agreement 62-63
Section- 6 Annexures
Annexure- Works completed by the tenderer
Annexure- 2 Declaration Regarding Works on hand with tenderer
Annexure- Plants and Equipment's available for use on this work
Annexure- Plants to be procured
Annexure- Details of key Technical Supervisory and Administrative Personnel
Annexure- 6 Indenture for Secured Advances
Annexure- 7 Information of Partners
Section -7 Specifications
Section- 8 Drawings
Gujarat State Police Housing Corporation Limited
PERCENTAGE RATE TENDER AND CONTRACT FOR CONSTRUCTION AND I OR ELECTRICAL WORK
Last date & time of online submission of tender _
Last date of physical submission (by registered post AD I Speed Post or by Hand Delivery) of tender
fee, EMD & Notarised undertaking in physical form.
Date Time 17:00 hrs.
Date & time of online Opening of Tender Date Time _
MEMORANDUM OF WORKS IN BRIEF
(1) Name of the Work
(3) Earnest Money:
(4) Validity period of tender offered :(A)-90 days for Estimated cost up to 10.00 lacs from the last date of
online submission of tender.(B)-120 days for Estimated cost above 10.00 lacs from the last date of
online submission of tender
(5) A Security Deposit: In case of works having estimated cost above Rs.10.00 lacs
(i) FDRs/Bank Guarantee of any of the Rs.5%of Contract value
specified banks only (see clauseNo.2
Of section-3fordetails)
(ii) To be deducted from current bills Rs. 5% of Contract Value
Total Rs.10%of Contract value
(5) B Security Deposit : In case of works having estimated cost up to Rs.10.00 lacs
(i) FDRs/Bank Guarantee of any of the Rs.2.5% of Contract value
Specified banks only (See Clause No.2
of section-3 for details
(ii) To be deducted from current bills Rs.2.5% of Contract value
Total Rs.5 %m Contract value
(5) C Security Deposit
(i) In Case of tenders for Annual Rate Contract {A.R.C), total10% security deposit of the contract value
(ii) Out of which, first 5% of the contract value will be payable in the form of FOR/Bank Guarantee of
any of the specified banks only (See Clause No.2 of Section 3 for details)
(iii) Balance 5% deposit of the contract price will be deducted @ 20% from each of the first 5 bills.
(6) Time allowed for completion of the work
from the date of written order to commence ................................................. Months
(7) Other details
(i) Mode of quoting rates in Schedule of In figures as well as in words.
items to be carried out.
MEMORANDUM OF WORKS IN BRIEF
1. Name of Work
3. Earnest Money
4. Validity period of tender offered :{A)-90 days for Estimated cost up to 10.00 lacs from
the last date of online submission of tender.(B)-120 days for Estimated cost above
lacs from the last date of online submission of tender
5. Security Deposit Total at Five/Ten percent of the Contract value
Total security deposit shall be 5% (Five percent)/10% (Ten percent) of contract price of
which half (50%) shall be payable in the form of FOR/Bank Guarantee of any of the specified
Banks only (see clause No.2 of sec.3 for details) in favour of Gujarat State Police Housing
Corporation Ltd. and balance amount of Security Deposit (50%) shall be recovered from
current running bills @ 10% {Ten percent) of the value of each bill and in case of ARC
works, 20% (Twenty percent) from each of the first five bills. No interest shall be payable
by the Corporation on Security Deposit lying with the Corporation I deducted by the
Corporation from RA bill. FOR/Bank Guarantee of a specified Bank must be more than
(six) months standing of expiry of stipulated date of completion of the work.
6.Time for completion of work from the
date of written order to commence ..................................................................... months.
7.Name of Office to which
Tender fee, EMD & notarized
undertaking to be sent Office of the Tender Inviting Authority
in physical form by registered
post AD or Speed Post or by
Hand Delivery :
Gujarat State Police Housing Corporation Limited
Contract for works
INFORMATION & INSTRUCTIONS FOR TENDERERS:
1.1 Competency of Tenderer:
1.2 No contract will be awarded except to responsible bidders capable of performing
the class of work completed. Before the award of the contract, any bidder may be required to
show that he has the necessary facilities, experience, ability and financial resources to
perform the work in satisfactory manner within the time stipulated. Tenderer may be required
to furnish the Corporation with the statements as to their experience, registration certificate
under Gujarat Sales Tax Act. and their financial status. Tenderer shall be a registered contractor
in appropriate class of the Roads & Buildings Department, Government of Gujarat and shall
also have registration certificate under Gujarat Sales Tax Act.
1.3 The tender fee (in the form of demand draft I banker's cheque favouring the
Corporation, payable at place of tender inviting authority or cash receipt) & Earnest Money
Deposit in physical form shall be received only under "Registered Post A.D. or Speed Post"
or by Hand Delivery.
2.0 Tenderer to inform Himself :
Tenderer will be deemed to have inspected the site and to have satisfied himself as to
the nature of all works, all existing roads, water-way and other means of communications and
access to and from the site of the work and the building that may be required for temporary
purpose in connection with the construction, completion and maintenance of the works and
must make his own inquiries as to work, yard sites and depot, and dumps as to acquisition
of such additional sites rates and areas as may be necessary for temporary purpose for
constructing, completing and maintaining the works and availability of water for construction
activities, power, quarries and labour.
3.1 Late I Delayed physical receipt of tender fee, EMD & notarized
3.2 After online submission of tender, tender fee, EMD & notarized undertaking should
reach the Corporation within time and last date stipulated for the purpose in any of the modes
of physical submission. In case, the same is not received within the time and stipulated last
date of receipt, their tender will not be opened online and will be considered as NON
4.0 Adequacy of Rates:- The tenderer must understand clearly that the rates quoted
are for completed works and include all costs due to materials labour, scaffolding plant,
supervision, service work, power, royalties and octroietc., and to include all extras to cover
the cost of night work if and when required and no claim for additional payment beyond the
price/rates quoted will be entertained and the tenderers will not be entitled subsequently to
make any claim on the ground of misrepresentation or on the ground that he was supplied with
misleading information by any person (whether the member is the employee of the
Corporation or not).Any failure on his part to obtain all necessary information for the purpose
of making his tender and filling the several prices and rates therein shall not relieve him from
any risks or liabilities arising out of or consequent upon the submission of the tender.
5.0 Tender Forms : Every 'blank' in the form of the e-tender and in the schedule and
Annexures must be filled up by the tenderer and must be submitted online.
6.0 Quoting of Rates :-
The tenderer shall work out the total amount of his offer after adding or deducting the
The tenderer shall work out the total amount of his offer after adding or deducting the
percentage from the total cost as shown at the end of Memorandum showing items and rates
of work to be carried out.
Contractor's percentage whether applied to net or gross amount of the bill :
Percentage referred to above tender shall be deducted from I added to the gross amount of
the bill before deducting the value of any stock issued, while preparing the running and Final
7.1 Earnest Money:-
7.2 Earnest money at 1%I2% of the estimated cost of the work shall be submitted in the
physical form along with other supporting document of the tender within the time and
date stipulated & in the mode prescribed for the purpose. This Earnest money shall be
in favour of the Gujarat State Police Housing Corporation Ltd. and shall be in the form
(A) Cash receiptofG.S.P.H.C. Ltd.
(B) Fixed Deposit Receipt of Banks (See clause no.2 of section-3 for details) drawn in
favour of the Gujarat State Police HousingCorporation Ltd.
(C) Copy of the valid Earnest Money Deposit exemption certificate duly issued by the
Corporation under EMD exemption scheme of the Corporation.
7.2 The Earnest money submitted in the form (B) above shall need minimum validity of
one hundred and eighty (180) days from the last date of online submission of tender. If
the tenderer modifies or withdraws his tender, the Earnest Money (in case of EMD
exemption certificate, proportionate amount equivalent to EMD of a particular tender)
shall be forfeited and the tenderer may be disqualified from tendering for future work
under the Corporation.
7.3 The Earnest Money will be returned to the unsuccessful tenderers. The Earnest Money
will be returned to the successful tenderer after he furnishes security deposit and duly
enters into the contract.
7.4 Within fifteen days or within such time as may be decided by the Corporation from the
date of receipt of the letter accepting his tender, the successful tenderer shall furnish
the required security deposit and attend the office of the Corporation for execution of
the contract documents. If he fails to furnish the security deposit or execute the contract
document, his Earnest Money (in case of EMD exemption scheme, equivalent amount
therefrom) shall be forfeited and the tenderer may be disqualified from tendering for
further works under the Corporation.
7.5 Tenders not accompanied by Earnest Money shall be rejected outright as NON
RESPONSIVE. The act of the tenderer to submit documents in physical form without
Earnest Money shall be construed as "Misconduct" and would disqualify him for future
tendering for the Corporation works.
8.0 Accompaniments of Tender : (To be submitted in electronic format through
online (by scanning) up to last date of online submission of tender.)
Bidders are require to take note for submission of documents as below.
"A" -Mandatory pocuments (Jo be submjtted online)
For Preliminary stage - Mandatory documents to be submitted in electronic form .
i.e. by scanning along with submission of tender online.
(i) Copy of last I.T return filed, partnership deed or memorandum as well as Articles of
Association, in case of the company or copy of registration under co-operative society
All copies submitted shall be duly attested.
(ii) A certificate of Registration as approved contractor of prescribed category along with
validity period from authorities stipulated in notice inviting tenders.
(iii) Copy of Provident fund Registration along with code number.
{iv) A solvency certificate of an amount equal to 25 Percent of the amount of work put to
tender (having minimum validity on the date of online submission of tender) will have
to be produced. Such solvency certificate should be issued by the banks as per
clause2 (a) of section
(v) Tender fees - Pay order I Demand Draft Cash Receipt of the Corporation.(Non
(vi) Earnest Money Deposit inthe form of cash receipt of G.S.P.H.C. LTD. or Fixed Deposit
Receipt of Banks (See clause no.2 of section-3 for details) OR EMD exemption
certificate issued byG.S.P.H.C. LTD. Only.
(vii) Mandatory documents as per prequalification criteria/special tender conditions if
applicable copies of certificate regarding previous experience as required .
• Experience certificate in Form 3A issued by Government to substantiate successful
experience of similar work (i.e. Single similar Work). When Employer of similar work
is not a Government, following need also to be fumished (minimum for one such
a. Self Attested copy of work order/ Agreement
b. Self Attested copy of completion certificate
c. Self Attested copy of TDS certificates.
(viii) Goods & Service Tax Registration Copy (GST)
(ix) Income tax pan card copy.
Part B- C1lOther Documents :In addition to submission of documents in electronic form {by
scanning ),submit following mandatory documents inphvsical form within stipulated date mention
in NIT atofficeofthetenderinviting authority.
(i) Tender Fee (Non Refundable)
(ii) Earnest Money Deposit
(iii) Notarized undertaking on Rs.100 Stamp Paper as per attached Format.
part B- <2> Other pocuments:
(i) Duly filled in and signed declaration form as provided after as last item of section 1 &
memorandum duly filled in & signed as given in section-
{ii) Copies of certificate regarding previous experience as required.
(iii) Declaration showing all works completed during preceding 5 year and works on hand
with the contractor and the value of works that remained to be executed in each case
(Annexure 1& 2)
Note : Non submission of any of the above mandatory documents in prescribed form and
mode in partA& part B {1) will make the bidders non responsive at preliminary stage
only and nofurther tender evaluation process will be initiated in such bids.
For Tender Amount More than Rs. 7 Crore and For Special Work
Tender (Two Cover Bid.) Also For Separate Electrical Works Tender
more than Rs. 50.00 Lacs.
In addition to Part A and Part B Documents Following mandatory documents to be
submitted online for pre-qualification criteria. (Technical Bid}
PART - C Fortechnical Stage - Mandatory Documents dulyself attested to be submitted
inelectronic from .i.e. by scanning along with submission of tender online.
1.) Annual Turnover Certificate issued by Chartered Accountant for last five financial year i.e.
2.} Experience certificate in Form 3A issued by Government to substantiate successful experience
ofsimilarwork(i.e. Single similarWork}. When Employerofsimilarworkis nota Government
following need also to be furnished (minimum for one such work} (Schedule H)
a. Self Attested copy of work order/Agreement
b. Self Attested copy of completion certificate
c. Self Attested copy ofTDS certificates.
Note :Details of similar works completed needs to be shown clearly in Schedule - H Form
online and only such work will be considered for evaluation. Form3A scanned copy of
the same to be uploaded, (as shown in Schedule H) others separately attached
documents for single similar works will not be considered.
3.} Bid Capacity(please refer as per PQ criteria no15 (ii) C)
3a.Works on hand with the contractor and the value ofworks that remained to be executed
in each case as per tender documents (Schedule- E)
3b. Structure and Organization details (Schedule-A}
3c. Financial Statement (Schedule-B)
3d. Personal Details (Schedule-C)
3e. Plant and Machinery Details (Schedule-D)
3f. Details of Litigation (Schedule-F)
3g.Additional Information (Schedule-G)
3h. Consent letter of Bidderfor plant, Machinery and personnel (Schedule-!)
Note :Relevant documents of all schedules to be submitted at concern schedule stage.
Documents stated in Part- B (1)- Other documents are required to be submitted within
7 days of the last date of online submission of tender in physical form. Non submission
of any ofthe mandatory documents stated in PartA above, along with online submission
of tender and Part B (1) within stipulated time period will make the tender "NON
RESPONSIVE" and E.M.D. will be refunded to the tenderer. No additional/ missing
documents can be submitted from later on Part A and Part C above which is
mandatory requirement of documents .
Inaddition to above, Corporation may call for any clarification regarding the submitted
documents and the same shall have to be complied within four working days after
intimation/instruction given bythe Corporation. Incase the tenderer fails to clarify within
stipulated time limit as stated above, the Corporation shall consider the tender as "NON
RESPONSIVE" and EMD will be refunded. No extension of time will be given
in any case, as stated hereinabove. It may be noted that contractor shall be
allowed to submit only the clarification/documents for which clarification is called for. In
case of repeated such cases by the single agency is noticed, the Corporation reserves
the right to "BLACKLIST" the agency for further period as deemed appropriate and the
decision ofthe Managing Director inthis regard shall befinal and binding to the agency.
(A) In case if bidder is limited company than they shall submit Memorandum &Articles of
Association prior to execute the agreement.
(B) For Electrical Item :-Inthe composited tender, electrical work having total estimated
amount more than Rs.50.00 Lacs, the agency will the lowest bid will have to submit the copy of
MOU of the electrical agency bywhom the work isto be done, having R& B(Electrical) Registration
of appropriate class, Electrical Contracto s License & experience certificate as per the Performa
(Annexure-X and Annexure-Y) enclosed in the tender. Prior to execute the agreement. Failing
which it will be considered as misconduct and the EMD will be forfeited and agency will be black
listed for the future tendering.
The tender is subject to be disqualified, if the tenderer is found to have misled or furnished false
information on the forms I statements I certificates submitted in proof of qualification requirements
or record of performance such as abandoning execution of the works, litigation history and or
financial failures and or suppression of material facts and information.
The Corporation shall not hold any risk and responsibility for any problem(s) encountered bythe
Tenderers while submitting his bids online.
The bidder is requested to download the tender documents and read all the terms and condition
mentioned in the NIT and Tender documents before submitting online tender and physical
documents as mentioned above (PartA, B & C) and seek clarification, if any from the authorized
officers as mentioned inthe NIT well within the last date and time of submission of online tender
or physical documents as the case may be.
The bidder has to keep track of changes by viewing the addendum/ Corrigendum issued by the
Tender InvitingAuthority from time to time basis in theE-Procurement platform. The department
calling for tenders shall not be responsible for any claims/ problems arising out of this.
All other relevant conditions are incorporated on the tender document.
The user should complete all the processes and steps required for bid submission. The successful
bid submission can be ascertained once acknowledgement is given by the system through bid
submission number after completing the process and steps. Users may also note that the
incomplete bids will not be saved by the system and are not available for the Tender inviting
Authority for processing.
The bidder shall authenticate the bid with his digital certificate for submitting the bid electronically
on a-Procurement platform and the bids not authenticated by digital certificate of the bidder will
not be accepted on the a-Procurement platform.
9.0 Tender liable to be invalid :
It may please be noted that the tender is liable to be considered invalid
especially, if the requirements [(i) to (ix)] listed in above clause no.8 are not complied
10.0 Right of rejection of tenders.
(i) Right is reserved by the Tender InvitingAuthority to reject any or all tender(s) without
assigning any reason thereof.
(ii) In addition to the above, the tender will also be liable to be rejected outright if:
(a) The tenderer proposes any alteration in the work specified or in the time allowed
for carrying out the work or in any condition.
(b) The tenderer i.e. in case of a proprietorship firm, the proprietor, in case of
partnership firm, the partner or in case of aimited company, the Drector or a person duly
authorized by the board of Directors does not sign Section 2 or his signature is/are not
attested by a witness.
(c) Any person who submits a tender shall fill forms online including the percentage
and rates of items put to tender. No single tender shall include more than one work but
contractors who wish to tender for two or more works shall submit a separate tender for each
11.1 Method of Tendering :
11.2 If the tender is made by an individual, it shall be signed by the individual above
his full name and current address.
11.3 If the tender is made by a proprietary firm, it shall be signed by the proprietor
above his full name and the full name of his firm with its current address.
11.4 If the tender is made by a firm of partnership, it shall be signed by a partner of the
firm holding the power of attorney and digital certificate for the firm. A certified copy of the
power of attorney shall be provided in physical form along with other documents. A certified
copy of the partnership deed, full name and current address of the firm and full names and
the current addresses of all the partners of the firm shall also be provided along with other
11.5 If the tender is made by a limited company or a limited corporation, it shall be
signed by a duly authorized person holding digital certificate for the company /corporation
and power attorney for signing the tender in which case a certified copy of the power of
attorney shall be provided separately in physical form along with other documents. Such
limited Company or Corporation may be required to furnish satisfactory evidence of its
existence before the contract is awarded.
11.6 All witnesses shall be persons of status and probity and their full names,
occupations and addresses shall be stated below their signatures.
11.7 All signatures in the tender document shall be dated.
12.1 Eligibility and qualification requirement.
To establish acceptability of the offer to the satisfaction of Tender InvitingAuthority the
tenderer shall provide either in a physical fonn the following:
12.2 Details of plant and machinery immediate! y available with tenderer for use on the
works in the proforma prescribed inAnnexure-3.
12.3 Details of plant and machinery proposed to be procured for the works in the
profonna prescribed inAnnexure-4.
12.4 Details of technical, supervisory and administrative personnel already employed
by the tenderer that he proposes to utilize for this work and such other personnel he proposes
to employ further for this work in the profonna inAnnexure-5.
12.5 Separate notes in sufficient details on each of the following :
(i) Method and technique of construction
(ii) Sequence of various important components of the work;
(iii) Cash-flow arrangement
13.0 Deviation or modifications in Tender Documents:
13.1 All tenderers are cautioned that tender containing any condition and/or deviation
from the contractual terms and conditions, specifications, quoting I offering rates/prices in
different manner than specified in the tender and/or any other requirements of tender shall
make the tender liable for outright rejection and shall be considered as non-responsive for all
practical purposes. The decision of the corporation in this regard shall be final and binding to
13.2 Alternative tenders are not acceptable.
14.1 Submission of tender
14.2 Tender shall be submitted in an online manner only on website http://
gsphc.nprocure.com
Last date & time of online submission
14.3 Tender fee, EMD & Notarized undertaking in physical form should be submitted
on or before {date) 17:00 hrs. (time) to the Office of the Tender InvitingAuthority.
15.1 Evaluation of tenders
15.2 Technical evaluation will be made of the tenderer's proposed method and
technique of construction, construction program, sequence of components of the work,
proposed resources assigned to do the work to determine the acceptability, adequacy and
reasonability of rates, his past performance and present resourcefulness.
15.3 To assist in the examination, evaluation and comparison of tender, the tender
inviting authority may ask tenderer individually for clarification of their tenders including
breakdown of unit rates. The request for clarification and response shall be in writing but no
change in substance of the tender shall be sought, offered or permitted at that stage.
15.4 Award is to be made to the tenderer whose responsive tender is determined to
be the lowest evaluated tender and who meets the appropriate standards of capacity and
financial resources.
16. Receipt of Payments :
Receipt of payment made on account of any work, when executed by a firm shall be
signed by all the partners except where the contractors are described in their tender as firm
in which case the receipt shall be signed in the name of the firm by one of the partners or by
some other person having authority to give effectual receipts for the firm.
17.1 Opening of tenders :
17.2 The Authorised Officer I competent authority shall open tender online on website
: https://gsphc.nprocure.com on at hrs. or any other suitable time
thereafter, in his office in the presence of intending Tenderers or their representative who
wish to remain present at that time. He will enter the amount of the tenders in a comparative
statement in a suitable form. In the event of a tender being accepted, the contractor shall,
thereupon for the purpose of identification, sign copies of the specifications and other
documents mentioned in his tender.
18.1 General rules and directions :
18.2 No receipt for any payment made by a Contractor will be entertained by the
Corporation in regard to any matter relating to this tender or the contract shall be valid and
binding on the Employer unless it issigned by the Authorised staff members of the Corporation.
18.3 All works shall be measured net by standard measure and according to the rules
and customs of the Corporation or any other method approved by the Corporation without
reference to any local custom. The measurements of work will be taken according to the
usual method in use in the Roads & Buildings Department and no proposal to adopt
alternative method will be accepted. The Executive Engineer decision as to what is the usual
method in use in the Corporation/Roads & Building department will be final.
18.4 Under no circumstance shall any Contractor be entitled to claim enhanced rate
for any item in this contract except as provided in contract conditions.
18.5 No payment in foreign exchange will be made under this contract.
18.6 The contractor shall not be permitted to tender for the work in which his near
relative is working as the officer in the sphere of his jurisdiction in the Corporation.
Note : By term "near relative" is meant wife, husband, parents, children, brothers,
sisters uncles, aunts, cousins, and in-laws.
18.6 The contractor should compulsorily furnish his latest address(es) including
the latest address of his partners and the place(s) of filing his/their income-tax returns along
with the tender (in the Annexure form 7) Any changes, in such addresses, during the
tenure of contract should invariably and forthwith be intimated by the Contractor to the
Executive Engineer.
19.0 Submission of irformation I documents:
In addition to various specified documentsand information required to be submitted
along with tender, the bidder may be required to provide any other document I relevant
information as considered necessary by the tender inviting authority and the tenderer shall
be required to provide the same as per the requirement of the tender inviting authority. Even
the successful bidder may be required to provide the same as and when required by the
authority during subsistence of the contract.
20.0 Tender validity period :
The tender for the work shall remain open for a period of 90/120 days (90 days
for estimated cost below Rs. 10.00 Lacs & 120 days for estimated cost above 10.00 lacs.)
counted from the stipulated last date of receiving of the tenders online for this work. The
tenderer shall not be allowed to withdraw or make any modifications or additions in the terms
and conditions of his tender not acceptable to the Corporation after stipulated last date and
time of online submission of tender. In such cases, the Corporation shall without prejudice to
any right or remedy be at liberty to forfeit in full the earnest money absolutely. However, the
tenderer is at liberty to modify his offer, but the same should be submitted online before the
last date & time of online submission of tender.
21.0 Agreement of Stamp
Successful tenderer i.e. in case of a proprietorship firm, the proprietor, in case of
partnership firm, the partner or in case of a limited Company, the Director or a person duly
authorized by the Board of Directors will have to execute the agreement on a stamp paper of
the value as required under Indian Stamp act.
22.0 Declarations :
The tenderer will have to make declaration enlisted in the form attached herewith and
shall affix his signature to the form in token of correctness of declarations made therein.
DECLARATION FORM
(i) lf\Ne hereby declare that 1/we have visited the site and fully acquainted myself/
ourselves with the local situations regarding materials, labour and other factors pertaining to
the work before submitting this tender.
(ii) lf\Ne hereby declare that lf\Ne have carefully studied the conditions of contract,
specifications and other documents of this work and agree for executing the same accordingly.
(iii) lf\Ne hereby declare that my/our near relatives or in-laws are not working as an
officer in the sphere of jurisdiction for supervision of the work in the Gujarat State Police
Housing Corporation Ltd.
(Signature of the Contractor with Seal)
TENDER FOR WORKS AND MEMORANDUM
1/We hereby tender for the execution of the work specified in the underwritten memorandum
for the Gujarat State Police Housing Corporation Limited (hereinbefore and hereinafter
referred to as the Corporation) at the tendered rates specified by me/us in Schedule showing
items and rates of works to be carried out and in accordance in all respects with the
specifications, designs, drawings, and instructions in writing referred to in this tender and in
clauses of the annexed conditions.
Name of Project :
(b) Estimated Cost: Rs. _
(c) Earnest Money: At the rate of one /two percent of estimated cost Rs. _
(1.00% for estimate cost above Rs.10.00 lacs, & 2.00% for estimated cost up to Rs.10.00
(d) (1) Security Deposit:Ten percent of contract Price Rs. _
(For estimate cost above Rs.10.00 lacs.) See Clause 2 of section -3 for details
(A) Five percent in the form of FDR!Bank Guarantee of specified Banks only & having more than
6 monthsstanding of expiry of stipulated date of completion of work. Incase oftime
limitextended bank guarantee isto be renewed and submitted accordingly.
(B) Balance five percentto bedeductedfrom current bills@ 10% of total amount of the bill.
(B) Balance five percentto bedeductedfrom current bills@ 10% of total amount of the bill.
(C) Total Security Deposit: Ten percent of the contract price.
(d) (2) Security Deposit: Five percent of contract Price Rs. _
(For estimate cost up to Rs.10.00 lacs.) See Clause 2 of section -3 for details
{A) Two and half percent in the form of FDR I Bank Guarantee of specified Banks only &
having more than 6 months standing of expiry of stipulated date of completion of work. Incase
oftime limitextended bank guarantee isto be renewed and submitted accordingly.
(B) Balance two and half percent to be deducted from current bills @ 10% of total amount of the
(B) Balance two and half percent to be deducted from current bills @ 10% of total amount of the
(C) Total Security Deposit: five percent ofthe contract price
(d) (3) Security Deposit :
A. In Case of tenders for Annual Rate Contract (A.R.C), total 10% security deposit of the
contract value is payable.
B. Out of which, first 5% of the contract value will be payable in the form of FDR/Bank
Guarantee, of specified banks only(See clause no.2 of section-3 for details)
C. Balance 5% deposit of the contract price will be deducted @ 20% from each of the first
(e) Time allowed for the completion of work from the date of written order to commence
Should this tender beaccepted, 1/We hereby agree to abide byandfutfill allthe terms and conditions of
contract annexed hereto so far as applicable and in case of default, the Corporation shall have all
rights for forfeiture of security deposit bythe Corporation as perterms and conditions of contract.
(1) Cashreceipt/FDRreceiptNo.* ,dated forRs. _
(2) EMD EXEMPTION CERTIFICATE ISSUED BYCORPORATION BEARING NO. _
DATED OF RS. VALID UPTO ,is forwarded
herewith representing the EARNEST MONEY, the value of which is to be absolutely forfeited by the
Corporation, should 1/We do not deposit the full amount of security deposit as specified in the above
memorandum in accordance with Clause 2 of section - 3. On payment I deposit of required security
deposit in conformity with the contract condition, the said EMD(as per (1) above) shall be refunded..
**Signature of the contractor
(Witness)***-----------
Nameandaddress _
*Cash Receipt/FOR signed bythe authorized person ofthe Corporation.
**Signature of contractor before submission of tender
***Signature of witness to Contractor'a;ignature
The above tender is hereby accepted by me on behalf of the Corporation
datedthe dayof 200 _
Superintending Engineer
G.S.P.H.C. Ltd.
TERMS & CONDITIONS OF CONTRACT
Clause - 1.0 Definitions and Interpretation.
1.1 In the contract (as hereinafter defined), the following words and expressions will
have the meanings hereby assigned to them.
(a) Approved/Approval means approved in writing.
{b) Construction plant means all equipment's, appliances or things of whatsoever
nature required for the execution, completion or maintenance of the works or temporary
works but does not include materials or other things intended to form or forming part of the
permanent work.
(c) Contract means the instruction and general rules and direction for tenderers, terms
and conditions of contract, specification, drawings, tender (including the schedules of
quantities and tender prices), the formal agreement and all addenda and attachments related
(d) Contractor means the particular person, firm or the Company with whom the contract
has been made for executing the works.
(e) Contract value means the total tender amount indicated in the letter of acceptance
(f) Corporation means the Gujarat State Police Housing Corporation Ltd.
(g) Drawings means the drawings referred to in the specifications, any modification of
such drawings approved in writing and such other drawings as may from time to time be
furnished or approved in writing by the Executive Engineer.
(h) Employer/Owner means The Gujarat State Police Housing Corporation Limited.
(i) Engineer-in-charge means the Project Manager/Executive Engineer/Senior Officer
of the G.S.P.H.C. LTD concerned with the works or specified parts of the works under the
contract or such other assistants or subordinates to whom the Executive Engineer may have
delegated certain duties, acting separately within the scope of the particular duties entrusted
0) Superintending Engineer I Officer of the Corporation in overall charge of the work.
{k) Tendered Amount means the total tender amount indicated in the letter of acceptance
(I) ISS means Indian Standard Specifications.
(m) Day means a day from midnight to midnight.
(n) Month means from the beginning of a given date of a calendar month to the end of
the preceding date of the next calendar month.
(o) Week means seven consecutive days.
(p) Site means the lands and other places on, under in or through which, the works are
to be executed or carried out and any other lands or places provided by the owner for the
purpose of the contract together with such other places as may be specifically designated in
the contract or subsequently approved as forming part of site.
(q) Temporary works means all temporary works of every kind required for the
performance of the contract.
(r) The expression "work" or ''works" where used in these conditions shall, unless,
there be something in the subject or context repugnant to such construction be construed to
mean the work, or the works contracted to be executed under or in or by virtue of contract,
whether temporary or permanent and whether original, altered, substituted or additional.
1.2 (a) Singular and Plural.
Where the context so requires, words importing the singular only also include the plural
and vice-versa.
1.2 (b) Headings and Marginal notes to conditions :
Heading and Marginal Notes to these General Conditions shall not be deemed to form
part thereof or be taken into consideration in the interpretation or construction thereof or of
1.2 (c) Wherever the term "specification" is used, apart from a specified standard
specification, it shall mean the specification or plan prepared for a particular work as per the
instructions to the contractor in executing that item of work.
1.3 Errors, Omissions and Discrepancies :
The several documents forming the contract are essential parts of the contract and a
requirement occurring in one is as binding as though occurring in all; they are intended to be
mutually explanatory and complementary and to describe and identify a complete work. In
the event of any discrepancy in the several documents forming the contract or in any one
documents, the following order of precedence should apply:
(i) Between the written description of the item in the Schedule of items and rates of
work to be carried out or written dimensions on the drawing and the corresponding one in the
specifications, the later shall apply;
(ii) Between the written description of the item in the Schedule of items and rates of
work to be carried out and the detailed description in the specifications of the same item, the
later shall be adopted.
(iii) Figured dimensions shall superseded sea led dimensions. The drawings on a larger
scale shall take precedence over those on smaller scale; and
(iv) Drawings issued as construction drawings from time to time shall supersede the
corresponding drawings previously issued.
In the case of defective description or ambiguity, the Executive Engineer is entitled to
issue further instructions directing in what manner the work is to be carried out. The contractor
cannot take any advantage of any apparent error or omission in drawings or specifications
and the Executive Engineer shall be entitled to make corrections and interpretations as
necessary to fulfil the plans and specifications.
Clause 2.0 SecucitvDeposit (Submission & refund)
(A) Submission of$ecuritvDeposit
The person/persons whose tender is accepted (hereinafter called the "Contractor' which expression shall,
unless excluded by, or repugnant to the context include his Legal heirs, executors, administrators and
assignees) shall deposit within a period of fifteen days from the date of receipt of letter of acceptance of his
tender, 50% (fifty percent) of the total security deposit in the form of FDR IBank Guarantee in favour of
Gujarat State Police Housing Corporation Ltd., Gandhinagar & FDRI Bank Guarantee must be of more than6
months standing of stipulated date of oompletion. The FDR IBank Guarantee to be deposited in favor of
Gujarat State Police Housing Corporation Ltd., Gandhinagar referred to above towards the security deposit
MUST be of ANY of the Banks mentioned below.
ICICI Bank Indian Bank
lOBI Bank Indian Overseas Bank
Bank Of Baroda State Bank Of India
Bank Of India Punjab & Sind Bank
Bank Of Maharashtra Punjab National Bank
Canara Bank HDFC Bank
Central Bank Of India UCO Bank
AXIS Bank Union Bank Of India
And also of the banks as notified by Finance department of government of gujarat from time
The Corporation shall be deemed to have been authorized to deduct the balance Fifty
percent of the security deposit as specified in the tender form from the amounts that become
payable to the contractor for the work done under the contract from time to time. Such deduction
shall be made@ ten percentage (10%) of the amount payable under R.A./ Final bill.
The Contracting agency at its discretion, at any time may submit FOR favouring Corporation (any
of the above mentioned banks) of the amount equivalent to security deposit so deducted and in
such case, amount deducted from R.A I Final Bill will be refunded. Such FOR /bank
guarantee/deducted from R.A bills shall be held by Gujarat State Police Housing Corporation Ltd.
Gandhinagar as security deposit.
The term of FOR submitted by the contracting agency should be up to the period of the Defect
Liability Period as per tender condition of the contract for which the FOR is being submitted.
If at any time during the contract period, the contracting agency submits FOR equivalent to the
balance amount or part thereof of security deposit liable to be deducted in future, then no security
deposit shall be deducted from the payments made to the agency from R.A/Final bill thereafter
The Corporation may, however, at its discretion deny the acceptance of FDR in lieu of security
deposit deducted from R.A/Final Bill. The decision of the Corporation in this regard shall be final
and binding upon the contracting agency.
All compensation, liquidated damages or other sums or money payable by the contractor to
Corporation under the terms of this contract shall be deducted from or recouped by the realization
of a sufficient part of his security deposit, or from the interest arising there from or from any sums
which may due or may become due by Corporation to the Contractor on any account whatsoever
in respect of this contract, or any other contract, or otherwise. In the event of his security deposit
being reduced by reason of any such deduction or recoupment as aforesaid, the contractor shall
within fifteen days thereafter, make good in cash as aforesaid any sum or sums required to make
good the shortfall in the amount of the security deposit. If the full amount of the security deposit
to be paid in cash within the period specified above, is not paid, the tender I contract already
accepted shall be considered as cancelled and available security deposit shall be forfeited and
the tenderer I contractor may be debarred from tendering for future works
If on preparation of final bill, it is noticed that final cost of work varies i.e. (by way of excess or
savings) in relation to contract price, the amount of security deposit will be adjusted with reference
to the final cost of the work at the time of payment of final bill.
B1. Refund ofSecyrjtv peposjt
From total 10 % of security deposit, First 50 % of security deposit (deposited in the form of FDR I
Bank Guarantee received at the time of contract), will be released after one month of final bill
o On submission of satisfactory completion report and recommendation for release of
security deposit from Executive Engineer
o Compliance of all statutory provisions including Clause No. 44.3 by the contracting agency
with regard to GST provisions.
Balance 50% of Security Deposit (Deducted from R.A bill payments) will be released after
completion of Defect Liability period as per Clause No. 26.2 on recommendation and
submission of satisfactory completion certificate No defect and satisfactory maintenance
certificate obtained from the beneficiary by the Executive Engineer in the prescribed form
No.1.(Page No.:-61)
In case of annual Rate Contract, Security deposit of 5% will be released after one month
from the payment of final bill payment of the last work under annual Rate Contract on
submission of satisfactory completion report and recommendation of the release of Security
deposit from the concerned Executive Engineer AND satisfactory compliance provision of all
statutory provision including of GST as per Clause No. 44.3.
Remaining 5% security deposit will be released after completion of defect liability period
(as per Clause No. 26.2) on submission of satisfactory completion reports/No defect and
satisfactory maintenance certificate by Executive Engineer obtained from beneficiary and
satisfactory maintenance in the prescribed format.
It may be clarified here that before release of final and balance security deposit,
Within expiry of the defect liability period and maintenance period, the amount of expenses
if any incurred by the corporation for the concerned project will be deducted from the
aforesaid security deposit available with the corporation under this contract or other
Clause : 3.0 Progress Schedule
(a) The contractor shall furnish within one month (unless extended by the Executive
Engineer) of the order to start the work, the progress schedule in quadruplicate indicating the
date of staring, the monthly progress expected to be achieved and the anticipated completion
date of each major item of work to be done by him, also indicating dates of procurement and
setting up the materials, plants and machinery. The schedule should include a statement of
proposed general and detailed arrangements for caring out works, and of item, order and the
manner in which it is proposed that these shall be executed. The schedule should be framed
keeping requirement of the clause 56 of tender form in view and be such as in practice to
respect in the achievement towards completion of the work in the time limit and of the
particular items on the dates specified in the contract and shall have the approval of the
Executive Engineer. Further, the dates for the progress, as in this schedule shall be adhered
(b) In case it is found necessary, at any stage to alter the schedule, the contractor shall
submit in good time a revised schedule incorporating necessary modification proposed and
get the same approved from the Executive Engineer. No revised schedule shall be operative
without such acceptance in writing. The Executive Engineer is further empowered to ask for
more detailed schedule or schedules, say week by week, for any item or items and the
contractor shall supply the same as and when asked for.
(c) The Executive Engineer shall have, at all times, the right, without in any way vitiating
this contract or forming grounds for any claim, to alter the order of the work or any part there
of and the contractor shall after receiving such direction, proceed in the order directed. The
contractor shall also revise the progress schedules accordingly and submit four copies of the
revised schedule to the Executive Engineer within seven days of the said Engineer's direction
to alter the order of works.
(d) The contractor shall fumish sufficient plant, equipment and labour and shall work for
such hours and shifts as may be necessary to maintain the progress of the work as per
approved progress-schedule. The working and shift hours shall comply with all the Government
regulations in force and shall be such, as may be approved by the Executive Engineer and
the same will not be varied without the prior approval of Executive Engineer.
(e) The contractor shall from time to time, as may be required by the Executive Engineer,
furnish the Executive Engineer with a statement in writing of the arrangements he proposes
to adopt for the execution of this contract and the Executive Engineer may, if he considers
necessary at any time advise alternation in the same, which the contractor shall adopt on
notice thereof.
(f) The progress-schedule(s) shall be in the form of progress chart, forms, statements
and/or reports as may be approved by the Executive Engineer.
The contractor shall submit four copies showing the progress of the work in the form of a
chart etc., at periodical intervals as may be specified by Executive Engineer.
(g) The approval of the progress schedules by the Executive Engineer shall not relieve
the contractor of any of his duties and responsibilities under the contract. The adoption of
any modification in the schedule required by the Executive Engineer shall not entitle the
contractor to any extra payment.
Clause 4.0 Setting out
The contractor shall be responsible for the true and proper setting out of the works
and the correctness of positions, levels, dimensions and alignments of all parts of the work
and for the provisions of all necessary instruments, appliance and labour in connection
therewith. If, at any time, during the progress of the work, any errors appear or arise in the
position, levels, dimensions or alignments of any part of the work, the contractor, on being
required to rectify such errors by the Executive Engineer shall at his own expense do so to
the satisfaction of the Executive Engineer. If however, such error is based on incorrect data
supplied in writing by the Executive Engineer,the expenses of rectifying the same shall be
borne by the Corporation. The checking of and setting out of any line or level by the Executive
Engineer or his representative shall not in any way, relieve the contractor of his responsibilities
for the correctness of the error. The contractor shall carefully protect and prepare all bench
marks, site-nails, pegs and other things used in setting out of the work(s).
6.1.3 Cement Register :
A register in the prescribed form showing day-to-day receipt, consumption and balance
of cement on site of work will be maintained by the Corporation, which shall invariably be
signed daily by the contractor or his authorized representative in token of its correctness.
Clause 7.0 Testing Materials
(a) All materials before being utilized for works shall be inspected and tested, wherever
necessary, by the Executive Engineer or his representative. The nature and number of testing
will be done, as per frequency and acceptance criteria for building materials used for
construction as shown in "General Technical Specifications for Building" booklet enclosed.
However the Executive Engineer shall have powers to modify frequency of tests. in addition
shall be the day to day and periodical tests to be carried out on materials, mixes and placed
concrete, mortar etc. to be done on site shall be specified by the Executive Engineer from
time to time and the contractor shall provide all facilities towards collections of samples etc.
Over and above testing for other construction materials shall be got tasted prior to execution
of work as decided by Engineer lncharge. Unless otherwise specified, labourers for collecting
samples and the packing of the samples shall be provided free of cost by the contractors.
The materials shall be tested in GERIIaboratory or at any other place/laboratory as directed
by the Executive Engineer and the results given by such authorities shall be considered as
final. It shall then be the contractor's responsibility toprovide material s confirming to the
approved samples to the standards as determined by the laboratory tests.
(b) Consolidated record of results of tests will be maintained in the prescribed Quality
Control Register to be maintained jointly by the contractor and the Executive Engineer on the
(c) Testing charges for quality tests of materials and workmanship will be recovered
from running and final bill of the contractor athe rate of one percent of the value of work
(d) The contractor shall supply all materials required for testing free of cost.
(e) The contractor shall make suitable arrangements to see that one of his
representative remains present at the time of taking samples and shall authenticate the facts,
if so required. Should the contractor fail to keep his representative present at site at the time
of taking samples or fail to provide required labourers and ot her equipments to collect the
samples, it shall be taken by the Executive Engineer and the samples selected shall be
considered as authentic.
The cost incurred by the Executive Engineer when the contractor fails to provide
required men and materials for collecting samples shall be recovered from the contractor.
(f) For cement concrete items, in addition to the cube tests while items are executed,
the quality of concrete set may be tested at any time during Defect Liability period by non
destructive tests, if any complains received from the concerned Police Officers about the
inferior quality of concrete work, then, and if so desired by the Executive Engineer subject to
review of the decision by Managing Director of the Corporation even after such items are
executed, accepted and paid. Depending upon non-destructive test result, testing charges
for this test will be borne by the contractor only if the result is negative. Further, if the result is
negative i.e. concrete is found sub-standard, the contractor shall remove the concrete and
execute a fresh concrete of the specified standard without extra payment.
8. Workmanship :
8.1 The contractor shall execute the whole and every part of the work in workman-like
manner and both as regard materials and in other respect in strict accordance with
specifications. The contractor shall also confirm exactly, fully and faithfully to the design,
drawings and instructions in writing for the work signed by the Executive Engineer. The design
and the drawings shall be lodged in the office of the Executive Engineer to which the contractor
shall be entitled to have access for the purpose of inspection at such office during office
Where the instructions referred to above are not contained in separate letters addressed
to the contractor the same shall be recorded in the Work Order book, which shall be maintained
and kept on the site of the work. The contractor shall be required to sign such entries in the work
order book intoken of having noted instructions. However if the contractor fails to sign the work
Order Bookfor any reasons whatsoever, the entry ofthe instructions in the Work Order Book shall
be deemed to be the due notice to him of the said instruction. The Work Order Book shall be
open for inspection to the contractor on the site of the work during officer hours.
8.2 The contractor will be entitled to receive the certified copy of the accepted tender
along with the work order free of cost and will also be entitled to receive, on request three
sets of contract and working drawings, according to the progress of work, as and when
needed, free of cost.
Clause 9.0 Machinery and Equipment :
The contractor shall give a list of machineries and equipment immediately available
with him for use on the work in Annexure 3 and which they propose to procure for the work in
Clause 10.0 Inspection and Approval :
All works shall be subject to examination and approval by the Executive Engineer at
each stage thereof and the contractor shall give due notice to the Executive Engineer or his
authorized representative when each stage is ready. In default of such notice, the Engineer
in-charge shall be entitled to appraise the quality and extent thereof in the manner he deems
No work shall be covered up or put out of view without approval of the Executive
Engineer or his authorized representative without giving an opportunity for examination of
foundation before permanent work is placed thereon. The contractor shall give due notice to
the Executive Engineer or his representative without unreasonable delay, unless the Executive
Engineer considers it unnecessary and advises the contractor accordingly, to attend for the
purpose of examining and measuring such work or for examining such foundations. In the
event of the failure of the contractor to give such notice, he shall, if required by the Executive
Engineer uncover such work at the Contractor's expense.
Corporation Officers concerned with the contract and Vigilance Officers shall have
powers at any time to inspect and examine any part of the works and the contractor shall give
such facilities as may be required for such inspection and examination.
Clause 11.0 Duties and Powers of Executive Engineer's Representatives.
The duties of the Representative of the Executive Engineer, are to watch and supervise
the works and to test, examine any materials to be used or workmanship employed in
connection with the works. They shall have no authority to order any work involving any extra
payment by the employer nor to make any variation in the works.
Failure of the representative of the Executive Engineer to disapprove any work or
materials shall not prejudice the power of the Executive Engineer thereafter to disapprove
such work/materials and to order the pulling down, removal or breaking thereof, if the considers
such work sub-standard.
If the contractor shall be dis-satisfied with any decision of the representative of the
Executive Engineer, he shall be entitled to refer the matter to the Executive Engineer who
thereupon confirm, reverse or vary such decision.
Clause 12.0 Removal of Workmen
The contractor shall employ in and about the execution of works only such persons as
are skilled and experienced in their several trades and the Executive Engineer shall be at
liberty to object to and require the contractor to remove from the works any person employed
by the contractor in or about the execution of the works who in the opinion of the Executive
Engineer misconducts himself or is incompetent or negligent in the proper performance of
his duties concerning execution of work and such person shall not be again employed upon
the works without permission of the Executive Engineer.
Clause 13.0 Entering upon or Commencing any portion of work.
The contractor shall not enter upon or commence any portion of work except with the
written authority and instruction of the Executive Engineer or of his representative in charge
of the work. Failing such authority, the contractor shall have no claim to ask for measurement
of or payment for work.
Clause 14.0 Access to site and work on site
The Engineer may, if he considers fit from to time, enter upon any land(s) which may
be in possession of the contractor of this contract for the purpose of executing any work not
included in this contract and may execute such works not included in this contract by agents
or by other contractors, at his option and the contractor shall, in accordance with the
requirements of the Executive Engineer, afford all reasonable facilities for execution of the
work including occupation of lands or structure or otherwise to any other contractor employed
by the Corporation and his workmen or for the workmen of the Corporation who may be
employed in the execution on or near the site of the work not included in the contract or of any
contract in connection with or ancillary to the work and in default, the contractor shall be liable
to the Corporation for any delay or expense incurred by reason of such default. Provided always
that if the exercise of these powers shall cause any damage to the Contractor, he may, within
fifteen days of such damage arising, make a statement of the same to the Executive Engineer
who shall from time to time, assess the value in his judgment of such damage and the
Corporation shall from time to time pay to the contractor the amounts (if any) accepted as
justified by the Executive Engineer :
Clause 15.0 Lumpsum in Estimates
When the estimate on which a tender is made includes lump sum in respect of part of
the work, the contractor shall be entitled to payment in respect of the items of work involved
or the part of the work in question at the same rates as are payable under this contract for
such items, or if the part of the work in question is not in the opinion of the Executive Engineer
capable of measurement, the Executive Engineermay, at his discretion, pay the lump sum
amount entered in the estimate and the certificate in writing of the Executive Engineer shall
be final and conclusive against the contractor with regard to any sum or sums payable to him,
under the provisions of this clause.
Clause 16.0 Action where no specifications
In the case of work for which there is no such specification, such work shall be carried
out in accordance with the R & B Divisional Specification and in the event of there being no
R & B Divisional Specifications, then, in such case the work shall be carried out in all respects
in accordance with the instructions and requirements of the Executive Engineer.
Clause 17.0 Other Contractors
17.1 When two or more contractors are engaged on work in the same vicinity, they
shall work together in a spirit of cooperation and accommodation. The contractor shall not
take or cause to be taken any steps or actions that may cause disruptions, discontent or
disturbance to the works, labour and other arrangements of other contractors in the
neighboring project localities. In the case of any difficulties amongst the contractors the
Executive Engineer shall direct the manner in which each contractor shall conduct his works
so far as it affects the others.
17.2 It is possible that work at, or in the vicinity of the site of work will be performed by
the Corporation or by other contractors engaged in work for the Corporation during the
contract period. Under such circumstances, the contractor shall without charge permit the
Corporation and such other contractors and other workmen to use the access facilities
including roads, lighting installation and any other facilities constructed or acquired by the
contractor for use in the performance of the works till they are required to be maintained for
the purpose of this work.
Clause 18.0 Maintaining Public Traffic
18.1 Where public traffic is required to cross over or pass through the work,
construction operation shall be so conducted as to provide a reasonably smooth, even
dustless and unobstructed passage for traffic at all times. Water shall be sprinkled as directed
for the abatement of dust in connection with maintaining public traffic. The contractor shall
construct temporary connections of sufficient width for traffic between the existing road way
and new construction where necessary. At any and all points along with the work where the
nature of the construction operations in progress and the equipment and machinery in use
are of such character as to endanger passing traffic, the contractor shall provide such
personnel and set up arrangements as may be necessary to safeguard against accidents
and avoid damage or injury to passing traffic.
Clause 19.0 Ecological balance
19.1 The contractor shall maintain ecological balance by preventing deforestation,
water pollution and defacing of natural landscape. The contractor shall so conduct his
construction operations as to prevent any unnecessary destructions, scarring or defacing of
the natural surrounding in the vicinity of the work. In respect of ecological balance, contractor
shall observe the following instructions :
(a) Where unnecessary destruction, scarring damage or defacing may occur as a result
of the operations, the same shall be repaired, replanted or otherwise corrected at, the
contractors expenses. The contractor shall adopt precautions, when using explosives which
will prevent scattering of rocks or other debris outside the work area. All work areas shall be
smoothened and graded in a manner to confirm to the natural appearances of the landscape
as directed by the Executive Engineer.
(b) All trees and shrubbery which are not specifically required to be cleared or removed
for construction purpose shall be preserved and shall be protected from any damage that
may be caused by the contractor's construction operations and equipment. The removal of
trees or shrubs will be permitted only after prior approval by the Executive Engineer. Special
care shall be exercised where trees or shrubs are exposed to injuries by construction
equipment, blasting, excavation, dumping, chemical damage or other operation and the
contractor shall adequately protect such trees by use of protective barriers or other methods
approved by the Executive Engineer. Trees shall not be used for anchorages. The contractor
shall be responsible for injuries to trees and shrubs caused by his operations. The term
"injury'' shall include, without limitation, brushing, scarring, tearing and breaking of roots, trunk
or branches. All injured trees and shrub shall be restored as nearly as practicable without delay
to their original condition at the contractor's expenses.
(c) The contractor's construction activities shall be performed by methods that will
prevent entrance or accidental spillage of solid matter contaminants, debris and other
objectionable pollutants and wastes into river. Such pollutants and wastes include earth and
earth products, garbage, cement concrete, sewage effluent, industrial wastes, radio-active
substances, mercury, oil and other petroleum products, aggregate process tailing products,
minerals and thermal pollution. Pollutants and wastes shall be disposed off in a manner and
at sites approved by the Executive Engineer.
(d) In the conduct of construction activities and operation of equipments, the contractor
shall utilize such practicable methods and devices as are reasonably available to control,
prevent and otherwise minimize air pollution.
(e) Excessive emission of dust into the atmosphere will not be permitted during the
manufacture, handling and storage of concrete aggregate and the contractor shall use such
methods and equipment as are necessary for collection and disposal or prevention of dust
during these operations. The contractor's method of storing and handling cement shall also
include means of eliminating atmospheric discharge of dust. Equipment and vehicles that
give objectionable emission of exhaust gases shall not be operated. Disposal of materials
resulting from clearing of trees, brush combustible construction materials and rubbish may
be permitted only when atmospheric conditions for burning are considered favorable.
19.2 Separate payment will not be made for complying with provisions of this Clause
and all cost shall be deemed to have been included in costs of items in Memorandum of
items and rates of work to be executed.
Clause 20.0 Local Roads and Haul Roads
20.1 The existing public roads near the site of work are shown on the drawing. The
contractor may construct and maintain additional roads as required at his own expense.
20.2 The contractor's heavy construction traffic of tracked equipments shall not travel
on any public roads or bridges unless the contractor has made arrangements with the authority
concerned and approval ofthe Executive Engineer to such arrangements has been obtained.
20.3 The contractor shall plan transportation of construction materials to work site in
such a way that road accidents are avoided.
20.4 The contractor shall construct and maintain at his own cost all suitable temporary
haul roads at the work site as may be found necessary by him for the execution of work. For
construction of haul roads including those required for transport of construction materials and
installation of plant and equipments, the contractor shall give a proposal for lands required by
him. The employer will acquire additional lands, if required, for such purposes. The location of
all such haul roads and any subsequent modifications thereto shall be got approved by the
Executive Engineer.
20.5 During the period of the contract, the Employer and other contractors employed
by the Employer may be engaged on other works in the vicinity of the works covered by this
contract. The contractor shall allow the Executive Engineer and other contractors free and
reasonable use of all temporary haul roads except vital haul roads upon which the contractor
may impose restriction to prevent interruption to concrete hauling operations. Any such
restrictions must be approved by the Executive Engineer.
20.6 Separate payment will not be made for the construction and maintenance of the
temporary haul roads including any necessary special protections or strengthening required
and all cost of such works shall be deemed to have been included in the rates of items of
Clause 21.0 Road crossings or works crossing
21.1 Where the work to be performed under this contract crosses or otherwise
interferes with water, sewer, gas or oil pipeli nes, buried cable or other public utilities Electric,
Telephone, W.S. Sewarage, the contractor shall, provide for such utilities and shall perform
such construction operations during the progress of the work so that no damage will result to
either public or private interests. Employer does not claim that the locations of utilities shown
on the drawing are exact or exhaustive. It shall be responsibility of the contractor to determine
the actual locations of and make provision for all utilities.
21.2 Before utility is taken out of service, permission shall be obtained from the owners.
The contractor shall be liable for all damages that may result from failure to provide for utilities
during the progress of the work and the contractor shall indemnify and hold harmless the
Employer from claims of what-so-ever nature or kind arising out of or connected with damages
to utilities encountered during construction, damages resulting from disruption of service and
injury to persons or damages to property resulting from the negligent, accidental or intentional
breaching of utilities.
21.3 Irrigation systems disturbed by the work shall be restored in the location and in
as good a condition as originally found, except as otherwise approved. If construction of other
contractors cause damages or damages occur during planting or growing season, temporary
crossings must be implemented to provide uninterrupted service to the users.
21.4 If the contractor does not maintain the existing water source and utilities in such
condition that no damage will result to either public or private interests, the Employer will
cause the necessary repairs to be made and recover charges from the contractor for such
21.5 Except as otherwise provided below, the cost of all work described in this clause
shall be included in rates of items of work.
21.6 Where construction of new structures or modification of existing structures are required
to render the utilities inoperative beyond the period of the contract, the contractor shall notify the
Executive Engineer so that arrangement can be made with the owners for the construction or
modifications required.When itis determined that such works are to beperformed bythe contractor,
and such item of work is not provided for in the Memorandum of items and rates of work to be
executed, the contractor shall perform the necessary work on extra payment basis.
21.7 Where utilities are encountered but are not shown on the drawing or otherwise
provided for in these specifications, all additional works required to be performed by the
contractor as a result of encountering the watercourses or utilities shall be performed, on
extra payment basis.
22.0 Old curiosity
In the event of discovery by the contractor or his employees, during the progress of
work of any gold, silver, oil or other minerals of any description and precious stones, treasury,
coins, antiquities, relic, fossils or other articles or value of interest whether geological,
archaeological or any other branch of knowledge, such treasure and other things shall be
deemed to be the absolute property of the Corporation and the contractor shall duly preserve
the same to the satisfaction of the Executive Engineer, from time to time, and hand over the
same to the persons as the Executive Engineer may appoint.
The contractor shall take all reasonable precautions to prevent his workmen or any
other person from removing or damaging any such articles or things, immediately after the
discovery thereof and before removal acquaint the Executive Engineer with such discovery
and carry out his orders for the disposal of the same.
Clause 23.0 Observance of laws, Local regulation and attachments
The contractor shall confirm to all laws of the land and the regulations and bye laws of
any local authority and of any water or electricity supply companies with whose system the
structure is proposed to be connected. He shall before making any variations from the
drawings or specifications that may be necessitated for so confirming, give to the Executive
Engineer a written notice, specifying the variations proposed to be made and the reasons for
making them and apply for instructions thereon. In case the contractor does not receive such
instructions within seven days, he shall proceed with the work confirming to the provisions,
regulations or bye-laws in question and variation in the drawings or specifications so
necessitated shall be dealt with as per clause 51. The contractor shall give notices required by
the said Acts, regulations or bye-laws and pay the required fees in connection therewith.He
shall also ensure that no attachments are made against materials for works related to the
contracts. The contractor shall protect and indemnify Employer against all claims or liabilities
arising from or based on the violation of such laws, ordinances, regulations, bye-laws, decrees
or attachments by him or by his employees.
Clause-24.0 Contract documents and matter to be treated as confidential.
All documents, correspondence, decisions and orders concerning the contract shall
be considered as confidential and/or restricted in nature by the Contractor and he shall not
divulge or allow access to them by any unauthorized person.
Clause 25.0 Work during night or on Sundays and holidays
Unless otherwise provided, none of the permanent works shall be carried out during
night, Sundays or authorized holidays without permission in writing, However when work is
unavoidable or necessary for the safety of life, property or works, the contractor shall take
necessary action immediately and advise the Executive Engineer accordingly.
Clause 26.0 Action and compensation in case of bad work I and defect
liability period.
26.1 If at any time before the expiry of Defects Liability period as detailed in Clause
hereafter in clause 26.3 it shall appear to the Executive Engineer or his sub-ordinate in charge
of the work thaUany work has been executed unsound, imperfect or unskilled workmanship
or with materials of inferior quality or that any materials or articles provided by him for the
execution of the work are unsound, or of a quality inferior to that contracted for orare otherwise not in
accordance with the contract, it shall be lawful for the Executive Engineerto intimate this fact in writing
to the contractor and then notwithstanding the fact that the work,materials or articles complained of
may have been passed, certified and paid for, the contractor shall be bound forthwith to rectify, or
remove and reconstruct the work so specifiedin whole or in part as the case may require, or if so
required, shall remove the materials or articles so specified in whole or in part and provide other
proper and suitable materials or articles at his own charge and cost, and in the event of his failing to
do so within a period to be specified by the Executive Engineer in the written intimation aforesaid, the
contractor shallbe liable to pay Liquidated Damages at the rate of one percent on the amount of the
estimateof the rectification for every day not exceeding ten days during which the failure so continues,
and in the event of any such failure as aforesaid continuing beyond ten days, the Engineer- in-charge
may rectify or remove, andre-execute the work or remove and replace the materials complained of
as the case may be at the risk and expense in all respects of the contractor. The management of the
Corporation should consider that any such inferior worker materials as described above may be
accepted or made use of, it shall be within his discretion to accept the same at such reduced rates as
he may fix therefore.
26.2 Defect Liability Period.
(i) The Defects Liability period For original Building Work shall be earlier of (a) & (b) stated Below:-
a. Three years from the date of possession of building taken over by user agency OR elapse of
three full monsoon periods following date ofpossession of building taken over by user
agency, whichever is later.
b. Four years from the Certified Date of completion or elapse of four full monsoon periods
following the certified date of completion, whichever is later.
(ii) The Defects Liability period shall be as under for repairing/renovation works:
D For repairing I renovation work costing Rs. 50,000 or less, three months following
the certified date of completion.
D For repairing I renovation work costing more than Rs. 50,000 and up to Rs. 100 Lacs, One
year OR elapse of one full monsoon period following the certified date of
completion, whichever is later.
D For repairing I renovation work costing more than Rs. 100 Lacs or more, three years OR
elapse of three full monsoon periods following the certified date of completion,
whichever is later.
For the purpose of this clause, full monsoon period shall be from 1st -June to 30th- September.
26.3 Contractor's Liability for damage during defect liability period.
Ifthe contractor or his workmen, or servant shall break, deface any part of the work in question
in/on which they may be working or any building, road fence, enclosure or grassland, cultivated ground
contiguous to the premises on which the work or any part thereof is being executed or if any damage
shall occur to the work from any cause whatever before completion of the work or before the completion
of the defect liability period whichever is later or damage occurred/caused due to normal flood or rain
or if any imperfection becomes apparent in it within defect liability period, or otherwise by the executive
engineer, the contractor shall make good the same at his own expenses or in default, the executive
engineer may cause the same to be made good by the other contractor and deduct the expenses (of
which the certificate of the executive engineer shall be final) from any sums that may thereafter
become due to the contractor or from his security deposit or the proceeds of sale thereof or a sufficient
portions thereof.
26.4 Liability of contractor during defect liability period shall be with respect to removing I
rectification of any defect or lacuna found in quality or workmanship or standard of
manufactured item or in required specification of tender.
It is clarified that the defect liability does not include running expenses of water pumps,
electrical motors or replacement of consumable articles for rendering utility services like
electrical lamps, tube rode and bell.
The Complaint Book will be maintained in the specified quarter/office and the
occupants/tenants will lodge their complaints in this book about necessity for above
maintenance. The contractor will attend to such demand within fifteen days from the date of
complain in the complaint Book. If the contractor does not attend to maintenance as above,
the authorized representative of the Corporation will give registered Notice to attend the same
within fifteen days from the date of notice. If the Contractor still fail to attend to maintenance,
the maintenance work will be carried out from the amount of security Deposit retained for this
purpose. The last instalment of security deposit (remaining five percent) will be released only
on production of the certificate of Executive Engineer and from the concerned police/ jail
authority about no defect and satisfactory maintenance of buildings as required under this
26.5 Penalty For Leakage:-
"Lump sum amount of Rs. 15,000/- (Rupees Fifteen Thousand Only) shall be
recovered/deducted for every leakage occurred in the building as penalty, whereas for leakage
in the terrace, the amount of penalty shall be worked out at Rs. 175/-(Rupees one hundred
and seventy five Only) per sq. meter for the terrace area of that building shall be recovered
from the remaining final security deposit available with the corporation. Such penalty/recovery
will be over and above the rectification/ compliance of such leakage by the agency towards
partial damage to the building affecting its life and inconvenience caused to the beneficiary for
Clause 27.0 Indemnity
The contractor shall indemnify the Corporation against all actions, suits, claims &
demands through or made against the Corporation in respect of work of this contract against
any loss damage to Corporation in consequence of any action or suit being brought against
the contractor for anything done or omitted to be done in execution of the work of this contract.
Clause 28.0 Liability of contractor for any damages done in or outside work
Compensation for all damages done intentionally or unintentionally by Contractor's
labourers whether in or beyond limits of Corporation property including any damage caused
by the spreading of fire shall be estimated by the Executive Engineer, which subject to review
of the decision by the Dy. General Manager (technicai)/Superintending Engineer, on appeal,
shall be final and the contractor shall be bound to pay the amount of the assessed
compensation on demand, failing which the same will be recovered from the Contractor as
damages in the manner prescribed in clause 2 or deducted by the Engineer-in-charge from
any sums that may be due or become due from Corporation to the contractor under this
contract or otherwise.
The Contractor shall bear the expenses of defending any action or other legal
proceeding that may be brought by any person for injury sustained by him owing to neglect
of precautions to prevent the spread of the fire and he shall also pay the damages and cost
that may be awarded by the court in consequence.
28.1 INSURANCE OF WORKS:-
The contractor shall be responsible to arrange for insurance of the works for the full
replacement cost of any loss of or damage to the Building or any part of it and to any other
structure or its part as stated in the tender document arising out of accident, bad foundations,
earthquake, tempest, flood, fire, theft, riot or any other causes whatsoever, from the
commencement of the works until the time the possession of the building is taken over or
given to the beneficiary/end user. The contractor shall have to produce a copy of the
insurance policy to the Executive Engineer along with the 1st RA Bill and subsequently
provide a copy of insurance policy when the same is renewed, failing which payment of bill
shall not be made. The contractor shall have to reconstruct the building or structure or any
part of it which has been damaged as above at his own cost.
Clause 29.0 Rescinding of contract in case of subletting or contractor
becoming insolvent, Change in the constitution of firm to be notified :
29.1 The contract shall not assigned or sublet without the written approval of the
Corporation and if the contractor shall assign or sublet the contract or attempt to do so in any
apparent or camouflaged way or become insolvent or commence any proceeding to get
himself adjudicated an insolvent or make any compromisation with his creditors, or attempt
to do so, the Corporation may, by notice in writing rescind the contract and decision of the
Corporation in this regard shall be final and binding to the contractor. Also if any bribe, gratuity, gift,
loan, perquisite, reward or advantage, pecuniary or otherwise, shall either directly or indirectly be given,
proposed or offered by the contractor, or any of his servants or agents to any public officer or person
in the employment of Corporation in any way relating to his office or employment, or if any such officer
or person shall become in any way directly or indirectly interested in contract, the Corporation may
thereupon by a notice in writing rescind the contract. In the event of contract being rescinded, the
Security Deposit of the contractor shall thereupon stand forfeited and be absolutely at the disposal of
Corporation and the same consequence shall ensure as if the contract had been rescinded under
Clause 57 hereof and in addition the contractor shall not be entitled to recover or be paid for any work
thereafter actually performed under the contract.
29.2 Inthe case of a tender by partnership firm or a limited company, any change in its
constitution shall be forthwith notified by the Contractor to Executive Engineer for his
Clause 30 Claim for compensation for delay in making available land
No compensation shall be allowed for any delay caused in execution of the work on
account of delay in making available the full site of land at a time. No compensation shall
also be allowed on account of work being hindered or delayed because of any utility services
like water, sewer, gas or oil pipe lines, electricity or telephone lines buried or overheads or
other public utilities existing at the site of work or because of time required to remove or
Clause 31 Claim for compensation for delay in the execution of work.
No compensation shall be allowed for any delay in execution of the work on account of
water standing in low lying area ofthe site as well as delay in shifting utilities by the authority.
The rates are inclusive of hard or cracked soil, excavation in mud, sub soil water in excavation
trenches and no claim for an extra shall be entertained unless otherwise expressly specified.
Clause 32.0 Safety Provisions
32.1.1 The contractor in his operations shall arrange for the safety measures as
required inclusive of the provisions in the Safety Manual published by the Central Water and
Power Commissions, New Delhi (January 1962 edition). In case the contractor fails to make
such arrangements the Executive Engineer shall be entitled to cause them to be provided
and to recover the costs thereof from the contractor.
32.1.2 For failure to comply with the provisions of the Safety Manual the contractor
shall without prejudice to any other liabilities, pay to the Employer a sum not exceeding one
thousand per day for each day of default, subject to a maximum of one percent of tendered
32.2. The contractor shall be responsible for and shall pay the expenses of providing
medical aid to any workmen who may suffer a bodily injury as a result of an accident. If such
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. B-1 Percentage Rate TENDER DOCUMENT_ 24-3-23_01 to 36.pdf
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .