Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.9 L+₹1.4 L (24.6%)Rejected-AOC LINI NIVAS NALLILA KOLLAM | KOLLAM | KOLLAM | KERALA | L2 | Rejected-AOC L2 | |
| 3 | L3₹7.1 L+₹1.5 L (27.0%)Rejected-AOC NULL | L3 | Rejected-AOC L3 | |
| 4 | L4₹7.5 L+₹2.0 L (35.4%)Rejected-AOC NEAR GOVT U P SCHOOL PSARA 10 PADAMUGAL KAKKANAD KOCHI PADAMUGAL | KOCHI | ERNAKULAM | KERALA | 682030 | L4 | Rejected-AOC L4 | |
| 5 | L5₹7.6 L+₹2.1 L (37.2%)Rejected-AOC 2ND FLOOR SREEVALSAM BUILDING NEAR CIVIL STATION EAST FORT ROAD PALAKKAD 678001 | PALAKKAD | PALAKKAD | KERALA | 678001 | L5 | Rejected-AOC L5 |
Tender Value
₹7.4 L
EMD Value
₹18,500
Closing Date
4 Jul 2024, 11:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Office of Executive Engineer,RIQCL,EKM
REBUILD PWD UP gradation of the road strech from Chalissery Thanathara Palam to Pattambi Bridge in Perumbilav Nilambur SH Perumbilav Pattambi Road Investigation works
2024_PWD_677903_1
05/EE/RIQCL/EKM/2024-25
Open Tender
Civil Works - Others
Item Rate
60 days
Pattambi Palakkad District
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,500
Yes
₹18,500
Yes
2 Aug 2024
26 Jun 2024
6 Jul 2024
26 Jun 2024
4 Jul 2024
26 Jun 2024
Amount
Soil Investigation
56.1.a Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring
56.17.1 Providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing.
56.2.a Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring.
56.3.a.1 Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.b.1 Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.4 Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river.
56.5.a Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In land
56.7 Conducting standard penetration test in bore hole at any depth.
56.8 Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
56.11.a Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes
OD58688/2024-2025 Data for inventory survey work of collecting road inventories and recording in prescribed format attached based on chainage marking including marking chainage at 50 m interval and taking details such as existing carriageway width,shoulder width,type of shoulder,width and location of approach road, details of existing drains, culverts and bridges as given in the format attached, pavement conditions(details of potholes,raveling,fog seal,slurry seal edge damage etc)road safety measures (details of road sign, crash barriers,guard stones,delineator post,hazard markers etc)and all other existing retaining structures in road including documentation charges etc as per direction of the officers at site
OD58967/2024-2025 Study of pavement composition by cuttng with core cutting machine at1m from tar edge to get the details of layers (thickness and type) of pavement composition - at one location as suggested by the engineer in charge.Carefullyby cutting pit of size 10cm dia. through over laying bituminious and granular layer including BC,BM,WMM and GSB at tar edge and refilling and compacting the excavated pit to lines and levels with excavated materials as directed by the departmental officers at site and reporting the pavement composition with photographs andmeasurements specifying the type of layers.
Fixing RCC Pillars for Topographical Survey
OD58623/2024-2025 Providing and fixing RCC pillars for DGPS control points of size 300mmx300mm,450mm long, 250mm above ground level and 200mm below GL. casted in M20 Grade concrete reinforced with 4 nos of 8mm dia longitudinal bars and 6mm dia stirrups @ 150mm c/c, firmly fixed in position by means of foundation of size0.5mx0.5mx0.15m in M15 grade concrete below ground level including painting 2coats on exposed surface with synthetic enamel paint
OD58624/2024-2025 Providing and fixing RCC pillars at every 250 m interval along the road, of size150mmx150mm, 450mm long, 250mm above ground level and 200mm below GL. casted in M20 Grade concrete reinforced with 4 nos of 8mm dia longitudinal bars and 6mm dia stirrups @ 150mm c/c, firmly fixed in position by means of foundation of size 0.3mx0.3mx0.15m in M15 grade concrete below ground level including painting 2 coats on exposed surface with synthetic enamel paint
Topographical Survey
OD58620/2024-2025 To carry out DGPS survey to establish primary control points - it includes observationof raw data by using dual constellation GNSS receiver, processing, net work, adjustment and submission of data in WGS 84 datum and UTM/TM projection system including traverse report ( One intervisible pair per 5 Km)
OD58621/2024-2025 To carry out Traverse to establish horizontal control traverse stations on the proposed road stretch running through from one DGPS station at every 2.50 km using electronictotal station instrument at maximum of 250 m interval with an accuracy of 1 in 20000 which includes submission of hard and soft copies as per IRC standards
OD58622/2024-2025 Fly levelling to shift levels from given Bench mark value to next Bench mark station to horizontal traverse station and available permanent structures all along the road for the elevation purpose by closed circuit which includes submission of the hard and soft copies as per IRC Standards
56.12.a Total station surveying and preparation of site plan - Plain and open area withouthindrance to line of sight with 1 m contour intervals , with 5m x 5m interval.
56.13 Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as incase of new road formation, bridge and building sites at in accessible locations).
56.14.a Cross sectional details - River.
56.15.a Hydraulic Velocity Calculation - River
Liju D John
G S Infrastructure
AA AND S CONSTRUCTIONS
Techno VIsionSurveys and Mapping Co PVT LTD
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1054133.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .