| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAdmitted-Fee/PreQual/Technical/Finance | ₹7.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹7.2 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹7.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹7.2 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹8.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹8.2 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | M K ALIAS L1 | THANKACHAN M K L3 | HASSAN MM L4 | MUHAMMED M K L2 |
|---|---|---|---|---|---|---|---|
| 1.00Miscellaneous Mechanical jobs in SA Plant , FACT-CD. | |||||||
| 1.01 | Replacement of PHEs :-
The work involves safe transportation of PHE from CD-stores to SAP , dismantling of existing PHE from position and erection of new PHE with proper supports and gasketing. Any alteration in connecting lines for succesful commisioning of the PHE shall be under the scope of the contractor. | 3 | Nos. | 75,000 ₹75,000 Lowest | 90,000 ₹90,000 | 1,20,000 ₹1,20,000 | 90,000 ₹90,000 |
| 1.02 | Reversing of PHEs :-
The work involves reversing of of existing PHE ( changing of sides) with proper supports and gasketing. Any alteration in connecting lines for succesful lining up of the PHE shall be under the scope of the contractor. | 3 | Nos. | 72,000 ₹72,000 | 48,000 ₹48,000 Lowest | 1,05,000 ₹1,05,000 | 48,000 ₹48,000 Lowest |
| 1.03 | Dummy opening and closing:-
The work involves opening of dummies of manholes of various vessels in SAP and closing with suitable gasket as per instructions of site engineer. Size : upto 600 NB(included). | 20 | Nos. | 40,000 ₹40,000 Lowest | 50,000 ₹50,000 | 40,000 ₹40,000 Lowest | 60,000 ₹60,000 |
| 1.04 | Dummy opening and closing II:-
The work involves opening of dummies of manholes of various vessels in SAP and closing with suitable gasket as per instructions of site engineer. Size : 700- 1800 NB(both sizes included). | 10 | Nos. | 60,000 ₹60,000 | 35,000 ₹35,000 | 30,000 ₹30,000 Lowest | 30,000 ₹30,000 Lowest |
| 1.05 | Valve replacement I: -
The work involves replacement of valves ( welded/flanged) of size upto 150 NB as per instruction of site engineer. Any modification of line requiring fabrication shall be under the scope of the contractor. | 30 | Nos. | 75,000 ₹75,000 | 90,000 ₹90,000 | 30,000 ₹30,000 Lowest | 90,000 ₹90,000 |
| 1.06 | Valve replacement II: -
The work involves replacement of valves( welded/flanged) of size 200- 900 NB ( both sizes included)as per instruction of site engineer. Any modification of line requiring fabrication shall be under the scope of the contractor. | 20 | Nos. | 1,00,000 ₹1,00,000 | 50,000 ₹50,000 Lowest | 1,00,000 ₹1,00,000 | 50,000 ₹50,000 Lowest |
| 1.07 | Leak rectificaton of vessels in Water treatment plant:- After opening the manholes disassemble the internals of vessels in WT plant.After inpection the necessary repairs are to be carried out as per instructions of Site Engineer with the consent of Shift in charge from process department.Collect the required materials from stores.Once the repairs are completed to the satisfaction of process department ,any leaks arising during subsequent leak testing shall be under the contractors scope and shall be carried out without any additional costand clearance for boxing up shall be issued only after rectifying the leaks which will be under the sole discretion of shift in charge from process department. | 5 | Nos. | 1,15,000 ₹1,15,000 | 25,000 ₹25,000 Lowest | 25,000 ₹25,000 Lowest | 25,000 ₹25,000 Lowest |
| 1.08 | Transportation and setting up of Acid drain Pump from Safety Department:- The work involves the transportation of acid drain pump from Fire & Safety department and setting it up for use at the requisite point of Sulphuric acid leak for draining purposes. After draining is over the pump should be transported back to the Safety department. | 12 | Nos. | 36,000 ₹36,000 Lowest | 60,000 ₹60,000 | 1,20,000 ₹1,20,000 | 60,000 ₹60,000 |
| 1.09 | K1 I/O headers and damper valves gland packing:-
The work involves collecting necessary pakcking materila from stores and arranging scaffolding for safe conduct of work, and packing the Inlet and outlet headers of K1 boiler and damper( butterfly) valves in SAP as per the instruction of site engineer with suitable packing material . | 10 | Nos. | 20,000 ₹20,000 Lowest | 35,000 ₹35,000 | 60,000 ₹60,000 | 30,000 ₹30,000 |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
28 Jul 2026, 2:00 pmClosed
NITHIN C S
SM (P and P)-CD
Miscellaneous Mechanical jobs in SA Plant, FACT-CD
2026_FACT_917058_1
4097/2026-2027/E33828
Limited
Miscellaneous Works
Item Rate
365 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD)
4 documents required · 4 mandatory
₹0
₹12,000
Yes
30 Jul 2026
13 Jul 2026
29 Jul 2026
13 Jul 2026
28 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Miscellaneous Mechanical jobs in SA Plant , FACT-CD. | |||||
| 1.01 | Replacement of PHEs :-
The work involves safe transportation of PHE from CD-stores to SAP , dismantling of existing PHE from position and erection of new PHE with proper supports and gasketing. Any alteration in connecting lines for succesful commisioning of the PHE shall be under the scope of the contractor. | 3 | Nos. | - | - |
| 1.02 | Reversing of PHEs :-
The work involves reversing of of existing PHE ( changing of sides) with proper supports and gasketing. Any alteration in connecting lines for succesful lining up of the PHE shall be under the scope of the contractor. | 3 | Nos. | - | - |
| 1.03 | Dummy opening and closing:-
The work involves opening of dummies of manholes of various vessels in SAP and closing with suitable gasket as per instructions of site engineer. Size : upto 600 NB(included). | 20 | Nos. | - | - |
| 1.04 | Dummy opening and closing II:-
The work involves opening of dummies of manholes of various vessels in SAP and closing with suitable gasket as per instructions of site engineer. Size : 700- 1800 NB(both sizes included). | 10 | Nos. | - | - |
| 1.05 | Valve replacement I: -
The work involves replacement of valves ( welded/flanged) of size upto 150 NB as per instruction of site engineer. Any modification of line requiring fabrication shall be under the scope of the contractor. | 30 | Nos. | - | - |
| 1.06 | Valve replacement II: -
The work involves replacement of valves( welded/flanged) of size 200- 900 NB ( both sizes included)as per instruction of site engineer. Any modification of line requiring fabrication shall be under the scope of the contractor. | 20 | Nos. | - | - |
| 1.07 | Leak rectificaton of vessels in Water treatment plant:- After opening the manholes disassemble the internals of vessels in WT plant.After inpection the necessary repairs are to be carried out as per instructions of Site Engineer with the consent of Shift in charge from process department.Collect the required materials from stores.Once the repairs are completed to the satisfaction of process department ,any leaks arising during subsequent leak testing shall be under the contractors scope and shall be carried out without any additional costand clearance for boxing up shall be issued only after rectifying the leaks which will be under the sole discretion of shift in charge from process department. | 5 | Nos. | - | - |
| 1.08 | Transportation and setting up of Acid drain Pump from Safety Department:- The work involves the transportation of acid drain pump from Fire & Safety department and setting it up for use at the requisite point of Sulphuric acid leak for draining purposes. After draining is over the pump should be transported back to the Safety department. | 12 | Nos. | - | - |
| 1.09 | K1 I/O headers and damper valves gland packing:-
The work involves collecting necessary pakcking materila from stores and arranging scaffolding for safe conduct of work, and packing the Inlet and outlet headers of K1 boiler and damper( butterfly) valves in SAP as per the instruction of site engineer with suitable packing material . | 10 | Nos. | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_963734.xls
BOQ • 0.24 MB
Tenderdocuments.pdf
Tender Documents • 1.34 MB
Compliance.pdf
Tender Documents • 0.09 MB
SpecialConditions.pdf
Tender Documents • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].