Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.1 LAccepted-AOC 7 32 1 PRASANTHI NAGAR GOPALAPATNAM VISAKHAPATNAM 530 027 | VISAKHAPATANAM | ANDHRA PRADESH | 530027 | L1 | Accepted-AOC Lowest Tender | |
| 2 | L2₹31.9 L+₹1.7 L (5.74%)Rejected-Finance 21 167 KAKANI NAGAR 2ND LANE NAD POST VISAKHAPATNAM 530009 | VISAKHAPATANAM | ANDHRA PRADESH | 530009 | L2 | Rejected-Finance NOT LOWEST | |
| 3 | L3₹31.9 L+₹1.8 L (5.84%)Rejected-Finance D NO 44 38 12 23 4 AVS PARADISE SRINIVASA NAGAR AKKAYYAPALEM POST VISAKHAPATNAM 530 016 | VISAKHAPATANAM | ANDHRA PRADESH | 530016 | L3 | Rejected-Finance NOT LOWEST | |
| 4 | L4₹32.6 L+₹2.4 L (8.11%)Rejected-Finance | L4 | Rejected-Finance NOT LOWEST | |
| 5 | L5₹32.8 L+₹2.7 L (8.83%)Rejected-Finance 66 6 410 1 MULAGANDA HOUSING COLONY GAJUWAKA DEPOT VISAKHAPATNAM 530026 | VISAKHAPATANAM | ANDHRA PRADESH | 530026 | L5 | Rejected-Finance NOT LOWEST |
Tender Value
₹49.5 L
EMD Value
₹99,000
Closing Date
28 Apr 2021, 6:00 pmClosed
Garrison Engineer Utility-II
Garrison Engineer Utility-II 104 Area Industrial Estate Post Visakhapatnam -530 007
MANNING AND OPERATION OF NEW FIRE FIGHTING PUMP HOUSES AT OLD MO V AND REPAIR REPLACEMENT MAINTENANCE OF FIRE FIGHTING DISTRIBUTION LINES, HYDRANTS VALVES, PIPELINES AND OTHER MISC E/M WORKS AT OLD MO V UNDER AGE E/M NO.II OF GE (U-II) VISAKHAPATANA
2021_MES_424507_1
8755
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
Garrison Engineer Utility-II Visakhapatnam
CLASS D
8 documents required · 8 mandatory
₹500
Garrison Engineer Utility-II
₹99,000
Yes
13 May 2021
7 Apr 2021
29 Apr 2021
7 Apr 2021
28 Apr 2021
23 Apr 2021
Amount
Manning, Operation and maintenance to Heavy Lift store Fire Pump House along with DG set at MO(V) old site One semi-skilled operator and one Un-skilled per shift of 08 hrs round the clock in three shifts per day including Sundays and holidays complete all as specified and directed by Engineer-in-charge. Man power: One semi-skilled operator and one Un-skilled per shift of 08 hrs. Shift Timings Ist shift: 06.00 to 14.00 IInd Shift:- 14.00 to 22.00 IIIrd Shift: 22.00 to 06.00
List of Plants to be operated are as under:- a) Fire (centrifugal) pump electric driven 2280 LPM, 70m head 01 No b) Jockey pump 180 LPM, 70m head 01 No c) Booster pump, 450 LPM, 36m head - 01 No. d) Fire (centrifugal) pump diesel driven 2280 LPM, 70m head - 01 No e) 100 KVA DG Set - 01 No.
NOTE:- The quoted rate is deemed to inclusive of (a) Maintence and operating the Sluice / Gate / Hydrant valves of fresh water and hydrant valves of heavy lift storage area, MO(V) old site round the clock complete all as specified and directed by Engineer-in-Charge. (b) Trouble free sluice / gate valve operating and distribution of regular drinking water supply to the MO(V) old area complete.
Manning, Operation & maintenance including attending to minor defects for smooth operation and keeping an hourly record of plant and inside room temperatures complete to central AC Plants at TRS-I and TRS-II at NAD with One Skilled operator per shift of 8 hrs round the clock in three shifts per day including sundays and holidays complete all as specified and directed by Engineer-in-charge Man power:- One Skilled operator per shift of 08 hrs List of equipments:- [a] 3x110TR AC Plant(Voltas Model No. EGWFXR1201MLB2) [b] Cooling Tower, Pump connected pumps & pipes complete [c] AHUs along with ducting connections complete [d] LT Electrical Panel - 01 No
Manning, Operation, maintenance of Fire Fighting Pump House (Store House Bldg) at MO (V) Old Site, consisting of connected pipe line, valves and various size of MS / DI / GI pipe line network for smooth operation One Semi- skilled operator per shift of 8 hours round the clock in three shifts per day including sundays and holidays complete all as specified and directed by Engineer-in-charge Man power:- One Semi - skilled operator per shift of 08 hrs List of equipments:- [a] Fire main Pumpset - 01 Nos [b] DD Pumpset - 01 Nos [c] Jockey Pumpset - 01 Nos [d] Control Panels / Starter Panel - 01 No Note : Manning Covered under Sl No - 03 of BOQ shall commence from 01 Jul 2021.
Manning, Operation and maintenance of Dega Vihar Pump House, including incoming water pipe line with connected valves, various size of CI / MS / DI / GI distribution pipelines network for smooth operation, One Semi-skilled operator per shift of 8 hours round the clock in three shifts per day including sundays and holidays complete all as specified and directed by Engr-in-Charge. Man power:- One Semi-skilled operator per shift of 08 hrs List of equipments:- [a] 12.5 HP Pumpsets - 02 Nos [b] 30 KVA DG Set - 01 No [c] Starter Panel/Change over Swtich - 01 No [d] APFC Panel - 01 No Note : Manning Covered under Sl No - 04 of BOQ shall commence from 18 Jul 2021.
Note for item No.1 to 4:- (i) Cleaning the sorroundings the Pump house and replacing gland packing, greasing periodicaly for smooth functioning of the plants, keeping daily record of plant running hrs all as specified and directed by Engr-in-Charge is contractor's responsilbility. The rate quoted deemed to be inclusive of the following:- (a) Keeping neat and clean of complete installation area by grass cutting and removing the debris in & around premises upto 1.5 m from installation Bldg. (b) Keeping daily record of DG set / pump set / AC Plant running hours all as specified and directed. (c) Carrying out 'A' check of DG set daily as per Manufacturer's manual. (d) Replacing of distilled water/battery electrolyte and charging of batteries of DG sets as and when required.
(e) The installation will be handed over in operating staff on the commencement of contract through work order. (f) The quoted rate is also inclusive of maintanining log sheets and uniform of duty persons. (g) The operator shall ensure by trial run and be alert to run the DG Set within 5 minutes of supply failure. (h) Diesel shall be issued by Department as and when required. Contractor shall have to intimate minimum 03 days in advance for issue of diesel. (j) The quoted rate is inclusive collecting and transportation of diesel from AGE E/M store yard to work site. (k) Before commencement of work the contractor shall submit the list of manpower to be employed as per requisite qualifications specified in particular specification for approval of GE duly recommended by Engr-in-Charge.
Jungle / Area Cleaning by using JCB / BOBCAT for removing bushes / thick vegetation around the pump house, installations, along the pipelines to find out the leakages, levelling the area without damaging the pipelines / Cable network / Pedestals of pipelines / buildings including disposal of the vegetation / debris material up to a distance not exceeding 50 m complete all as specified and directed by Engineer-in-Charge.
Material and labour for taking down leaking Sluice valves from the position for servicing like removing sludge / scales from the gate disk, spindle, stuffing box, replacing pins, nuts & bolts washers as required on site, replacing gland packing and arresting leakages complete with painting with one coat of red oxide along with black enamel paint and changing of rubber gaskets complete with renewal of necessary bolts, nuts, washers complete all as specified for 200 / 150 mm dia size of Sluice Valves.
All as per item No 6 of above but for 100 / 80 mm dia size of Sluice Valves.
Repair/ maintenance of fire hose box by changing of damaged doors along with locking arrangements, front glass of existing size, PCC foundation and necessary rubber gaskets for doors complete all as directed by Engineer-in-Charge. (Note:- Quoted rates are inclusive of one coat red-oxide paint, paint red and inside clean white paint)
M & L for Coolant (Corrosion Inhibitors) for DD Pump /DG sets all as directed and specified by Engr-In-Charge Make : SERVO / VEEDOL
M & L Preparation of old painted steel surfaces of any description, over 10 cm width or girth, not otherwise described and applying one coat of synthetic enamel paint. complete all as specified and as directed.
Supply and replace defective / unserviceable "Fire Hydrant Blanking Cap of PVC for closing the fire hydrant valves of 63/80 mm dia complete along with chain all as specified and directed by Engineer - in - Charge.
Supply and replace defective / unserviceable "Fire Hydrant Female Coupling Washers of both ends" suitable of 63 mm dia complete all as specified and directed by Engineer - in - Charge.
Supply and replace defective / unserviceable "Fire Hydrant Hand Wheel" for closing the fire hydrant valves of 63/80 mm dia complete all as specified and directed by Engineer - in - Charge.
M&L in repairs Synthetic mat (rubber matting) suitable for 11000 Volts electrical grade 2mx1mx19mm thick chequered top, ISI marked to be laid in front of LT panel board complete all as specified and directed.
SVG SUPPLIES
CHAITANYA CONSTRUCTIONS
GANGA SURAJ ENTERPRISES
GVR CONSTRUCTIONS
SUPREET CONSTRUCTIONS
SRIESWARI ENTERPRISES
Sri Surya Enterprises
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .