Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84,543.09Accepted-AOC | L1 | Accepted-AOC Accepted Vide Resolution No.3/1 dt 06/03/2026 of Mannur GP | |
| 2 | L2₹84,543.09Same as L1Rejected-AOC | L2 | Rejected-AOC Higher rate and hence not admitted | |
| 3 | L3₹88,770.24+₹4,227.15 (5.00%)Rejected-AOC KERALA KL | L3 | Rejected-AOC Higher rate and hence not admitted | |
| 4 | L4₹88,770.24+₹4,227.15 (5.00%)Rejected-AOC ACHARATH HOUSE KALLADIKODE | L4 | Rejected-AOC Higher rate and hence not admitted |
Tender Value
₹84,543
EMD Value
₹2,114
Closing Date
26 Feb 2026, 11:00 amClosed
Muhsin Munawar P K
Office of the Assistant Engineer, LID and EW Section, Mannur Grama Panchayat
Annual Plan-Mannur GP 2025-26 Mannur Akkathodi Canal Bridge Handrail Construction-(Pr no. 279) (Ward 10) in Mannur gp-General Civil Work
2026_LSGD_836146_1
ET-04/2025-26/AE/LSGD/MNR
Open Tender
Civil Works - Bridges
Item Rate
Mannur Grama Panchayath
Please refer Tender documents.
10 documents required · 10 mandatory
₹555
Yes
₹2,114
Yes
22 May 2026
19 Feb 2026
4 Mar 2026
19 Feb 2026
26 Feb 2026
19 Feb 2026
Hand Rail
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1408379.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_1408379.xls
BOQ • 0.31 MB
viewsbd.pdf
Tender Documents • 1.74 MB
viewnit.pdf
Tender Documents • 0.03 MB
corrigendu.pdf
PDF • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .