Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
1 Sept 2026, 5:00 pm
Circle Officer
RURAL WORKS CIRCLE , SAMBALPUR
Construction of Sub-Registrar Office Building at Ambabhona of Ambabhona Tahasil in the District of Bargarh Ex-officio SR Office
2026_CERWI_139081_1
ONLINE-RWCSBP-18/2026-27
Open Tender
Civil Works - Buildings
Percentage
365 days
Bargarh
2 documents required · 2 mandatory
₹10,000
₹1.2 L
Yes
18 Aug 2026
18 Aug 2026
2 Sept 2026
18 Aug 2026
1 Sept 2026
18 Aug 2026
18 Aug 2026 - 28 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation for foundation of in hard soil including dressing and leveling the bed fit for laying concrete and deposited the excavated materials away from work site etc complete. | 580.71 | cum | 282.9 | ₹1,64,282.86 |
| 2 | Filling Foundation & Plinth with sand watered and rammed including cost of sand, conveyance of material, labour, T & P etc. complete. | 534.87 | cum | 853.05 | ₹4,56,270.85 |
| 3 | Cement concrete (1:3:6) using 40mm and down gradedhard granite crusher broken metal including all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in - charge. | 168.41 | cum | 7,679.95 | ₹12,93,380.38 |
| 4 | Cement concrete (1:2:4) using 12mm hard granite crusher broken metal including all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in - charge. | 15.56 | cum | 9,285.45 | ₹1,44,481.6 |
| 5 | R.C.C work with R.C.C M-25 using 20mm downgraded size hard granite chips of approved quality from approved quarry having a minimum comprresive strength (in work test) 25 kg/Cm2 in 15 cm cubes at 28 days after mixing and test conducted including hoisting,lowering laying and compacting concrete by using vibrator with watering and curing for 28 days centering and shuttering and finishing the exposed surface smooth providing grooves or beds whereever necessay including cost conveyance,royalties and all taxes of all materials and cost of all labour with T&P required for the work etc.complete in all respect but excluding cost of M.S.Rods or Tor Steel and binding wires and labour charge for bending binding and tying the grills etc.complete in all respect as per direction of Engineer-in-charge.Column Base- | 34.08 | cum | 9,385.46 | ₹3,19,856.48 |
| 6 | R.C.C work with R.C.C M-25 using 20mm downgraded size hard granite chips of approved quality from approved quarry having a minimum comprresive strength (in work test) 25 kg/Cm2 in 15 cm cubes at 28 days after mixing and test conducted including hoisting,lowering laying and compacting concrete by using vibrator with watering and curing for 28 days centering and shuttering and finishing the exposed surface smooth providing grooves or beds whereever necessay including cost conveyance,royalties and all taxes of all materials and cost of all labour with T&P required for the work etc.complete in all respect but excluding cost of M.S.Rods or Tor Steel and binding wires and labour charge for bending binding and tying the grills etc.complete in all respect as per direction of Engineer-in-charge. Column and Beam- | 38.69 | cum | 20,328.96 | ₹7,86,527.46 |
| 7 | R.C.C work with R.C.C M-25 using 20mm downgraded size hard granite chips of approved quality from approved quarry having a minimum comprresive strength (in work test) 25 kg/Cm2 in 15 cm cubes at 28 days after mixing and test conducted including hoisting,lowering laying and compacting concrete by using vibrator with watering and curing for 28 days centering and shuttering and finishing the exposed surface smooth providing grooves or beds whereever necessay including cost conveyance,royalties and all taxes of all materials and cost of all labour with T&P required for the work etc.complete in all respect but excluding cost of M.S.Rods or Tor Steel and binding wires and labour charge for bending binding and tying the grills etc.complete in all respect as per direction of Engineer-in-charge. Plinth Band- | 16.22 | cum | 9,385.46 | ₹1,52,232.16 |
| 8 | R.C.C work with R.C.C M-25 using 20mm downgraded size hard granite chips of approved quality from approved quarry having a minimum comprresive strength (in work test) 25 kg/Cm2 in 15 cm cubes at 28 days after mixing and test conducted including hoisting,lowering laying and compacting concrete by using vibrator with watering and curing for 28 days centering and shuttering and finishing the exposed surface smooth providing grooves or beds whereever necessay including cost conveyance,royalties and all taxes of all materials and cost of all labour with T&P required for the work etc.complete in all respect but excluding cost of M.S.Rods or Tor Steel and binding wires and labour charge for bending binding and tying the grills etc.complete in all respect as per direction of Engineer-in-charge. Lintel- | 4.9 | cum | 16,263.96 | ₹79,693.4 |
| 9 | R.C.C work with R.C.C M-25 using 20mm downgraded size hard granite chips of approved quality from approved quarry having a minimum comprresive strength (in work test) 25 kg/Cm2 in 15 cm cubes at 28 days after mixing and test conducted including hoisting,lowering laying and compacting concrete by using vibrator with watering and curing for 28 days centering and shuttering and finishing the exposed surface smooth providing grooves or beds whereever necessay including cost conveyance,royalties and all taxes of all materials and cost of all labour with T&P required for the work etc.complete in all respect but excluding cost of M.S.Rods or Tor Steel and binding wires and labour charge for bending binding and tying the grills etc.complete in all respect as per direction of Engineer-in-charge. Chajja- | 20.46 | sqm | 1,374.35 | ₹28,119.2 |
| 10 | R.C.C work with R.C.C M-25 using 20mm downgraded size hard granite chips of approved quality from approved quarry having a minimum comprresive strength (in work test) 25 kg/Cm2 in 15 cm cubes at 28 days after mixing and test conducted including hoisting,lowering laying and compacting concrete by using vibrator with watering and curing for 28 days centering and shuttering and finishing the exposed surface smooth providing grooves or beds whereever necessay including cost conveyance,royalties and all taxes of all materials and cost of all labour with T&P required for the work etc.complete in all respect but excluding cost of M.S.Rods or Tor Steel and binding wires and labour charge for bending binding and tying the grills etc.complete in all respect as per direction of Engineer-in-charge. Shelves | 9.72 | sqm | 1,288.48 | ₹12,524.03 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 5.44 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_606551.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].