Executive Engineer, Rajkot Irrigation Division, Rajkot.
VENU-II IRRIGATION SCHEME. Rehabilitation and treatment of Non Overflow Section over water as suggested by DSRP-1 for Venu-II Irrigation Scheme
304691
SBD-05 of 2026-27
Open
Civil - All
Rajkot
5 documents required · 5 mandatory
₹1,500
Executive Engineer, Rajkot Irrigation Division Rajkot
₹49,000
12 May 2026
12 May 2026
12 May 2026
22 May 2026
12 May 2026
NAME OF WORK :-
Rehabilitation and treatment of Non Overflow Section over water as suggested by DSRP-1 for Venu-II Irrigation Scheme.
BILL OF QUANTITIES (SCHEDULE - B)
(A) Percentage Rate Tender (Upto Rs. 50 Crore)
Item Description of Item Quantity Unit Estimated Rate Amount
No. (with brief specification and reference to book of specifications) In Figure In words
1 Providing and carrying out repointing of masonry joints for spillway or other hydraulic 367.00 Sqm. 2624.91 Rupees: Two
structures using high-performance cementitious mortar conforming to EN 1504-3 Class R4, Thousand Six
crystalline technology based or polymer-modified, high strength, non-shrink, impermeable Hundred Twenty
and chemically resistant, having compressive strength not less than 45 MPa and bond Four & Ps. Ninty
strength not less than 2 MPa, including inspection of exposed surface by hammer One Only.
sounding/tapping to identify unsound and deteriorated joints; raking out/removal of existing
mortar from joints to a minimum depth of 20–25 mm or till sound substrate (whichever is
more) by approved manual/mechanical means without damaging adjacent masonry;
removal of loose debris and thorough cleaning of joints and surrounding surface by high-
pressure water jetting to remove dust, laitance, algae and other deleterious materials; pre-
wetting of joints to saturated surface dry (SSD) condition prior to application; application of
suitable bonding coat of water-miscible epoxy (if recommended by manufacturer) to
enhance adhesion; and repointing the joints with high-performance cementitious mortar
conforming to EN 1504-3 Class R4 grade in raised/flush finish, tightly packed in layers to
avoid voids, properly compacted and finished true to line and profile as per specifications;
including curing for minimum 7 days or as per manufacturer’s recommendations; complete
with all materials, labour, tools and plants, scaffolding, equipment, transportation with all
leads and lifts, and all incidental charges as directed by the Engineer-in-Charge.
Item Description of Item Quantity Unit Estimated Rate Amount
No. (with brief specification and reference to book of specifications) In Figure In words
2 Providing and laying high-performance cementitious mortar (Based on EN 1504-3 Class 367.00 Sqm. 10640.56 Rupees: Ten
R4) for structural repair of concrete spillway or other hydraulic structures. The mortar shall Thousand Six
be crystalline technology based or polymer modified, high strength, non-shrink, Hundred Forty &
impermeable, highly abrasion resistant and chemically resistant, having compressive Ps. Fifty Six
strength ≥ 45 MPa and adhesive bond strength ≥ 2 MPa. The work shall include removal Only.
of damaged, loose, cracked, delaminated and unsound concrete/masonry/mortar by
chiseling, cutting or other approved manual/mechanical methods to the required depth as
directed by the Engineer-in-Charge. Cleaning of lift joints, honeycombed areas and
potholes shall be carried out by breaking and trimming the edges. The prepared surface
shall be thoroughly cleaned using high-pressure water jetting at suitable pressure to
remove loose particles, laitance, organic matter, algae, fungi, marine growth and other
impurities to obtain a sound substrate suitable for repair. After surface preparation, a
bonding coat of special water-miscible epoxy primer suitable for bonding old
surface/concrete with new mortar shall be applied uniformly to achieve the required bond
strength. Subsequently, cementitious repair mortar (Based on EN 1504-3 Class R4) of
thickness 12 mm shall be applied, compacted and finished properly including filling of
potholes, honeycombed areas and irregularities as per manufacturer’s specifications and
directions of the Engineer-in-Charge. After completion of curing of the repair mortar, a
compatible crystalline/polymer protective coating of the same approved system shall be
applied over the repaired surface to provide additional waterproofing, durability and
protection against abrasion and chemical attack. The item shall include all materials,
labour, machinery, scaffolding, tools and plants, hire charges of equipments/cranes,
transportation with all leads and lifts, insurance and all incidental charges necessary to
complete the work.
Rupees: Forty Eight Lac Sixty Eight Thousand Four Hundred Twenty Seven & Ps. Forty Nine Only.
I/We are willing to carry out the work at …………………………………………………………...% above/below percent (should be written in figure and words) of the
estimated rates mentioned above. The amount of my/our tender works out as under;
*Estimated amount put to tender Rs. ……………… *Estimated amount put to tender Rs. ………………
Deduct : ……… % below Rs. ………………. Add : ……… % above Rs. ……………….
Net : Rs. ……………… Total : Rs. ………………
In words : Rupees ………………………………………………………………………… In words : Rupees………………………………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as
stated in S.O.R.thereforeinR.C.C.items where there is a change as per actual mix design the cost of difference of cement consumption have been deducted from the
rate of original item at the rate of input rate mentioned in all the tender.
Executive Engineer
Signature of contractor. Rajkot Irrigation Division
Item Description of Item Quantity Unit Estimated Rate Amount
No. (with brief specification and reference to book of specifications) In Figure In words
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 Tender P 1 to 14.pdf
2- SBD Nof- Venu-II P 1 to 145.pdf
3 Sch B - Nof - Venu-II P 146 to 147.pdf
Download all tender documents and submit your bid