Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.8 LAdmitted-Finance | ₹43.8 L | L1 | Admitted-Finance |
| 2 | L2₹46.3 L+₹2.5 L (5.75%)Admitted-Finance | ₹46.3 L+₹2.5 L (5.75%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | akbar L1 | Daybro constructions L2 |
|---|---|---|---|---|---|
| 1.00Civil Works | |||||
| 1.00 | 2.31
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and
saplings of girth up to 30 cm measured at a height of 1 m above ground level and
removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 183.6 | sqm | 18.19 ₹3,339.68 Lowest | 18.19 ₹3,339.68 Lowest |
| 1.00 | 2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5
m, as directed by Engineer-in-charge.All kinds of soil | 64.25 | cum | 257.63 ₹16,551.44 Lowest | 357.8 ₹22,986.86 |
| 1.00 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means
in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),
including dressing of sides and ramming of bottoms, lift up to 1.5 m, including
getting out the excavated soil and disposal of surplus excavated soil as directed,
within a lead of 50 m.All kinds of soil | 2.82 | cum | 359.72 ₹1,014.05 Lowest | 459.3 ₹1,294.77 |
| 1.00 | 16.78.1
Construction of granular sub- base by Providing close graded Material conforming to
specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material
by tippers to work site, for all leads & lifts, spreading in uniform layers of specified
thickness with motor grader on prepared surface and compacting with vibratory
power roller to achieve the desired density, complete as per specifications and
directions of Engineer-in- Charge.With Material conforming to Grade - I ( size range
75 mm to 0.075 mm) having CBR Value- 30 | 5.46 | cum | 3,333.28 ₹18,186.38 Lowest | 3,800.6 ₹20,736.07 |
| 1.00 | 4.1.8
Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4
coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm
nominal size derived from natural sources) | 16.35 | cum | 7,932.89 ₹1,29,671.02 Lowest | 9,500.3 ₹1,55,291.9 |
| 1.01 | 4.1.4
Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2
coarse sand (zone-III) derived from natural sources : 4 graded
stone aggregate 40 mm nominal size derived from natural sources) | 1.7 | cum | 9,062.66 ₹15,442.77 Lowest | 9,062.66 ₹15,442.77 Lowest |
| 1.01 | 5.1.2
Providing and laying in position specified grade of reinforced cement concrete,
excluding the cost of centering, shuttering, finishing and reinforcement - All work up
to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm
nominal size derived from natural sources) | 16.52 | cum | 10,488.77 ₹1,73,263.99 Lowest | 12,600.3 ₹2,08,144.36 |
| 1.01 | 51.2.3
Filling with Quarry Muck Filling up low lying and water logged areas with local
material/ quarry muck, spreading in layers, leveling the top at site and consolidation
by ramming, etc complete for improving the CBR value of subgrade | 14.39 | cum | 909.57 ₹13,090.53 Lowest | 909.57 ₹13,090.53 Lowest |
| 1.01 | 2.25
Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited
layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 67.06 | cum | 318.47 ₹21,357.87 Lowest | 418.6 ₹28,072.99 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
4 Nov 2025, 5:55 pmClosed
ENGINEER (PROJECTS)
KEL MAMALA KOCHI
National Health Mission- Construction of New Building for SC Cheramanparambu, Thrissur District
2025_KEL_816303_1
KRO/BDC/2203/2025
Open Tender
Civil Works - Buildings
Item Rate
KEL MAMALA
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,950
₹50,000
Yes
6 Nov 2025
28 Oct 2025
5 Nov 2025
28 Oct 2025
4 Nov 2025
28 Oct 2025
28 Oct 2025 - 4 Nov 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_1367200.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .