Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAccepted-AOC 4 R G BARUAH ROAD SUNDARPUR GUWAHATI KAMRUP ASSAM 781005 | KAMRUP METRO | ASSAM | 781005 | L1 | Accepted-AOC L1 Bidder | |
| 2 | Rejected-Technical 0 BETTER POWER SERVICES PVT LTD A K AZAD ROAD REHABARI KAMRUP ASSAM 781008 | KAMRUP METRO | ASSAM | 781008 | - | Rejected-Technical UPS technical manuals are not as per specified make model and part no of SOQ, Communication interface of the UPS is not as per technical specifications | |
| 3 | Rejected-Technical KARNATAKA | RAICHUR | KARNATAKA | 584123 | - | Rejected-Technical No reply received regarding short fall | |
| 4 | Not Admitted-Fee/PreQual/Technical 61 62 6TH FLOOR 61 62 6TH FLOOR KALPATARU SQUARE KONDIVITA ROAD OFF ANDHERI KURLA ROAD ANDHERI EAST MUMBAI MAHARASHTRA 400059 MUMBAI MAHARASHTRA 400059 | MUMBAI SUBURBAN | MAHARASHTRA | 400059 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical 3RD FLOOR SIKKIM COMMERCE HOUSE 4 1 MIDDLETON STREET WEST BENGAL KOLKATA WEST BENGAL 700071 | KOLKATA | WEST BENGAL | 700071 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹57,672
Closing Date
10 Sept 2020, 3:00 pmClosed
DGM (CNS)
DGM (CNS), MBB Airport, Agartala
Supply Installation Testing and Commissioning of UPS for Equipment Room, Nav-Aids and Automation System
2020_AAI_55742_1
NM-11013(31)/8/2019-APD-NER- AGARTALA
Open Tender
Electrical Works
Item Rate
42 days
MBB Airport, Agartala
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,180
Airports Authority of India
₹57,672
15 Oct 2020
21 Aug 2020
11 Sept 2020
21 Aug 2020
10 Sept 2020
21 Aug 2020
21 Aug 2020 - 10 Sept 2020
Amount
10 KVA online UPSin Parallel load sharingConfiguration.
Battery bank with rack for backup up to 30 minutes or more on full load. (along with warranty for 2 years)
10 KVA online UPSin Main/StandbyConfiguration.
Battery bank with rack, for backup up to 30 minutes or more on full load. (along with warranty for 2 years)
5 KVA online UPSin Parallel load sharingConfiguration.
Battery bank with rack, for backup up to 30 minutes or more on full load. (along with warranty for 2 years)
Installation Testing & Commissioning
Status of UPS at Equipment Room via Ethernet connection
PC Based Software for monitoring of UPS
Maintenance Training
Warranty of all UPS for 3 years
CAMC of all UPS for 3 years after warranty
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .