| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC | ₹4.6 L | L1 | Accepted-AOC Low quated |
| 2 | L2₹4.7 L+₹6,355 (1.38%)Rejected-Finance MADAARI HOUSE CHERUPPA P O 673661 | CHERUPPA | KOZHIKODE | KERALA | 673661 | ₹4.7 L+₹6,355 (1.38%) | L2 | Rejected-Finance High |
| Sl No | Description | Qty | Unit | MUBASHIR M L2 | K BASHEER L1 |
|---|---|---|---|---|---|
| 1.00APPENDIX-B: Premonsoon Works | |||||
| 1.00 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | 3.55 | Hectare | 55,129.65 ₹1,95,765.39 | 54,377.88 ₹1,93,095.85 Lowest |
| 1.00 | OD42380/2026-2027:Lifting the precast RCC covering slab from drain for removal of silt and placing the same slab in position after cleaning | 20 | each | 217.75 ₹4,355 | 214.78 ₹4,295.6 Lowest |
| 1.00 | OD42388/2026-2027:Earth work excavation in all classes of soil including removal of garbage ,old plastic bags,and other debris from the chalked culverts, drains and from the berm of the road conveying the deposit of soil and garbage anywhere within 5 km from the site including all labour charge ,hire charge of lorry loading, unloading etc. complete | 353.55 | cum | 385.74 ₹1,36,378.38 | 380.48 ₹1,34,518.7 Lowest |
| 1.00 | OD42389/2026-2027:
Engaging Mazdoor for various works | 25 | each | 1,139.05 ₹28,476.25 | 1,123.52 ₹28,088 Lowest |
| 1.00 | OD42390/2026-2027:Engaging woodcutter with tools and accessories required for cutting trees / branches of trees of any girth overhanging above any structures including stacking of serviceable materials and disposal of unserviceable materials without making any damages to nearby structures etc. complete | 10 | each | 1,260.91 ₹12,609.1 | 1,243.71 ₹12,437.1 Lowest |
| 1.01 | 3.24.A:Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres) | 120 | metre | 87.37 ₹10,484.4 | 86.18 ₹10,341.6 Lowest |
| 1.01 | OD42386/2026-2027: filling up potholes with bituminous ready mix compound(25 kg) and compacting by ramming to get a compact surface including of cost of materials laying charges transportation to site etc complete rate is arrived for a bag of 25kg(Assuming average of 30 bag of 25kg ready mix will be laid in pothole in a day) | 35 | each | 812.42 ₹28,434.7 | 801.34 ₹28,046.9 Lowest |
| 1.01 | 10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor | 290 | sqm | 31.17 ₹9,039.3 | 30.75 ₹8,917.5 Lowest |
| 1.01 | OD42381/2026-2027:Engaging hydraulic excavator cum dozer for removal of soil on the berm of the road and clearing the drainage and culverts etc. | 8 | hour | 1,746.27 ₹13,970.16 | 1,722.46 ₹13,779.68 Lowest |
Tender Value
₹4.2 L
EMD Value
₹10,593
Closing Date
29 Jun 2026, 3:00 pmClosed
Assistant Executive Engineer PWD Roads Sub Divisio
PWD Roads Sub Division,Koduvally
GENERAL-Pre monsoon works - 2026-Clearing light jungle, chocked drains and culverts, cutting dangerously standing and fallen trees, removal of earth slips in various roads under Roads section, Koduvally
2026_PWD_857015_1
PWD/RB/TR/8744/2026_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
koduvally
Please refer Tender documents.
8 documents required · 8 mandatory
₹935
Yes
₹10,593
Yes
29 Jul 2026
22 Jun 2026
1 Jul 2026
22 Jun 2026
29 Jun 2026
22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1APPENDIX-B: Premonsoon Works | |||||
| 1.001 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | - | Hectare | - | - |
| 1.002 | OD42380/2026-2027:Lifting the precast RCC covering slab from drain for removal of silt and placing the same slab in position after cleaning | - | each | - | - |
| 1.003 | OD42388/2026-2027:Earth work excavation in all classes of soil including removal of garbage ,old plastic bags,and other debris from the chalked culverts, drains and from the berm of the road conveying the deposit of soil and garbage anywhere within 5 km from the site including all labour charge ,hire charge of lorry loading, unloading etc. complete | - | cum | - | - |
| 1.004 | OD42389/2026-2027:
Engaging Mazdoor for various works | - | each | - | - |
| 1.005 | OD42390/2026-2027:Engaging woodcutter with tools and accessories required for cutting trees / branches of trees of any girth overhanging above any structures including stacking of serviceable materials and disposal of unserviceable materials without making any damages to nearby structures etc. complete | - | each | - | - |
| 1.006 | 3.24.A:Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres) | - | metre | - | - |
| 1.007 | OD42386/2026-2027: filling up potholes with bituminous ready mix compound(25 kg) and compacting by ramming to get a compact surface including of cost of materials laying charges transportation to site etc complete rate is arrived for a bag of 25kg(Assuming average of 30 bag of 25kg ready mix will be laid in pothole in a day) | - | each | - | - |
| 1.008 | 10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor | - | sqm | - | - |
| 1.009 | OD42381/2026-2027:Engaging hydraulic excavator cum dozer for removal of soil on the berm of the road and clearing the drainage and culverts etc. | - | hour | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1448670.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.63 MB
BOQ_1448670.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .