Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAccepted-Finance | ₹6.5 L | L1 | Accepted-Finance L1 |
| 2 | L2₹7.1 LRejected-Finance | ₹7.1 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | ASBAQ CONSTRUCTIONS L2 | RAJESH ALIAS SAGUN S NAIK L1 |
|---|---|---|---|---|---|
| 1.00 | Clearing and cutting,removal of wooden logs,trees and branches stuck to the bandharas,obstructing the normal flow of water. | 108 | Nos | 500 ₹54,000 | 433.36 ₹46,802.88 |
| 2.00 | Earthwork in excavation by desilting of river , nallahs ponds ,etc. by mechanical means in all type of strata comprising any of materials such as soil ,sand, clay, gravels, moorum of all varieties, shingles, pebbles all types of conglomerated laterite rock, soft rock ,ordinary rock, disintegrated rock , fissured/shattered, decomposed rock and all such other materials either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted including chiseling, wedging etc but blasting prohibited in all condition such as dry , moist , saturated, submerged foul condition etc. including setting out construction of shoring, strutting removal of stamp and other | 880 | Cum | 200 ₹1.8 L | 149.18 ₹1.3 L |
| 3.00 | Fixing of bandhara gates after monsoon including tranporting the same from Godown/shed upto bandhara site, including loading, unloading with all leads and lifts etc. Sealing of the gates with plastic sheet (as the case may be)to make in water proof including cost towards all consumables if any complete and as directed by Engineer in charge. a)Fiber reinforced plastic (FRP) Gates | 615 | Nos | 250 ₹1.5 L | 235.52 ₹1.4 L |
| 3.10 | b) Kolhapur type (KT)Gates | 60 | Nos | 450 ₹27,000 | 421.11 ₹25,266.60 |
| 4.00 | Providing Polythene sheets on upstream side of bandhara gates to prevent leakages through the joints. | 480 | RM | 80 ₹38,400 | 75.36 ₹36,172.80 |
| 5.00 | Transportation of wooden planks from godown to bandhara site during closing operation and from bandhara site to godown after removal with an average lead of 20kms by mechanical transport including loading unloading and stacking etc complete. | 0.9 | Trip | 650 ₹585 | 643.5 ₹579.15 |
| 6.00 | Engaging labours for closing the bandhra by placing the wooden planks in proper position, laying polythene sheet and filling the moorum in between wooden planks which includes manual loading and unloading. | 40 | Nos | 430 ₹17,200 | 433.36 ₹17,334.40 |
| 7.00 | Supplying and filling in plinth under floors, trenches including watering ramming consolidating,dressing, complete. | 4 | Cum | 650 ₹2,600 | 623.67 ₹2,494.68 |
| 8.00 | Removal of bandharas gates before onset of monsoon and transporting the same upto godown/shed, including loading, uploading and stacking with all leads and lifts etc. Complete and as directed by Engineer in charge. a)Fiber reinforced plastic (FRP) Gates | 615 | Nos | 102 ₹62,730 | 118.7 ₹73,000.50 |
| 8.10 | b) Kolhapur type (KT) Gates | 60 | Nos | 230 ₹13,800 | 237.4 ₹14,244 |
Tender Value
₹6.9 L
EMD Value
₹13,878
Closing Date
4 Feb 2026, 4:00 pmClosed
EE XI, WRD
Ravonfond, Navelim
Closing and Opening bandhara by fixing of FRP needles and wooden planks to the existing open type bandhara across Talpona river under the jurisdiction of SD II,WDXI,WRD,Canacona for the year 2025-26
2026_WRD_27435_1
WDXI/PB/F.24/2025-26/1408Sr3
Open Tender
Miscellaneous Works
180 days
Ravonfond, Navelim
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹13,878
5 Jun 2026
23 Jan 2026
6 Feb 2026
23 Jan 2026
4 Feb 2026
23 Jan 2026
Clearing and cutting,removal of wooden logs,trees and branches stuck to the bandharas,obstructing the normal flow of water.
Earthwork in excavation by desilting of river , nallahs ponds ,etc. by mechanical means in all type of strata comprising any of materials such as soil ,sand, clay, gravels, moorum of all varieties, shingles, pebbles all types of conglomerated laterite rock, soft rock ,ordinary rock, disintegrated rock , fissured/shattered, decomposed rock and all such other materials either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted including chiseling, wedging etc but blasting prohibited in all condition such as dry , moist , saturated, submerged foul condition etc. including setting out construction of shoring, strutting removal of stamp and other
Fixing of bandhara gates after monsoon including tranporting the same from Godown/shed upto bandhara site, including loading, unloading with all leads and lifts etc. Sealing of the gates with plastic sheet (as the case may be)to make in water proof including cost towards all consumables if any complete and as directed by Engineer in charge. a)Fiber reinforced plastic (FRP) Gates
b) Kolhapur type (KT)Gates
Providing Polythene sheets on upstream side of bandhara gates to prevent leakages through the joints.
Transportation of wooden planks from godown to bandhara site during closing operation and from bandhara site to godown after removal with an average lead of 20kms by mechanical transport including loading unloading and stacking etc complete.
Engaging labours for closing the bandhra by placing the wooden planks in proper position, laying polythene sheet and filling the moorum in between wooden planks which includes manual loading and unloading.
Supplying and filling in plinth under floors, trenches including watering ramming consolidating,dressing, complete.
Removal of bandharas gates before onset of monsoon and transporting the same upto godown/shed, including loading, uploading and stacking with all leads and lifts etc. Complete and as directed by Engineer in charge. a)Fiber reinforced plastic (FRP) Gates
b) Kolhapur type (KT) Gates
Removal of wooden planks to fixed in position between the piers of open type bandhara by manually including removal of earth between the planks and disposal of earth manually , loading and unloading of planks etc.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: b)In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
Tendernotice_2.pdf
PDF • 0.68 MB
BOQ_27875.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid