Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹63.1 L
EMD Value
₹1.3 L
Closing Date
16 Oct 2026, 10:30 am5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer
Rajgarh Division HPPWD Rajgarh
Restoration rain damages on Solan Meenus road Km 24/345 to 61/0 (SH Providing paved shoulders by providing Interlocking Paver Blocks and construction of drain along with drain covers at various RDs between Km 39/0 to 40/0 etc) (Rajgarh Market) Under
2026_PWD_145385_10
No. RGH-Estt-Tender-5762 dated 08.10.26
Open Tender
Civil Works - Roads
Percentage
90 days
Rajgarh Division HPPWD Rajgarh
Please refer Tender documents.
14 documents required · 14 mandatory
₹2,000
₹1.3 L
9 Oct 2026
9 Oct 2026
16 Oct 2026
9 Oct 2026
16 Oct 2026
9 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | Earth Work | - | - | - | - |
| 1 | Earthwork in excavation for all type of roads, structures such as retaining wall, breast wall, culvert, drain and parapets etc. in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rock chiesling / wedging out rocks (where blasting is prohibeted) as per drawing and technical specification true to lines and grades. Dimesions and other particulars as per drawing and Technical Specification Clause 305.1(Three hundred Five point One) and 1606.1(One six zero six point one) including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all lead and lifts including dressing of sides and bottom and backfilling in trenches with excavated suitable material. All work of excavation by blasting shall be carried out by taking all necessary precautions against soil erosions, damage to hill side & any structure near about, water pollutions etc., and to protect stability of hill side rock. Stacking of materials useful for construction at suitable sites and safe disposal of unserviceable excavated materials in specified manners to dumping site(to be arranged by the contractor), trimming, filling of unevenness blindages and finishing of the road to specified dimensions or as directed by the Engineer-in-Charge. Any loss to the public or private property during the course of execution shall be the sole responsibility of the contractor, which shall have to be duly compensated by him at his own cost of all cases. | 1,514.08 | Per Cubic Metre. | 240 | ₹3,63,379.2 |
| 2 | Providing and laying Interlocking Concrete Block Pavements having thickness 80 mm (Eighty) milimetre thick (NTC or Its equivalent) having grade of M40 (Forty) or above , as per drawings and Technical Specification Clause 150 ,all leads and lifts to the entire satisfaction of Engineer-in-charge. | 1,100 | Per Square Metre | 1,250 | ₹13,75,000 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttring- all work up to plinth level in 1:2:4 (One Cement : Two Sand : Three graded stone) aggregate 20mm (Twenty) milimetre niminal size complete as par drawings and technical specifications C- 802, 803, 1202 & 1203(Clause - Eight hundred Two, Eight hundred Three, One thousand Two hundred Two and One thousand Two hundred Three) and curing complete including the cost of form work and carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer-in-Charge. | 130.4 | Per Cubic Metre. | 5,240 | ₹6,83,296 |
| 4 | Providing and laying Plain Cement Concrete nominal mix 1:3:6 (one cement into three sand into six graded stone aggregate 20mm twenty millimeters nominal size) Mechanically mixed and vibrated for plain/reinforced concrete in / under water and curing complete for 14 (fourteen ) days in open foundations and plinths for all type of structure or similar works like drain etc. including pumping and bailing out water (surface and sub soil water) dewatering for all depth and any quantum of water including removal of slush which may arise at the time of laying under water complete for all height /depth including the cost of form work complete as per drawing and MORD Technical Specification clause 802, 803, 1202 and 1203 (Eight hundred two, eight hundred three, one thousand two hundred two and one thousand two hundred three) or as directed by the Engineer-in-Charge including carriage of materials with in all leads and lifts and other incidentals. | 348.66 | Per Cubic Metre. | 4,600 | ₹16,03,836 |
| 5 | Providng and fixing mild steel/ Tor steel reinforcement of RCC work including bending biding and placing in position complete Tor steel, as per drawing and HPPWD technical specifications C- 802, 803, 1202 & 1203(Clause - Eight hundred Two, Eight hundred Three, One thousand Two hundred Two and One thousand Two hundred Three) in all leads and lifts to the entire satisfaction as per direction of Engineer-in-Charge. | 3,802 | Per Kilo gramme | 79 | ₹3,00,358 |
| 6 | Providing and laying concrete for plain/reinforced concrete in open foundations complete as par drawings and technical specifications C- 802, 803, 1202 & 1203(Clause - Eight hundred Two, Eight hundred Three, One thousand Two hundred Two and One thousand Two hundred Three) 1:4:8. (One Cement : Four Sand : Eight graded stone) aggregate 40 mm (Forty) nominal size and curing complete including the cost of form work and carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer-in-Charge. | 389.78 | Per Cubic Metre. | 4,300 | ₹16,76,054 |
| 7 | Providing weep holes in brick masonry/ stone masonry, plain/reinforced concrete abutment, wing walls, return wall with 100mm (One hundred) milimetre dia AC pipe extending through the full width of the structures with slope of 1(V):20 (H) towards drawing face complete as per drawing and technical specification clauses 614, 709,1204.3.7. all modes of transportation in all leads and lifts to the entire satisfaction of the Engineer-in-Charge, | 102 | Per Nos | 235 | ₹23,970 |
| 8 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 in granular material. as per drawing and HP PWD techinical specifications i/c carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer-in- Charge. | 53.14 | Per Cubic Metre. | 650 | ₹34,541 |
| 9 | Providing and laying reinforced cement concrete pipe NP2- 900 mm (nine hundred millimeter) diameter for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 (one cement into two sand) but excluding excavation, protection work, back filling, concrete and masonry work in head walls and parapets as per technical specification clause 1108(one thousand one hundred eight), or as directed by the Engineer-in-Charge including carriage of materials with in all leads and lifts and other incidentals. | 2.5 | Per Running Metre. | 3,400 | ₹8,500 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.24 MB
BOQ_216521.xls
BOQ • 0.25 MB
SBD.pdf
Tender Documents • 6.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .