Loading…
Loading…
Tender Value
₹33.3 L
EMD Value
₹33,500
Closing Date
11 May 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer
Providing Constructing Coffer dam at RBHR and LBHR intake well of Pigut Irrigation scheme
299329
4 of 2026-27
Open
Civil - All
Narmada
8 documents required · 7 mandatory · 1 optional
₹1,500
EXECUTIVE ENGINEER IRRIGATION PROJECT DIVISION NO.4, RAJPIPLA
₹33,500
1 May 2026
1 May 2026
1 May 2026
11 May 2026
1 May 2026
BILL OF QUANTITIES
(ATTACHED SEPARATELY)
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far
as it is otherwise provided under the Contract, include all constructional plant,
layout, supervision, materials, erection, maintenance, insurance, profit, taxes and
duties, together with all general risks, liabilities and obligations set out or implied
in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause-29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by ripping
with a tractor of at least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender ( Upto INR 50 Cr.)
Item Description of Item (with brief Quantity Unit Rate In Amount
No specification and reference to figures
book of specifications)
1 Earthwork for embankment including
breaking clods, dressing with all lead
and lift (excluding watering and
consolidation).
(E) From Borrow area within 3.0 Km.
2 Compaction of earthwork in
embankment in uniform layers at
optimum moisture content to required
dry density including watering, rolling
with suitable type of roller of specified
capacity etc. complete.
3 Providing and laying empty cement
bags with good selected earth including
stitching and laying as and where 8889.00 No. 25.90
required. (Polywoven bag of 50 kg
4 Dewatering during excavation of
canals, drains, foundation trenches etc.
by using pumps of suitable capacity
either diesel or electric driven including 8000.00 Hp/Hr 53.80
cost of labour, pipes etc. for delivery
distance beyond 100 m. (By
5 Dismentalling the existing earth bund
including depositing the useful
excavated stuff as and where directed
including sorting and stacking useful 10080.00 Cum 60.00
material as required up to lead of 50 mt.
and all lifts etc completed as per
instructions of Engineer in Charge.
I/We/am/are willing to carryout the work at… .................. % above/below percent (Should
Be written in figures and words) of the estimated rate mentioned above. Amount of my/our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………%below Add………%Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book In In
of specifications) figures Words
(A)Total Tendered Amount
(B)Rebate on above tendered amount (if any) % (in figure)………………………………
(C)Net Tendered Amount (A-B) (in figure)………………………………
1 The Contractor shall exhibit a board with brief details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as
per Govt. as stated in S.O.R .therefore in R.C.C. items where there is a change as per
actual mix design the cost of difference of cement consumption have been deducted
from the rate of original item at the rate of input rate mentioned in all the tender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
DTP Coffer Dam Pigut (1).pdf
BOQ Coffer Dam Pigut.pdf
Technical Specification of Coffer Dam Pigut.pdf
NIT coffer dam.pdf
Download all tender documents and submit your bid