Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-Finance | ₹5.7 L | L1 | Accepted-Finance being L1 |
| 2 | L2₹5.9 L+₹19,739.46 (3.49%)Accepted-Finance | ₹5.9 L+₹19,739.46 (3.49%) | L2 | Accepted-Finance being L2 |
| 3 | L3₹6.5 L+₹81,982 (14.5%)Accepted-Finance | ₹6.5 L+₹81,982 (14.5%) | L3 | Accepted-Finance being L3 |
| 4 | L4₹6.7 L+₹1.0 L (17.7%)Accepted-Finance LID AND EW SECTION PALLIKKATHODU GRAMA PANCHAYATH | KOTTAYAM | KERALA | 686102 | ₹6.7 L+₹1.0 L (17.7%) | L4 | Accepted-Finance being L4 |
| Sl No | Description | Qty | Unit | Shajimon Joseph L4 | Roopesh M R L3 | RONY GEORGE L1 | ABINSHA ASHIL L2 |
|---|---|---|---|---|---|---|---|
| 1.00Roof Palstering Works | |||||||
| 1.00 | OD97633/2025-2026:Cleaning wall surface with High pressure water jet | 621.1 | sqm | 9.32 ₹5,788.65 | 9 ₹5,589.9 | 8 ₹4,968.8 Lowest | 8.2 ₹5,093.02 |
| 1.00 | 22.5:Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours. b) Second layer of slurry of cement @ 0.242 kg /sqm mixed with water proofing cement compound @ 0.126 kg/ sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry. | 72 | sqm | 599.84 ₹43,188.48 | 584 ₹42,048 | 500 ₹36,000 Lowest | 527.34 ₹37,968.48 |
| 1.00 | 22.6:Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. laying second layer of fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. d) fourth and final layer of brick tilling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured) | 549.1 | sqm | 679.86 ₹3,73,311.13 | 661 ₹3,62,955.1 | 600 ₹3,29,460 | 597.7 ₹3,28,197.07 Lowest |
| 1.00 | 13.7.2:12 mm cement plaster finished with a floating coat of neat cement of mix:1:4 ( 1 cement : 4 fine sand) | 566.6 | sqm | 419.48 ₹2,37,677.37 | 408 ₹2,31,172.8 | 335 ₹1,89,811 Lowest | 368.78 ₹2,08,950.75 |
| 1.00 | 13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) | 24 | sqm | 193.75 ₹4,650 | 189 ₹4,536 | 170 ₹4,080 Lowest | 170.34 ₹4,088.16 |
| 1.01 | OD97634/2025-2026:Engaging Coolie | 2 | Day | 1,002 ₹2,004 | 1,000 ₹2,000 | 1,000 ₹2,000 | 880.89 ₹1,761.78 Lowest |
Tender Value
₹7.2 L
EMD Value
₹17,999
Closing Date
5 Aug 2026, 3:00 pmClosed
Assistant Executive Engineer
Buildings subdivision Pala
Roof plastering and water proofing og ladies hostel Govt.poly technic collage Pala. This estimate consists provisions for roof cleaning, water proofing and roof plastering etc
2026_PWD_862761_1
ET-10/AEE/BL/PALA/2026-2027
Open Tender
Civil Works - Buildings
Item Rate
180 days
Pala
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,590
₹17,999
Yes
14 Aug 2026
27 Jul 2026
7 Aug 2026
27 Jul 2026
5 Aug 2026
27 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Roof Palstering Works | |||||
| 1.001 | OD97633/2025-2026:Cleaning wall surface with High pressure water jet | - | sqm | - | - |
| 1.002 | 22.5:Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours. b) Second layer of slurry of cement @ 0.242 kg /sqm mixed with water proofing cement compound @ 0.126 kg/ sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry. | - | sqm | - | - |
| 1.003 | 22.6:Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. laying second layer of fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. d) fourth and final layer of brick tilling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured) | - | sqm | - | - |
| 1.004 | 13.7.2:12 mm cement plaster finished with a floating coat of neat cement of mix:1:4 ( 1 cement : 4 fine sand) | - | sqm | - | - |
| 1.005 | 13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) | - | sqm | - | - |
| 1.006 | OD97634/2025-2026:Engaging Coolie | - | Day | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_1459233.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
SBD.pdf
Tender Documents • 1.63 MB
BOQ_1459233.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .