| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.7 LAccepted-AOC ALIGARH | ALIGARH | UTTAR PRADESH | 202001 | ₹77.7 L Quoted ₹1.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L7₹51.8 L+₹28.8 L (22.2%)Accepted-AOC 12 KHARGONE ROAD JHIRBHAR TEH SANAWAD KHARGONE WEST NIMAR MADHYA PRADESH 451113 UDYAM MP 28 0006344 | KHARGONE | MADHYA PRADESH | 451113 | ₹51.8 L+₹28.8 L (22.2%) Quoted ₹1.6 Cr | L7 | Accepted-AOC L2 |
| 3 | L2₹1.4 Cr+₹15.1 L (11.7%)Rejected-Finance | ₹1.4 Cr+₹15.1 L (11.7%) | L2 | Rejected-Finance L2 |
| 4 | L3₹1.5 Cr+₹17.7 L (13.7%)Rejected-Finance | ₹1.5 Cr+₹17.7 L (13.7%) | L3 | Rejected-Finance L3 |
| 5 | L4₹1.5 Cr+₹19.8 L (15.3%)Rejected-Finance 1 10665 SUBHASH PARK NAVEEN SHAHDARA DELHI 110032 | SHAHDARA | DELHI | 110032 | ₹1.5 Cr+₹19.8 L (15.3%) | L4 | Rejected-Finance L4 |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
28 Jan 2025, 3:00 pmClosed
MANAGER
Pride Purple Coronet, 2nd Floor, Baner Road, Baner, Pune-411045
Tender for Rate Contract for the period of Two years for to appoint agency to procuring the supply of manpower for Patrolling of Steel-MDPE Network, Excavation Supervisor to monitor third party Excavation site in MNGL Nashik GA.
2025_MNGL_223248_1
MNGL/CP/2024-25/155
Open Tender
Manpower Supply
Works
730 days
NASHIK
AS PER TENDER
16 documents required · 16 mandatory
₹0
₹2 L
Yes
PUNE
4 Aug 2025
7 Jan 2025
29 Jan 2025
7 Jan 2025
28 Jan 2025
7 Jan 2025
15 Jan 2025
Amount
Monthly Manpower: The MNGL Pipeline & Assets needs daily monitoring, supervision, patrolling, reporting, daily planning & scheduling of O&M activities to protect the pipeline network and to avoid the pipeline damages from Third Party’s planned / un-planned digging. This SOR covers the work scope as defined in tender and also covers all the External – Internal coordination & communication with agencies like. MNGL, Govt. authorities, other utility companies, customers, societies, public etc., mobilization of manpower with tools, Motorbike etc. whichever are required to protect the pipeline, to complete the given task, to respond immediately in emergency etc. and any other requirement to ensure the continuous and 24X7 gas supply to customers etc. This SOR covers the mobilization of Manpower as per requirement of MNGL for Pune GA with motorbike, petrol, android mobile, PPEs, GPS/VTS tracker, uniform, ID card, Tools & Tackles etc. whichever is required to perform the duties. The contractor has to appoint a fulltime coordinator / supervisor with office logistics etc. to monitor & perform the day-to-day O&M activities and submission of DPR, MIS and any other data as requested by MNGL. The unit service rate is fixed for the contract and contractor to quote the rates considering current Minimum Wages and increase in the minimum Wages over the contract period. Please note that no statutory variations on account of change in Minimum Wages shall be paid by the contractor. However, Bidder has to comply the statuary requirement and submit the documents accordingly. The contractor has to render all the services as per the Scope of Work defined in tender and as the instruction given by MNGL time to time upto the satisfaction of EIC.
Manpower Supply-Patrolman (Semi Skilled)(The SOR unit rate will be fixed for 2250KM per person per month and the extra km will reconciled & Claim as per SOR No. 04)
Manpower Supply-Excavation Supervisior (The SOR unit rate will be fixed for 2250KM per person per month and the extra km will reconciled & Claim as per SOR No. 04)
PPES ETC (Covers Safety Shoes,Reflective Jacket,Helmet,Mobile Bill & other miscellaneous things required to perform service.Contractor must pass this amount to patrolman & excavation supervisior on monthly basis against use at site on daily basys.Failing which,contractor is not liable to claim the SOR for the month of respective person).
Patrol Charges (Covers the expenditure against running of two-wheeler as per contract and other miscellaneous things which required to perform service.Contractor must pass this amount to patrolman on monthly basis against use at site on daily basis.Failing which contractor is not liable to claim for the month of respective person)
Charges for extra kilometre over fixed KM:The Kilometers of the patrolman will be reconciled in totality @ 2250 Kms as Fixed Kms per patrolman per month based as per the patrolling route (@ 75Km per route). The total running kilometers of all mobilized patrolmen will be considered for reconciliation and Contractor can claim the extra kilometer if it excides
NOTES: 1) Please note that service charge rate on SOR item No. 4, 5 and 6 is not considering for evaluation. 2) *Service charges:Covers the back office expenditure against the services/contract like appointment of coordinator,ProvidinG GPS tracking & integration with MNGL control room,Biometric punching,appointment of manpower,Police verification,DA revision etc and any required thing/item which require to complete,tracking and recording the service. **The charges are fixed for tender and contractor has to pass it to manpower 3) Evaluation and comparison shall be done on overall basis (least cost to the MNGL). 3) Bidder to quote for all items of the SOR otherwise bid shall be rejected. 4) The rate should be ALL INCLUSIVE, including all expenses, like wages, EPF, ESIC workers, other costs, Charges, GST etc. 5) The Manpower required indicated above is only indicative. Deployment of manpower shall be as per instructions/requirement of EIC, MNGL. 6) Rates quoted should be firm throughout the contract period. 7) Contractor to absorb the MLWF of the workers. 8) Contractor to load any type of overhead in the SOR items. No separate payment will be made to the contractor under any head except SOR items.
JAYAM INFRATECH PRIVATE LIMITED (BID ID -812251)
DESAI ENERGY LLP (BID ID -813116)
JUSTIN GLOBAL SERVICES (BID ID -808993)
MAESTROBL INFRASTRUCTURE PVT LTD (BID ID -812772)
SWARAJYA ENTERPRISES (BID ID -812995)
MISHAK ENTERPRISES (BID ID -813134)
SHRI SAI TRADERS (BID ID -810414)
R.V. MOVALIYA CONSTRUCTION CO (BID ID -813010)
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .