Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-Finance | ₹1.3 Cr | L1 | Accepted-Finance LOW RATE |
| 2 | L2₹1.3 CrRejected-Finance | ₹1.3 Cr | L2 | Rejected-Finance HIGH RATE |
Tender Value
₹1.3 Cr
EMD Value
₹8.6 L
Closing Date
25 Mar 2026, 12:00 pmClosed
Superintending Engineer
SE BALLIA CIRCLE PWD BALLIA
Construction of a new culvert to replace the damaged one on the Bhojpurwa link road.
2026_CEUAZ_1128063_1
1292/NIVIDA(CD)-BALLIA CIRCLE/2025 DATE 11.03.2026
Open Tender
Civil Works - Bridges
365 days
BALLIA
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,590
₹8.6 L
SE BALLIA CIRCLE PWD BALLIA
2 Apr 2026
20 Mar 2026
25 Mar 2026
20 Mar 2026
25 Mar 2026
20 Mar 2026
23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling brick work or stone work in lime or cement mortar and including stacking of dismantled materials as directed by Engineer-in-charge within a distance of 60m. SI no 692 | |||||
| 2Dismentalling cement concete or brick or granolithic floor including stacking of materwials as directed by the Engineer-incharge within a distance of 60M. (200 feet) as per S.I.NO. 697 | |||||
| 3Dismantling RCC or RBC work in cement mortar and including stacking of dismantled materials as directed by Engineer-in-charge within a distance of 60m. SI no 692 | |||||
| 4Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. | |||||
| 5Granular Filling in Foundation Trenches as per Drawing & Technical Specification | |||||
| 6Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | |||||
| 7RCC Grade M25 in foundation using batching plant transit mixer & manual placing | |||||
| 8RCC Grade M-30 in Foundation using batching plant transit mixer & manual placing | |||||
| 9RCC Grade M-30 in Super structure using batching plant transit mixer & manual placing | |||||
| 10RCC Grade M-35 in Super structure using batching plant transit mixer & manual placing | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
T2.pdf
Tender Documents • 1.29 MB
BOQ_2103925.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid