Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC | ₹4.8 L Quoted ₹4.9 L | L1 | Accepted-AOC Bid is selected as first lowest quoted. Hence accepted as L1 |
| 2 | L2₹4.9 L+₹109.78 (0.02%)Rejected-AOC | ₹4.9 L+₹109.78 (0.02%) | L2 | Rejected-AOC Bid is selected as second lowest quoted. Hence rejected L2 |
| 3 | L3₹6.1 L+₹1.2 L (24.9%)Rejected-AOC | ₹6.1 L+₹1.2 L (24.9%) | L3 | Rejected-AOC Bid value is higher than EPAC amount and selected as third lowest quoted. Hence rejected L3 |
| Sl No | Description | Qty | Unit | SUNIL PAUL L2 | muralikrishnan L1 | HARIDAS VINU L3 |
|---|---|---|---|---|---|---|
| 1.00Pre-Monsoon Work | ||||||
| 1.00 | 55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | 2.01 | cum | 2,352.92 ₹4,729.37 | 2,352.39 ₹4,728.3 Lowest | 2,937.18 ₹5,903.73 |
| 1.00 | OD33024/2026-2027: Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) using 12mm departmental broken stone and compacting with power roller to get a compact surface. | 2.01 | cum | 8,032.68 ₹16,145.69 | 8,030.87 ₹16,142.05 Lowest | 10,027.3 ₹20,154.87 |
| 1.00 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 5.47 | cum | 2,275.21 ₹12,456.77 | 2,274.7 ₹12,453.98 Lowest | 2,840.18 ₹15,549.99 |
| 1.00 | OD33023/2026-2027: Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 5.47 | cum | 3,515.12 ₹19,245.28 | 3,514.33 ₹19,240.96 Lowest | 4,387.97 ₹24,024.14 |
| 1.00 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 173.5 | sqm | 11.24 ₹1,950.14 Lowest | 11.24 ₹1,950.14 Lowest | 14.03 ₹2,434.21 |
| 1.01 | OD304092/2025-2026:Filling up pot holes with bituminous ready mix compound (25 kg/bag) and compacting by
ramming to get a compact surface including cost of materials, laying charges, transportation to
site etc complete. Rate arrived for a a bag of 25 kg after applying a tack coat on surface. | 310 | no | 692.01 ₹2,14,523.1 | 691.86 ₹2,14,476.6 Lowest | 863.85 ₹2,67,793.5 |
| 1.01 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | 0.27 | Hectare | 44,905.99 ₹12,124.62 | 44,895.89 ₹12,121.89 Lowest | 56,056.73 ₹15,135.32 |
| 1.01 | OD304226/2025-2026:Engaging Man Mazdoor for clearing inside of the culverts and drain, removing earth and other unserviceble matter etc. to suitable places | 44 | Day | 1,002.45 ₹44,107.8 | 1,002.22 ₹44,097.68 Lowest | 1,251.37 ₹55,060.28 |
| 1.01 | OD304227/2025-2026:Engaging wood cutter for cutting and removing dangerously overhanging branches of trees
Labour | 30 | Day | 1,109.69 ₹33,290.7 | 1,109.44 ₹33,283.2 Lowest | 1,385.24 ₹41,557.2 |
Tender Value
₹5.5 L
EMD Value
₹13,778
Closing Date
8 Jun 2026, 11:00 amClosed
Assistant Executive Engineer
PWD NH Sub Division, PWD Office Complex, Civil Station, Palakkad 678001
GENERAL- Kozhikkode-Palakkad NH966-Pre-Monsoon Work-2026-27-between Km 133/720 (Thanavu) to Km 140/960 (Chandra Nagar)-General Civil work
2026_PWD_853464_1
PWD/NH/TR/2547/2026_5_1_1/1
Open Tender
Civil Works - Highways
Item Rate
180 days
Thanavu to Chandranagar
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,215
₹13,778
7 Jul 2026
30 May 2026
10 Jun 2026
30 May 2026
8 Jun 2026
30 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Pre-Monsoon Work | |||||
| 1.001 | 55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | 1 | cum | - | - |
| 1.002 | OD33024/2026-2027: Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) using 12mm departmental broken stone and compacting with power roller to get a compact surface. | 1 | cum | - | - |
| 1.003 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 1 | cum | - | - |
| 1.004 | OD33023/2026-2027: Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 1 | cum | - | - |
| 1.005 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | - | sqm | - | - |
| 1.006 | OD304092/2025-2026:Filling up pot holes with bituminous ready mix compound (25 kg/bag) and compacting by
ramming to get a compact surface including cost of materials, laying charges, transportation to
site etc complete. Rate arrived for a a bag of 25 kg after applying a tack coat on surface. | - | no | - | - |
| 1.007 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | - | Hectare | - | - |
| 1.008 | OD304226/2025-2026:Engaging Man Mazdoor for clearing inside of the culverts and drain, removing earth and other unserviceble matter etc. to suitable places | - | Day | - | - |
| 1.009 | OD304227/2025-2026:Engaging wood cutter for cutting and removing dangerously overhanging branches of trees
Labour | - | Day | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1442372.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
SBD.pdf
Tender Documents • 1.64 MB
BOQ_1442372.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .