| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.9 LAdmitted-Finance | -9.11% | ₹6.9 L | L1 | Admitted-Finance |
| 2 | L2₹7.3 LAdmitted-Finance | -3.15% | ₹7.3 L | L2 | Admitted-Finance |
Tender Value
₹7.7 L
EMD Value
₹15,400
Closing Date
21 Jan 2026, 6:00 pmClosed
MUTHU S
DCF WL MNP KOTA OFFICE
Construction of WHS-II (Singhadia ka nala at Range Kolipura)
2026_FORES_527523_7
NIT-37/2025-26
Open Tender
Civil Works
KOTA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
AS PER NIT
₹15,400
Yes
24 Jan 2026
14 Jan 2026
22 Jan 2026
14 Jan 2026
21 Jan 2026
14 Jan 2026
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : Ordinary rock
Drilling Holes Of 35mm Dia Meter For Anchor Rods 20 mm WRD BSR 2023 CH.N0.11 ITEM N0.1(A)
Labour Charges For Fixing Of Anchor Bars in Net Cement Grout Including Cost Of Cement And Curing etc.Complete WRD BSR 2023 CH.N0.11 ITEM N0.1(b)
Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) 16 mm 400 m.&1.58 par m.=632kg
Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in : Cement Mortar 1:6 ( 1-Cement : 6-Sand).
Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in : Cement Mortar 1:6 ( 1-Cement : 6-Sand).
Providing & fixing precast cement concrete coping 1 : 2 : 4 mix 50mm thick complete as per specification :
Plaster on new surface on walls in cement sand mortar 1:6 including racking of joints etc. complete fine finish :25 mm thick
Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift.
Supply & Stacking good soil of earth at site complete including loading unloading & Transportation etc.Good soil of earth
Banking excavated earth in layers not exceeding 20cm. in depth breaking clods watering, rolling each layer with 1/2 tonne roller, or stone or steel rammers, and rolling every 3rd and top- most layer with power roller of 8-10 tonne capacity and dressing up in embankments for roads, flood banks marginal banks, and guide banks etc. lead up to 50 Mtr. and lift up to 1.5 Mtr. All kinds of soils
Laying single RR stone pitching ,handpacked , including filling of voids with small stones..30mm thick (120 X4X .30)=120 CCF Udaipur 2025 page no.11 item no.19.2
Laying single RR stone pitching ,handpacked , including filling of voids with small stones..30mm thick (120 X4X .30)=120 CCF Udaipur 2025 page no.11 item no.19.3
Pointing of Stone masonary in cement Sand mortar 1:3(1 cement:3 fine sand) Flush/Ruled
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.47 MB
NIT.pdf
Tender Documents • 3.45 MB
BOQ_941505.xls
BOQ • 0.33 MB
Estimate.pdf
Other Document • 1.63 MB