Loading…
Loading…
Tender Value
₹23.7 L
EMD Value
₹47,405
Closing Date
31 Aug 2026, 2:00 pm7d left
SE/C-II/RB/KMDA
OFFICE OF THE SUPERINTENDING ENGINEER CIRCLE-II, R and B SECTOR, K.M.D.A. UNNAYAN BHAVAN, BLOCK -A, (7TH FLOOR) BIDHAN NAGAR, KOLKATA -700 091
CONSTRUCTION OF ROAD FROM START POINT-ALOK CHATTERJEE FACTORY END POINT- BANTI AGARWAL FACTORY AT GHOSAL PARA AT WARD NO-01 WITHIN BAIDYABATI MUNICIPALITY, HOOGHLY DISTRICT.
2026_KMDA_5018312_1
60/SE/C-II/RB/KMDA/ W-28 (Part-VIII) of 2025-2026 (2nd Call) DATE 11/08/2026
Open Tender
CIVIL WORKS
Percentage
60 days
UNNAYAN BHAWAN
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹47,405
17 Aug 2026
17 Aug 2026
2 Sept 2026
17 Aug 2026
31 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1,500 mm. | - | % Cum | - | - |
| 2 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) With earth obtained from excavation of foundation. | - | % Cum | - | - |
| 3 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. (Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835) | - | Cum | - | - |
| 4 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | - | Sqm | - | - |
| 5 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. Pakur Variety | - | Cum | - | - |
| 6 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | - | Sqm | - | - |
| 7 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. Pakur Variety. | 1 | Cum | - | - |
| 8 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. 25 mm to 30 mm shuttering without staging in foundation | - | Sqm | - | - |
| 9 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. For OTHER MANUFACTURERS NOT SPECIFIED. Tor Steel Rods/HYSD/Fe 415/Fe 500/Fe 500D | - | MT | 1 | - |
| 10 | Supplying and Laying in the specified pattern of Interlocking Concrete Block Pavements (ICBP) with concrete blocks (with concrete grade as specified as per Table 1 of IS 15658:2006) manufactured in steel mould clamped to a vibrating table by hydraulic pressure (as per cl. no. 6.30 of IRC SP: 63 (2018), from BIS licensee manufacturer, with spacer nib (Small protruding profiles on the vertical face of a paver block used as a device for keeping minimum joint gap in between the paving blocks, as per Cl. No 3.26 of IS: 15658)and of specified size and shape with aspect ratio (The ratio of length to thickness of a paver block, as per Cl.No.3.3 of IS: 15658) as per Table 2 of IS:15658 with flexural strength/breaking load as per Annexure G of IS:15658, on the prepared base course of specified CBR as per Table 1 of IRC SP 63 (2018) or else as mentioned in design and drawing with a cushion of compacted bedding sand of 25-35 mm thick (grading of the bedding sand as per clause 6.5.1 of IRC SP- 63) and filling up the gaps in between paver blocks with joint filling sand (the grading of the joint filling sand will be as per clause 6.5.2 of IRC SP 63) and completing the edges with cut blocks as per Cl. No. 8.7 of IRC SP-63(2018) with proper of bedding and joint filling sand, and filling up of the edge gap. 80 mm thick. Grey. | - | Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.90 MB
BOQ_5090270.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].