Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.0 CrAccepted-AOC | ₹1.0 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹1.0 Cr+₹13,399.46 (0.13%)Rejected-AOC 58 NEW MARKET CLOCK TOWER DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹1.0 Cr+₹13,399.46 (0.13%) | L-2 | Rejected-AOC L-2 |
| 3 | l-3₹1.0 Cr+₹20,932.38 (0.21%)Rejected-AOC AISHA BHAWAN 643 648 SHOP NO 202 FASIL ROAD FARASHKHANA BEHIND G B ROAD DELHI 110006 | NORTH | DELHI | 110006 | ₹1.0 Cr+₹20,932.38 (0.21%) | l-3 | Rejected-AOC L-3 |
| 4 | L-4₹1.0 Cr+₹41,253 (0.41%)Rejected-AOC DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹1.0 Cr+₹41,253 (0.41%) | L-4 | Rejected-AOC L-4 |
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
15 Feb 2024, 11:00 amClosed
executive engineer tubewell division haldwani
executive engineer tubewell division haldwani
Providing Installation and commissioning of servo voltage Stabilizer linear type rolling contact 200KVA along with construction of stabilizer RoomAt STW No 88 HG 156HG 190HG 215 HG 188 HG 191 HG 209 HG 210HG 211 HG 213 HG 230 HG 231 HG Golapar Secti
2024_IRDCE_68962_1
08/EE/2023-24
Open Tender
Electrical Works
Item Rate
120 days
GOLAPAAR SECTION
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,720
executive engineer tubewell division haldwani
₹2.0 L
4 Oct 2024
5 Feb 2024
15 Feb 2024
6 Feb 2024
15 Feb 2024
7 Feb 2024
Amount
Providing Installation, Testing and commissioning of servo voltage Stabilizer 200 KVA (3 Phase) ISO Certified, suitable for indoor use, with stand ambient Temprature upto 55 DEG-CEL unit is a Combination of three No single phase air-cooled Units immersed in one oil cooled tank with separate control circuit for individual correction in each phase, combination suitable for Balance-Unbalanced supply and load. The servo Stabilizer Shall be complete with high/low voltage cut-off system, MCCB & Oil, input Voltage: 320- 480 Volt, output voltage ; 415(+/-)1% Type : Rolling contact (LInear Type), MCCB, inbuild as incommer, with Change over switch and required 4 core cable along with G.I. Strip & G.I Earth electrode for safety.
E/w in digging foundation including back filling.
C.C 1:4:8CM for foundation
Brick work 1:4cm in 35cm with new brick up to the plinth level.
Brick work 1:4cm in 23cm with new brick above to the plinth level .
M.S. Bar 10/12 mm Ø work including cutting ,bending , binding wire and binding wire i/c cost of material
R.C.C work 1:2:4CM for roof & lintel
Cement plaster1:4CM with 12 mm. thick
C.C 1:2:4CM for flooring.
Painting work & White washing (inner & outer side)
S/F Steel door with lock.
S/F Steel Window.
S/F ventilator .
Supra Electrical
ELECTROHARD INDUSTRIAL SOLUTIONS
VERSATILE
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .