Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹1.3 Cr
EMD Value
₹2.1 L
Closing Date
2 Mar 2026, 10:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Service contract for Maintenance of crane girders & crane rails, traverser rails, Leak test plants in Furnishing and LHB Factory for 2 Years
2026377212090~ICF
2026377212090
Open
Service - General
24 Months
Chennai, Tamil Nadu
₹0
₹2.1 L
2 Mar 2026
6 Feb 2026
16 Feb 2026
Item Breakup - A-Items not covered under DSR 2021
Maintenance and repair works of crane rails over Man- girders in various shops upto a height of 15metre Days from floor level of the shed in all sheds,Open gantry,&Goliath crane and traverser rails inside Furnishing Factory and LHB sheds. The rate includes:- (1) labourers for gas cutting ,welding etc. (2) Checking and maintaining of rail alignment,level and gauge (3) Tighening of bolts,nuts,fish plates etc (4) All working,Gas cutting and other activities such as lifting and lowering of rails and other materials with crane girders, leading the crane rail,railclip and other materials from SSE/works office to site.Note :- (a)The Rails, fishplates, MS/CI/GI clips, plates, Bolts and nuts only will be supplied free by the Railways, (b) other consumables like tools&plants including ladder, moving trolly, welding plant, electrodes and gas cutting equipments should be brought by the contractor. For climbing to the crane girder, the existing railway facilities are to be used and in case of non availability, the contractor shall arrange his own facilities. (c)Work should be carried out without damage to the cranes and other eletrical installations. (d) the work should be carried out availing electrical power shutdown only. (e)The work should be carried put as per factories act and rules and as per scope of work.(f) the work should be carried out 8 hours per day. If power shutdown is given only 4 to 5 hours. The remaining three hours the labourers should work in other locations,where power shutdown is not required. (g) The minimum 3 Nos of skilled labour and 1 No of Helper should be available in Furnishing Factory including LHB sheds and shall attend to all repair works releated to crane rails, girders and traververser rails at Furnishing and LHB sheds as per the daily requirements and as direted by Engineer-in- charge. (i) The rate quoted shall be inclusive of all contractor's safety acessories i.e :_ PPE like safety helmet, shoes, safety belts, googles for welding etc as required for the work.The rate quoted shall be inclusive of all contractor's labourers, tools & plants, equipments, consumables, taxes, lead, lift, if any etc.,complete. The contractor is soly responsible for paying PF, ESI and insurance for labourers as per the relevant rules. (a)Skilled labour (3 nos x 600 days) with tools & plants, consumables, PPE's as mentioned in the Annexures (Special conditions of contract & Additional special conditions of contract) ICF HQ-ENGINEERING/ICF
Maintenance and repair works of crane rails over Man- girders in various shops upto a height of 15metre Days from floor level of the shed in all sheds,Open gantry,&Goliath crane and traverser rails inside Furnishing Factory and LHB sheds. The rate includes:- (1) labourers for gas cutting ,welding etc. (2) Checking and maintaining of rail alignment,level and gauge (3) Tighening of bolts,nuts,fish plates etc (4) All working,Gas cutting and other activities such as lifting and lowering of rails and other materials with crane girders, leading the crane rail,railclip and other materials from SSE/works office to site.Note :- (a)The Rails, fishplates, MS/CI/GI clips, plates, Bolts and nuts only will be supplied free by the Railways, (b) other consumables like tools&plants including ladder, moving trolly, welding plant, electrodes and gas cutting equipments should be brought by the contractor. For climbing to the crane girder, the existing railway facilities are to be used and in case of non availability, the contractor shall arrange his own facilities. (c)Work should be carried out without damage to the cranes and other eletrical installations. (d) the work should be carried out availing electrical power shutdown only. (e)The work should be carried put as per factories act and rules and as per scope of work.(f) the work should be carried out 8 hours per day. If power shutdown is given only 4 to 5 hours. The remaining three hours the labourers should work in other locations,where power shutdown is not required. (g) The minimum 3 Nos of skilled labour and 1 No of Helper should be available in Furnishing Factory including LHB sheds and shall attend to all repair works releated to crane rails, girders and traververser rails at Furnishing and LHB sheds as per the daily requirements and as direted by Engineer-in- charge. (i) The rate quoted shall be inclusive of all contractor's safety acessories i.e :_ PPE like safety helmet, shoes, safety belts, googles for welding etc as required for the work.The rate quoted shall be inclusive of all contractor's labourers, tools & plants, equipments, consumables, taxes, lead, lift, if any etc.,complete. The contractor is soly responsible for paying PF, ESI and insurance for labourers as per the relevant rules. (b)Helper (1 no x 600 days) with tools & plants, consumables, PPE's as mentioned in the Annexures (Special conditions of contract & Additional special conditions of contract) ICF HQ-ENGINEERING/ICF
Maintenance of Leak test plants inside Furnishing Man- Factory and LHB shed by supplying 8 skilled Days labours and 2 Helpers (4 skilled labour and 1 Helpers -6.00hrs to 14.00 hrs) & 4 skilled labour and 1 Helpers -14.00 hrs to 22.00 hrs) involving the following activities. (a) The cleaning of nozzles/holes every alternative day including removal of scales, dirts, deposits etc., by brushing using baking soda and salt solution. (b) Cleaning of all round leak test plant drains (once in a day). (c) Cleaning of GLR once in 15 days or as when required. (d) Repair works to be carried out for which material will be supplied by ICF. the rate quoted shall be inclusive of all cleaning materials, labour, all the required tools & plants for carrying out the required repair works, lead,lift, taxes if any complete.The rate quoted shall be inclusive of all contractor's labourers, tools & plants, equipments, consumables, taxes, lead, lift, if any etc.,complete. The contractor is soly responsible for paying PF, ESI and insurance for labourers as per the relevant rules. . (a)Skilled labour (8 nos x 700 days) with tools & plants, consumables, PPE's as mentioned in the Annexures (Special conditions of contract & Additional special conditions of contract)
Maintenance of Leak test plants inside Furnishing Man- Factory and LHB shed by supplying 8 skilled Days labours and 2 Helpers (4 skilled labour and 1 Helpers -6.00hrs to 14.00 hrs) & 4 skilled labour and 1 Helpers -14.00 hrs to 22.00 hrs) involving the following activities. (a) The cleaning of nozzles/holes every alternative day including removal of scales, dirts, deposits etc., by brushing using baking soda and salt solution. (b) Cleaning of all round leak test plant drains (once in a day). (c) Cleaning of GLR once in 15 days or as when required. (d) Repair works to be carried out for which material will be supplied by ICF. the rate quoted shall be inclusive of all cleaning materials, labour, all the required tools & plants for carrying out the required repair works, lead,lift, taxes if any complete.The rate quoted shall be inclusive of all contractor's labourers, tools & plants, equipments, consumables, taxes, lead, lift, if any etc.,complete. The contractor is soly responsible for paying PF, ESI and insurance for labourers as per the relevant rules. (b)Helper (2 nos x 700 days) with tools & plants, consumables, PPE's as mentioned in the Annexures (Special conditions of contract & Additional special conditions of contract) .
Supplying of 1 supervisor to look after the Man- maintenence duties of labour involved for Crane Days rails over girders, traverser rails in various shops and Leak test plants inside Furnishing Factory and LHB shed .The rate quoted shall be inclusive of all contractor's labourers, tools & plants, equipments, consumables, taxes, lead, lift, if any etc.,complete. The contractor is soly responsible for paying PF, ESI and insurance for labourers as per the relevant rules. (a) Supervisor (1 no x 700 days) . Total 12925500.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .