Loading…
Loading…
Tender Value
₹40.1 L
EMD Value
₹80,300
Closing Date
20 May 2026, 11:00 pmClosed
Directorate of Municipal Administration
Dileep
9740706032
Annual Operation and Maintenance of Street Lights at Hinkal, Hootagalli and Hebbal in the Limits of Hootagalli CMC
DMA/2025-26/SE7544/CALL-2
DMA/2025-26/SE7544/CALL-2
Open
Electronic Documents, First(One Cover)
DMA City Municipal Council Hootagalli
9 documents required · 9 mandatory
₹1,010
₹80,300
5 May 2026
5 May 2026
20 May 2026
Supplying, Erection & Maintainance of Street Lighting Control Circuit in Metal Box Housing with 100A MCB Unit, Replacement of Existing Fuse Cut Out abd Loose/defective wire etc (ON and OFF Switches Points) Bring back to Orginal Conditions
Operation and Maintenance of Lights Sources Mentioned below and cost of Men and Materials & Ladder Vehicles etc, complete. Work has to Executed as Directed by the Engineer incharge. Here the work Includes Supply and Replacement of all Components/Materials such as Lamps, Chokes /Ballasts, Starters, Condensers, Ignitors, Side Holders, LED bulbs, LED Strips Lamps, Drives, Underground cables, Service Wires, GI Pipes, Brackets etc., complete for the Street Lighting as per the Specifications250 W HPSV
Operation and Maintenance of Lights Sources Mentioned below and cost of Men and Materials & Ladder Vehicles etc., complete. Work has to Executed as Directed by the Engineer incharge. Here the work Includes Supply and Replacement of all Components/Materials such as Lamps, Chokes /Ballasts, Starters, Condensers, Ignitors, Side Holders, LED bulbs, LED Strips Lamps, Drives, Underground cables, Service Wires, GI Pipes, Brackets etc., complete for the Street Lighting as per the Specifications,200W LED
Operation and Maintenance of Lights Sources Mentioned below and cost of Men and Materials & Ladder Vehicles etc., complete. Work has to Executed as Directed by the Engineer incharge. Here the work Includes Supply and Replacement of all Components/Materials such as Lamps, Chokes /Ballasts, Starters, Condensers, Ignitors, Side Holders, LED bulbs, LED Strips Lamps, Drives, Underground cables, Service Wires, GI Pipes, Brackets etc., complete for the Street Lighting as per the Specifications,120W LED
Operation and Maintenance of Lights Sources Mentioned below and cost of Men and Materials & Ladder Vehicles etc., complete. Work has to Executed as Directed by the Engineer incharge. Here the work Includes Supply and Replacement of all Components/Materials such as Lamps, Chokes /Ballasts, Starters, Condensers, Ignitors, Side Holders, LED bulbs, LED Strips Lamps, Drives, Underground cables, Service Wires, GI Pipes, Brackets etc., complete for the Street Lighting as per the Specifications, 90Watt
Operation and Maintenance of Lights Sources Mentioned below and cost of Men and Materials & Ladder Vehicles etc., complete. Work has to Executed as Directed by the Engineer incharge. Here the work Includes Supply and Replacement of all Components/Materials such as Lamps, Chokes /Ballasts, Starters, Condensers, Ignitors, Side Holders, LED bulbs, LED Strips Lamps, Drives, Underground cables, Service Wires, GI Pipes, Brackets etc., complete for the Street Lighting as per the Specifications,70 Watt
Operation and Maintenance of Lights Sources Mentioned below and cost of Men and Materials & Ladder Vehicles etc., complete. Work has to Executed as Directed by the Engineer incharge. Here the work Includes Supply and Replacement of all Components/Materials such as Lamps, Chokes /Ballasts, Starters, Condensers, Ignitors, Side Holders, LED bulbs, LED Strips Lamps, Drives, Underground cables, Service Wires, GI Pipes, Brackets etc., complete for the Street Lighting as per the Specifications, 45Watts
Operation and Maintenance of Lights Sources Mentioned below and cost of Men and Materials & Ladder Vehicles etc., complete. Work has to Executed as Directed by the Engineer incharge. Here the work Includes Supply and Replacement of all Components/Materials such as Lamps, Chokes /Ballasts, Starters, Condensers, Ignitors, Side Holders, LED bulbs, LED Strips Lamps, Drives, Underground cables, Service Wires, GI Pipes, Brackets etc., complete for the Street Lighting as per the Specifications, 25W LED
Class 1.1 kV HR (Heat Resistant) PVC Insulated & Sheathed Aluminium Single Core Lead wires as per IS-694 2010, PVC Wire-10 Sqmm Weight per 100 Mtr Coil 5.3 Kg (ESCOMs SR 2023-24, P No-21, I No-48.04) (1 Coil 100 Mtr & 30 Coil 3000 Mtr)
Operation and Maintenance of Lights Sources Mentioned below and cost of Men and Materials & Ladder Vehicles etc., complete. Work has to Executed as Directed by the Engineer incharge. Here the work Includes Supply and Replacement of all Components/Materials such as Lamps, Chokes /Ballasts, Starters, Condensers, Ignitors, Side Holders, LED bulbs, LED Strips Lamps, Drives, Underground cables, Service Wires, GI Pipes, Brackets etc., complete for the Street Lighting as per the Specifications, 40W FTL
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
SE7544_O and M Street Lights Bid Documents.doc
Tender Document • 0.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].