| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Rejected-Technical FIRST FLOOR 1115 SECTOR 17B 1115 FIRST FLOOR SECTOR 17B GURUGRAM GURGAON HARYANA HARYANA GURGAON HARYANA 122002 | GURUGRAM | HARYANA | 122002 | Rejected-Technical Not Provided Self attested copy of proper supporting documents from any authentic sources to support the grow light specification as provided in BOQ (Sl. No. 12) |
Tender Value
₹51.9 L
EMD Value
₹1.0 L
Closing Date
26 Mar 2024, 3:30 pmClosed
DIRECTOR, NISER
DIRECTORATE, NISER.
Supply, Installation, Testing and Commissioning of Centralized Cooling and Dehumidification in Green House of NISER campus, Jatni.
2023_NISER_776375_2
NISER/MECH/AC/GH/2023-24/12
Open Tender
Machineries/ Mechanical Engg Items
Works
90 days
NISER, JATNI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.0 L
15 May 2024
12 Mar 2024
27 Mar 2024
12 Mar 2024
26 Mar 2024
12 Mar 2024
Supply, Installation, Testing and Commissioning of following capacity microprocessor-based Ductable Inverter type 3 phase AC units with Scroll type compressor along with fast charge of refrigerant complete with all components, controls, inter-locking , electrical accessories i/c air cooled condenser as required. Back-up options must be available when the main console fails. Temperature to maintain between 20 - 28 degrees with humidity up to 70%. 11TR Ductable AC Unit with scroll compressor with copper coil. Preferred make, Carrier, LG or Diakin
Supplying, Installation, Testing and Commissioning of hard drawn copper tube duly insulated by nitrile rubber insulation including cutting , bending , jointing, brazing etc. complete with 9 mm thick insulation as required as instructed by EIC for suction or liquid line
Supplying, Installation, Testing and Commissioning of hard drawn copper tube duly insulated by nitrile rubber insulation including cutting , bending , jointing, brazing etc. complete with 9 mm thick insulation as required as instructed by EIC for discharge or vapour line
Supply, installation, balancing and commissioning of fabricated at site GSS sheet metal rectangular ducting complete with neoprene rubber gaskets, elbows, splitter dampers, vanes, hangers, and supports etc. as per approved specifications of following sheet thickness complete as required. Site fabricated GSS sheet metal rectangular ducting as per IS 655-2006. 0.63 mm
Supply, installation, balancing and commissioning of fabricated at site GSS sheet metal rectangular ducting complete with neoprene rubber gaskets, elbows, splitter dampers, vanes, hangers, and supports etc. as per approved specifications of following sheet thickness complete as required. Site fabricated GSS sheet metal rectangular ducting as per IS 655-2006. 0.80 mm
Supplying and fixing of 25 mm thickness duly laminated aluminium foil of mat finish closed cell nitrile rubber (Class 'O') insulation on existing duct after applying suitable adhesive for Nitrile rubber. The joints shall be sealed with 50 mm wide and 3 mm thick self-adhesive nitrile rubber tape insulation complete as per specifications as required.
Providing plumbing work for drainage requirements i/c supply of CPVC pipe, fittings such as bends, reducer, elbows, tees, unions, flanges, including insulation of piping with 6 mm thick nitrile Insulation sleeve etc. as Required. Preferred make – Astral, Supreme or Oriplast
Supplying & fixing of powder coated extruded aluminium supply air grills with aluminium volume control dampers as per specifications.
Supplying & fixing of powder coated extruded aluminium supply air grills with louvers but without volume control dampers as per specifications.
Supplying & fixing testing commissioning of supply diffusers of powder coated aluminium with aluminium volume control dampers with anti-smudge ring & removable core
Supplying & fixing testing commissioning of return air diffusers of powder coated aluminium without volume control dampers with anti-smudge ring & removable core.
Heating kit/ Dehumidifier comprising strip heaters, thermostat, humidistat, safety thermostat. The minimum capacity of heaters shall be as indicated below. The heaters should be arranged in independently operating banks, in the main Return air at suitable location and the controls shall be housed in a separate factory fabricated box and complete as required. Heater capacity should cater for all seasonal variations and changes in equipment/product load from 0% to 100%. Heater bank shall be operated through Humidistat and thermostat. Heaters shall be connected in equal capacity across each phase as per following. Preferred make - GEC or equivalent. 6 KW Strip Heater for De Humidification
Supply, installation, testing and commissioning of growth room of 80 mm PUF panel with cam-lock joint with one side 0.5 mm PPGI sheet and other side 0.5 mm SS 304 sheet. PUF density: 40 +or- 2 kg/m3. Two Growth Room size: 12ftX15ftX9ft. Counter entry corridor size: 24ftX3ftX9ft. Flooring with 80 mm PUF panel with 1.2 mm anti-skid GI sheet. Provision of 5 nos hinged door of 750mmX2000mmX80mm with door view glass. Condensing and Evaporating units (Preferred make - RINAC or equivalent) of 5 KW capacity to maintain 2 to 8 Deg. C with hermetic compressor including Copper piping, insulation with nitrile rubber insulation and accessories as required including temperature controller (preferred make - Dixell or equivalent), expansion valve, charging of eco-friendly refrigerant (R-404A/ R-407C/ equivalent), Drain piping as required, electrical control panel, 4 nos. light for each room and corridor as required with separate control switch with following detailed specification - Power input 653.0 W, Spectrum Range 380-780nm at 2 meter growth height R : FR ratio minimum, 13.0 (Sellaro et al. 2010), 13.7 (Smith 1982) 14.0 (600-699/700-799 nm). Light output (380 - 780nm). 1691.27μmol/s Target Average Intensity 300.0 μmol/m2/s Calculated Average Intensity 282.38 μmol/m2/s Light Loss 23.67% Area within target intensity range (200.0 - 400.0 μmol/m2/s) [Yellow] 98.0 %Area below target intensity (< 200.0 μmol/m2/s) [Blue] 1.0 % Area exceeding target intensity (> 400.0 μmol/m2/s) [Red] 0.0 %, Heat Produced 77981.26 BTUs / 82270.23 kJ. Wiring with appropriate size of wire including Sub-panel to control panel and all accessories as required to complete as instructed by EIC
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .