Tender Value
₹3.8 Cr
EMD Value
₹7.5 L
Closing Date
21 Jul 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
TRD
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V or V/N crore, whichever is less; were V= Advertised value of the tender in crore of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet
Similar nature work: Tenderer should have experience on "Execution of any 1500V DC or 25kV AC OHE work." (Authority: GM/Elect/WR/CCG's letter No. EL/90/TRD/W/1 dated 21.01.2009)
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.
10 conditions · 9 needing a document upload
Please submit your bank details i.e. Name of the Bank along with Bank Branch Code, Account Number, IFSC Code, PAN Number, Mobile Number and e-mail address
At the time of submission of bid, if you have any special Condition then upload in scanned pdf copy.
Please furnish list of personal, organization available on hand and proposed to be engaged for the subject work.
Please furnish list of plant and Machinery available on hand own and proposed to be inducted own and hired to be given separately for the subject work.
Please furnish list of Works completed in last Seven years (Ending last day of month previous to the one in which tender is invited) giving Description of Work, Organization for whom executed, approximate value of contract at time of award, Date of award and Date of Completion. Date of actual Start, Actual Completion and Final value of Contract shall also be given.
Please furnish list of works on hand indicating description of works, contract value, Approximate value of balance work yet to be done and date of award.
Tenderer should submit valid electrical contractor license issued by electrical inspector to state government with the offer. If electrical contractor license has been expired, tenderer should submit receipt of renewal electrical contractor license issued by electrical inspector to state government with offer also. At the time of contract agreement, contractor must submit valid electrical contractor license issued by electrical inspector to state government. If tenderer have not submit the valid electrical contractor license, the offer will be summarily rejected.
The tenderer whether sole proprietor/ a company or a partnership firm / joint venture (JV) / registered society / registered trust/HUF/ LLP etc. if they want to act through agent or individual partner(s), should submit along with the tender, a copy of power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person specifically authorizing him/them to sign the tender, submit the tender, and further to deal with the Tender/Contract up to the stage of signing the agreement except in case where such specific person is authorized for above purposes through a provision made in the partnership deed/ Memorandum of understanding/ Article of Association/ Board resolution, failing which tender shall be summarily rejected.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderer must have valid Electrical contractors license in their own name or firms name, issued from state authorities for the purpose, attested copies should be submitted with the tender. For participating in tenders for a work in any state the Contractors shall have to possess electrical license of appropriate voltage issued by any State Govt. under Clause 45 of compilation of rule of Indian Electricity Rules 1956 or as amended from time to time and a copy of the same should be submitted along with the offer. They shall keep valid license throughout the period of execution of work by getting it renewed at suitable intervals and submit an attested copy of the same to the Railways after each renewal. In the event of any discontinuity in validity of electrical license of the contractor, its authority to work with Railways will also automatically cease to be valid. If the tenderers do not submit any proof for meeting with the eligibility criteria as laid downin the NIT and tender conditions, the offer will be considered as incomplete and will besummarily rejected
OHE Modification work in connection with increasing CSR of Line No 7,8,9 at Rajkot station of Rajkot division.
DRM-RJT-EL-TRD-26-27-08R1
DRM-RJT-EL-TRD-26-27-08R1
Open
Works - General
6 Months
Rajkot, Gujarat
₹0
₹7.5 L
21 Jul 2026
29 Jun 2026
7 Jul 2026
137 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 3,76,43,384.55 | ||
| — | 6.00 | — | — | ||
| Survey, Design and preparation of OHE layout plan and SED as per technical specifications | — | — | — | 1,08,311.7 | |
| — | 250.00 | — | — | ||
| Preparation of SWR diagram board along with caption diagram as per explanatory notes | — | — | — | 83,430 | |
| — | 95.00 | — | — | ||
| Supply of fabricated galvanised steel strucutre and SPS as per technical specificiations | — | — | — | 1,38,24,466.5 | |
| — | 95.00 | — | — | ||
| Erection of fabricated galvanised steel strucutre and SPS as per explanatory notes | — | — | — | 12,51,037.9 | |
| — | 300.00 | — | — | ||
| Concrete for foundation and plinth in all types of soil incl. hard/ rocky soil (incl. excavation and supply of materials viz. cement, sand and ballast) | — | — | — | 23,34,081 | |
| — | 95.00 | — | — | ||
| Supply of Single cantilever assembly complete with insulator as per technical specifications. | — | — | — | 26,03,254.6 | |
| — | 95.00 | — | — | ||
| Erection of cantilever/Bracket assembly complete with insulators as per explanatory notes | — | — | — | 2,97,697.7 | |
| — | 10.00 | — | — | ||
| Supply of regulating equipment 3 pulley type complete with all accessories as per technical specifications | — | — | — | 6,21,167.5 | |
| — | 10.00 | — | — | ||
| Erection of Regulating equipment 3 pulley type complete with all accessories as per technical specifications and explanatory notes. | — | — | — | 1,43,344.1 | |
| — | 100.00 | — | — | ||
| Supply of new droppers complete with clips etc for the new span for modification and shifting of OHE to new structure/cantilever as per technical specifications | — | — | — | 5,05,144 | |
| — | 100.00 | — | — | ||
| Modification and shifting of OHE to new structure, removal of old droppers and erection of new droppers as per explanatory notes | — | — | — | 6,12,619 | |
| — | 12.00 | — | — | ||
| Supply of section insulator assembly including core and cut in insulator as per technical specifications | — | — | — | 7,81,001.52 | |
| — | 12.00 | — | — | ||
| Erection of Section insulator assembly including core and cut in insulator as per explanatory notes | — | — | — | 91,824 | |
| — | 5.00 | — | — | ||
| Supply of material for termination of Single conductor (including supply of 9 ton cut in insulator) as per technical specifications | — | — | — | 42,970.9 | |
| — | 5.00 | — | — | ||
| Erection of material for termination of Single conductor (including supply of 9 ton cut in insulator) as per explanatory notes | — | — | — | 9,178.8 | |
| — | 10.00 | — | — | ||
| Supply of material for termination of Double conductor (including supply of 9 ton cut in insulator) as per technical specifications | — | — | — | 1,51,260.7 | |
| — | 10.00 | — | — | ||
| Erection of material for termination of Double conductor (including supply of 9 ton cut in insulator) as per explanatory notes | — | — | — | 22,945.4 | |
| — | 20.00 | — | — | ||
| Supply of Guy Rod assembly complete as per technical specification for high rise OHE | — | — | — | 2,28,012 | |
| — | 20.00 | — | — | ||
| Erection of Guy Rod assembly complete as per explanatory notes for high rise OHE | — | — | — | 44,823 | |
| — | 20.00 | — | — | ||
| Supply of 9 ton cut in insulator as per technical specifications. | — | — | — | 1,46,247 | |
| — | 10.00 | — | — | ||
| Erection of 9 tonne cut in insulator as per explanatoy notes. | — | — | — | 10,941 | |
| — | 10.00 | — | — | ||
| Supply of Post/Support insulator as per technical specifications | — | — | — | 1,09,139.4 | |
| — | 5.00 | — | — | ||
| Erection of 25 KV post/Support insulator as per technical specifications and explanatory notes. | — | — | — | 6,502.15 | |
| — | 500.00 | — | — | ||
| Supply of various types of jumpers with fittings as per technical specifications | — | — | — | 13,46,335 | |
| — | 9.00 | — | — | ||
| Supply of 25 KV single pole isolator complete with/without earthheel and jumpering arrangement as per technical specifications. | — | — | — | 8,98,928.28 | |
| — | 9.00 | — | — | ||
| Erection of 25 KV single pole isolator complete with/without earthheel and jumpering arrangement as per explanatory notes | — | — | — | 51,843.24 | |
| — | 5.00 | — | — | ||
| Supply of anti-creep arrangement as per technical specifications | — | — | — | 2,11,054.6 | |
| — | 5.00 | — | — | ||
| Erection of anti-creep arrangement as per explanatory notes | — | — | — | 29,342.3 | |
| — | 2.00 | — | — | ||
| Erection of overhead equipment including catenary, contact, jumper and dropper wires, fixing of number plates and various types of board as per explanatory notes | — | — | — | 1,60,934.16 | |
| — | 9500.00 | — | — | ||
| Supply of all types of galvanized bonds as per technical specifications | — | — | — | 31,31,770 | |
| — | 9500.00 | — | — | ||
| Erection of all types of galvanized bonds as per explanatory notes | — | — | — | 5,70,380 | |
| — | 30.00 | — | — | ||
| Supply of different types of caution boards as per technical specifications | — | — | — | 40,682.7 | |
| — | 400.00 | — | — | ||
| Supply of retro reflective number plates as per technical specifications | — | — | — | 3,52,764 | |
| — | 400.00 | — | — | ||
| Erection of retro reflective number plates as per technical specifications | — | — | — | 38,464 | |
| — | 10.00 | — | — | ||
| Supply of Earthing stations as per technical specifications | — | — | — | 48,686.4 | |
| — | 10.00 | — | — | ||
| Erection of Earthing stations as per explanatory notes | — | — | — | 17,080.6 | |
| — | 30.00 | — | — | ||
| Dismantling of mast, portal, TTC & other small part steel as per explanatory notes | — | — | — | 2,80,232.7 | |
| — | 12.00 | — | — | ||
| Dismantling and removal of Guy rod assembly and terminations as per explanatory note | — | — | — | 15,958.2 | |
| — | 150.00 | — | — | ||
| Breaking of Concrete/ foundation/PCC/ Hard rock of Mast, Portal and TTC as per explanatory notes | — | — | — | 6,02,136 | |
| — | 5.00 | — | — | ||
| Supply of materials for splicing and extension of anchors OHE as per technical specifications | — | — | — | 68,682.5 | |
| — | 5.00 | — | — | ||
| Erection of materials for splicing and extension of anchors OHE as per explanatory notes. | — | — | — | 42,613.55 | |
| — | 8.00 | — | — | ||
| Dismantling of regulating equipment as per explanatory notes | — | — | — | 67,321.68 | |
| — | 5.00 | — | — | ||
| Dismantling of Single pole isolator with complete assembly as per explanatory notes | — | — | — | 22,701.35 | |
| — | 50.00 | — | — | ||
| Dismantling of Cantilevers as per explanatory notes | — | — | — | 78,975 | |
| — | 200.00 | — | — | ||
| Supply of 130 Sq.mm copper large span wire for termination as per technical specifications | — | — | — | 2,16,730 | |
| — | 200.00 | — | — | ||
| Erection of 130 Sq.mm copper large span wire for termination as per explanatory notes. | — | — | — | 21,824 | |
| — | 40.00 | — | — | ||
| Transportation of material from Railway depot to work site or released material from work site to railway depot | — | — | — | 1,81,951.6 | |
| — | 220.00 | Each Span | — | ||
| Tower wagon checking and adjustment of OHE as per technical specifications | — | — | — | 6,07,714.8 | |
| — | 500.00 | — | — | ||
| Supply of contact wire parallel clamp small complete with fasteners RI NO.1041-2 MODB) confirming to RDSO DRG.NO.ETI/OHE/P/1040-2 MOD-E or latest revision | — | — | — | 1,50,170 | |
| — | 1500.00 | — | — | ||
| Supply of Contact wire parallel clamp groove PG 1030-3 with GI bolt 16x50x38mm with nut spring washer, as per RDSO drawing No. ETI/OHE/P/1030-3, Rev-A, RI No.1031-3 or latest revision. | — | — | — | 3,75,420 | |
| — | 100.00 | — | — | ||
| Supply of Feeder ending clamp (150) (1131,1102 &1104) & (261, washer & pin) as per drawing no. ETI/OHE/P/1130 & RDSO specification no. TI/SPC/OHE/ Fitting/ 0130 (10/13) with A&C slip no.1 or latest | — | — | — | 1,26,194 | |
| — | 200.00 | — | — | ||
| Supply of Contact Wire Ending clamp complete assembly, Clamp Body (Part No.1118- 3), Wedge (Part No.1119-3) and Part no.263 with fasteners (Split pin & washer) suitable for 107 sq. mm Contact Wire as per latest RDSO Specification | — | — | — | 68,026 | |
| — | 200.00 | — | — | ||
| Supply of CATENARY WIRE ENDING CLAMP [65 SQ.MM] with Complete assembly (PART NO.1121, 1094,1092 and 261) WITH FASTENERS (Pin & washers)AS PER RDSO DRG NO.ETI/OHE/P/1120, MOD-B or latest revision | — | — | — | 1,30,530 | |
| — | 100.00 | — | — | ||
| Supply of Catenary Splice (65 sq. mm) Conforming to Part RI- 1091,1092, 1093 & 1094 as per RDSO Drg no: ETI/OHE/P/1090 or latest. | — | — | — | 67,832 | |
| — | 100.00 | — | — | ||
| Supply of Contact wire splice toothed type complete assembly with fasteners as per RDSO Drg. -No ETI-OHE-P1080 -1- Mod-B and part Drg. no ETI-OHEP- 1081 - 1 mod C or latest. | — | — | — | 1,26,296 | |
| — | 1.00 | — | — | ||
| Supply of 25 kVA 25kV/230V auxiliary transformer with DO fuse assembly, jumper & fittings, LV box & anticlimbing device, 9-T insulator and earthing station | — | — | — | 1,55,572.79 | |
| — | 1.00 | — | — | ||
| Erection, testing and commissioning of 25 kVA 25kV/230V auxiliary transformer with DO fuse assembly, jumper & fittings, LV box & anticlimbing device, 9-T insulator and earthing station | — | — | — | 8,169.91 | |
| — | 1.00 | — | — | ||
| Dismantling of 25 kVA 25kV/230V auxiliary transformer with DO fuse assembly, jumper & fittings, LV box & anticlimbing device, 9-T insulator and earthing station | — | — | — | 8,169.91 | |
| — | 200.00 | — | — | ||
| Erection of 2x150 sqmm aluminium cable as per explanatory notes | — | — | — | 7,184 | |
| — | 1000.00 | — | — | ||
| Supply of UV Stabilized, Nylon HDPE net inside OHE structures as per latest RDSO specifications | — | — | — | 1,05,720 | |
| — | 1000.00 | — | — | ||
| Erection of UV Stabilized, Nylon HDPE net inside OHE structures as per latest RDSO specifications | — | — | — | 58,310 | |
| — | 800.00 | — | — | ||
| Supply of Anti bird Disc suitable for porcelain/composite type Bracket/stay/9- tonne insulators as per Latest RDSO specifications | — | — | — | 5,38,456 | |
| — | 800.00 | — | — | ||
| Erection of Anti bird Disc suitable for porcelain/composite type Bracket/stay/9- tonne insulators as per Latest RDSO specifications | — | — | — | 67,088 | |
| — | 300.00 | — | — | ||
| Erection of feeder wire/cross feeder wire/large span wire as per explanatory notes. | — | — | — | 32,181 | |
| — | 200.00 | — | — | ||
| Supply of Composite Stay Arm Insulator (1600 mm CD) as per RDSO specifications latest | — | — | — | 5,52,844 | |
| — | 200.00 | — | — | ||
| Supply of Composite bracket Insulator (1600mm CD) as per RDSO specifications latest | — | — | — | 5,79,070 | |
| — | 50.00 | — | — | ||
| Supply of Composite 09-Tonne Insulator (1600mm CD) as per RDSO specifications latest | — | — | — | 1,43,258.5 | |
| — | 1.00 | Lumpsum | — | ||
| Power block charges for Erection of item no. 4 7 9 11 13 15 17 19 21 23 26 28 29 37 38 41 42 43 44 46 48 61 63 64 | — | — | — | 12,08,385.91 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderDocsCSR789.pdf
ATTACHMENT
GCCApril2022.pdf
ATTACHMENT
GCCACS1to11.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .