Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹12.9 L+₹27,442.74 (2.17%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹13.4 L+₹68,279.69 (5.39%)Rejected-Finance | L3 | Rejected-Finance L3 Bidder | |
| 4 | L4₹13.5 L+₹80,334.47 (6.34%)Rejected-Finance | L4 | Rejected-Finance L4 Bidder |
| Sl No | Description | Qty | Unit | Maharoof P A L2 | NELLIKUNEL L4 | vino L1 | GEORGE K V L3 |
|---|---|---|---|---|---|---|---|
| 1.00WATER HARVESTNG STRUCTURE 15*10*3 | |||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 406.4 | cum | 240 ₹97,536.96 | 240 ₹97,536.96 | 226 ₹91,847.3 Lowest | 238.05 ₹96,744.47 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 358.13 | cum | 122 ₹43,691.62 | 122 ₹43,691.62 | 115 ₹41,184.72 Lowest | 121.06 ₹43,354.98 |
| 1.00 | OD1273/2026-2027:Dry rubble Masonry without concrete levelling course masonry with good quality blasted rubble including packing to compactiness lines and levels cost and conveyance all materials labour charges etc.. | 183.09 | cum | 3,650 ₹6,68,267.55 | 3,727 ₹6,82,365.25 | 3,503.3 ₹6,41,408.69 Lowest | 3,689.96 ₹6,75,583.71 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 43.34 | sqm | 310 ₹13,436.64 Lowest | 360 ₹15,603.84 | 338.7 ₹14,680.61 | 356.81 ₹15,465.57 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 25.61 | cum | 9,300 ₹2,38,219.5 | 9,789 ₹2,50,745.24 | 9,201 ₹2,35,683.62 Lowest | 9,691.62 ₹2,48,250.85 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,111.21 | kilogram | 98 ₹1,08,899.07 Lowest | 104 ₹1,15,566.36 | 98 ₹1,08,899.07 Lowest | 103.88 ₹1,15,433.01 |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 14.25 | cum | 7,000 ₹99,750 Lowest | 7,787 ₹1,10,964.75 | 7,319.5 ₹1,04,302.88 | 7,709.39 ₹1,09,858.81 |
| 1.01 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 40 | hour | 200 ₹8,000 Lowest | 322 ₹12,880 | 302 ₹12,080 | 319.28 ₹12,771.2 |
| 1.01 | 13.71:Lettering with black Japan pint of approved brand and manufacture | 537 | per Letter per cm height | 5 ₹2,685 Lowest | 5.9 ₹3,168.3 | 5.5 ₹2,953.5 | 5.86 ₹3,146.82 |
Tender Value
₹13.5 L
EMD Value
₹33,714
Closing Date
28 Sept 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Deputy Director of Soil Conservation
Directorate of Soil Survey and Soil Conservation, 3rd and 4th Floor, Centre Plaza Building, Vazhuthacaud, Thiruvananthapuram
Renovation of Ezhamchira pond- water harvesting structure- 15 x 10 x 3m
2026_DSSC_871501_1
SOIL/DSSSC/51/2026-2027
Open Tender
Civil Works - Others
Item Rate
270 days
Meppadi panchayath Ward 3
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹33,714
Yes
14 Oct 2026
19 Sept 2026
30 Sept 2026
19 Sept 2026
28 Sept 2026
19 Sept 2026
60 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1WATER HARVESTNG STRUCTURE 15*10*3 | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 406.4 | cum | - | - |
| 1.002 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 358.13 | cum | - | - |
| 1.003 | OD1273/2026-2027:Dry rubble Masonry without concrete levelling course masonry with good quality blasted rubble including packing to compactiness lines and levels cost and conveyance all materials labour charges etc.. | 183.09 | cum | - | - |
| 1.004 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 43.34 | sqm | - | - |
| 1.005 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 25.62 | cum | - | - |
| 1.006 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,111.22 | kilogram | - | - |
| 1.007 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 14.25 | cum | - | - |
| 1.008 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 40 | hour | - | - |
| 1.009 | 13.71:Lettering with black Japan pint of approved brand and manufacture | 537 | per Letter per cm height | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1477214.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_1477214.xls
BOQ • 0.30 MB
EzhamchiraPondBidDocument.pdf
Tender Documents • 3.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .