| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹30.9 LAccepted-AOC | ₹30.9 L | 1 | Accepted-AOC Lowest bid amt |
| 2 | 2₹32.5 LRejected-Finance 916 9 AWAS VIKAS COLONY RISHIKESH | DEHRADUN | UTTARAKHAND | 248001 | ₹32.5 L | 2 | Rejected-Finance IInd Higher bid Amt |
| 3 | 3₹32.6 LRejected-Finance 2 FRIENDS ENCLAVE SHAH NAGAR P O DEFENCE COLONY DEHRADUN WORKS AT RESHAM MAJRI GURUDWARA ROAD LAL TAPPAR IND AREA RISHIKESH DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹32.6 L | 3 | Rejected-Finance IIIrd Higher bid Amt |
| Sl No | Description | Qty | Unit | UTTARANCHAL FORGINGS INDUSTRY L3 | M/S R. B. ELECTRICALS L2 | ABDUL WAHAB L1 |
|---|---|---|---|---|---|---|
| 1.00De-Centralized Material | ||||||
| 1.01 | PRC connector for AB cable 25-150 | 114 | Nos | 148 ₹16,872 | 155 ₹17,670 | 135 ₹15,390 Lowest |
| 1.02 | Bracing Clamp Top SP-55 with N/B | 85 | Nos | 375 ₹31,875 | 380 ₹32,300 | 368 ₹31,280 Lowest |
| 1.03 | PP & CLAMP WITH N&B ST POLE SP-55 | 312 | Nos | 360 ₹1,12,320 | 365 ₹1,13,880 | 357 ₹1,11,384 Lowest |
| 1.04 | STAY CLAMP FOR SP-55 WITH NUT BOLT | 60 | Nos | 310 ₹18,600 | 312 ₹18,720 | 293 ₹17,580 Lowest |
| 1.05 | Suspension Clamp With Eye Hook LT ABC Cable | 100 | Nos | 435 ₹43,500 | 440 ₹44,000 | 427 ₹42,700 Lowest |
| 1.06 | LT Clamps for Distribution Box | 64 | Nos | 225 ₹14,400 | 235 ₹15,040 | 214 ₹13,696 Lowest |
| 1.07 | Dead End Clamp with I Hook for SP-55, N&B | 48 | Nos | 450 ₹21,600 | 455 ₹21,840 | 430 ₹20,640 Lowest |
| 1.08 | Connecting cable AB cable fto DB 1 x 25 sqmm | 168 | MTR | 79 ₹13,272 | 80 ₹13,440 | 74 ₹12,432 Lowest |
| 1.09 | MCCB Box with L.T. D/B for 250 Amp | 7 | Nos | 35,900 ₹2,51,300 | 36,000 ₹2,52,000 | 35,000 ₹2,45,000 Lowest |
Tender Value
₹31.3 L
EMD Value
₹75,000
Closing Date
17 Nov 2025, 1:00 pmClosed
Superintending Engineer, EDC(U),Dehradun
Office of the Superintending Engineer, EDC(U),Dehradun
Installation of New Transformer at different Places under EDSD Anarwala/Rajpur Road for rectification of low Voltage Issues.
2025_UPCL4_88619_1
Tender No. 24/EDC(U)/2025-26
Open Tender
Electrical Works
Item Rate
60 days
as per tender specificaiton
as per tender specificaiton
4 documents required · 4 mandatory
₹2,360
Executive Engineer, ETD(U),Dehradun
₹75,000
27 Jul 2026
3 Nov 2025
17 Nov 2025
4 Nov 2025
17 Nov 2025
6 Nov 2025
Amount
De-Centralized Material
PRC connector for AB cable 25-150
Bracing Clamp Top SP-55 with N/B
PP & CLAMP WITH N&B ST POLE SP-55
STAY CLAMP FOR SP-55 WITH NUT BOLT
Suspension Clamp With Eye Hook LT ABC Cable
LT Clamps for Distribution Box
Dead End Clamp with I Hook for SP-55, N&B
Connecting cable AB cable fto DB 1 x 25 sqmm
MCCB Box with L.T. D/B for 250 Amp
AL. CRIMPING TYPE LUGS 120 SQ.mm
AL. CRIMPING TYPE LUGS 35 SQ.mm
IPC L-L 120 -120 sq.mm
Piercing Conductor 120-35sqmm
Connecting Cable XLPE Al. 1 x35 sqmm
Shacle Insulator 100 x 115 mm with N &B
DIST. BOX WITH N&B ABCABLE 3PH-8WAY
Al to Al connector AB Cable 95 to 16 mm
Al to Al connector AB Cable 95 to 95 mm
IPC line to DB 20 -25 sq.mm
Insulated PRC (IPC 95-95 sqmm)
LT Clamp SP-21 with Nut and Bolt
LT Clamps for PCC pole with N&B
LT Clamp with N&B ST Pole SP-55
Al cramping type lugs 400 sqmm
Dead End Clamp with I Hook AB Cable SP-21
125 MCCB 4 Pole
Lugs type 95 to 120 sqmm
LT Shackle insulator 75 x 65 mm
LT XLPE cable 1 x 35 sqmm
LT ACB Panel 800 A with metering CT and Box
Labour
CHEMICAL EARTHING
ERECTION OF EARTHING ROD
FABRICATION OF STEEL
EXCAVATION OF PIT FOR STAY SET
ERECTION OF 11 KV STAY SET
GROUTING OF STAY SET
EXCAVATION OF PIT FOR POLE
ERECTION OF SINGLE SP-55 POLE
ERECTION OF SP-55 Double POLE
GROUTING OF POLE
MUFFING OF POLE
INSTALLATION OF 100 KVA DTR on Pole Structure
FIXING OF TPMO
FIXING OF FUSE SET
DISMANTLING OF LIGHTING ARRESTOR
FIXING OF LT FUSE SET
ERRECTION OF BRACKET IN 11 KV LINE
LAYING OF RABBIT CONDUCTOR IN HT LINE
GUARDING OF LT/11 KV LINE
T-OFF CONNECTION COMPLETER 11 KV LINE
CARTAGE SP-55 POLE, 0-20 KM
CARTAGE OF PETTY MATERIAL,0-20 KM
CARTAGE OF 100 KVA DTR,0-20 KM
LAYING OF LT XLPE ABC 3 X 120 +1 X95 +1 X16 sqmm
INSTALLATION OF MCCB WITH BOX AT DTRS
SUPPLY AND FIXING 3PH DISTRIBUTION BOX
CARTAGE AND HEAD LOAD CARTAGE OF MCCB ETC
EARTHING OF MCCB
LAYING OF 1 X 120 SQMM XLPE CABLE
LAYING OF LT PVC CABLES (>150 SQMM)
LAYING OF WEASAL CONDUCTOR IN HT LINE
DISMENTALING OF 25 KVA DTR
CARTAGE OF 250 KVA DTR, 0-20 KM
CARTAGE OF 16/25 KVA DTR, 0-20 KM
DISMANTLAING OF XLPE AB Cable 3 x 25 + 25 sqmm
BACK CARTAGE OF PETTY MATERIAL,0-20 KM
LAYING & SAGGING OF LT XLPE CABLE 95 SQMM
SPECIAL EARTHING
DISMENTALING OF SP-55 DOUBLE POLE
DISMENTALING OF 11 KV LINE (RACCON)
Dismentaling of 100 KVA DTR
INSTALLATION OF 250 KVA DTR ON POLE STRUCTURE
LAYING OF RACCOON CONDUCTOR IN HT LINE
DISMENALTING OF LT XLPE ABC 3 X 95+ 1 X 70+ 16 SQMM
DISMENTALING OF LT PVC CABLE OF DTR
DISMENTALING OF EXISTING FUSE SET
DISMENTALING OF OLD/DEFECTIVE LT ACB/MCCB
LAYING & SAGGING OF LT XLPE CABLE 1 X 400 sqmm
LAYING & SAGGING OF LT XLPE AB CABLE 3 X95 + 1 X 70+16 sqmm
ERRECTION OF SP-23 DOUBLE POLE
CARTAGE SP-21/23 POLE, 0-20 KM
MAKING OF T/F BASE
EARTHING OF ABC
SUPPLY AND FIXING LT ACB AMP
NSI_SPECIAL EARTHING
INSTALLATION OF LT PRMC
INSTALLATION OF DIGITAL MCCB
LAYING OF AB CABLE OF SIZE 120 SQMM
INSTALLATION OF ABC LT DISTRIBUTION BOX
SUPPLY AND FIXING SUSPENSION CLAMP I HOOK
M/S R. B. ELECTRICALS (BID ID -406522)
UTTARANCHAL FORGINGS INDUSTRY (BID ID -406493)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tendercoverpage24.pdf
Tender Documents • 0.19 MB
Tenderdocuments24PDF.pdf
Tender Documents • 1.56 MB
PQR242025.xls
Tender Documents • 0.03 MB
BOQ_105133.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].