| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.9 LAccepted-AOC AROOR P O ALAPPUZHA KERALA 688534 | ALAPPUZHA | ALAPPUZHA | KERALA | 688534 | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹45.7 L+₹3.8 L (9.13%)Rejected-Finance | L2 | Rejected-Finance Second Lowest |
Tender Value
₹37.4 L
EMD Value
₹50,000
Closing Date
1 Aug 2019, 5:00 pmClosed
CE REES KSEBL
Chief Engineer Renewable Energy and Energy Savings KSEBL Ninth Floor Vydyuthi Bhavanam Pattom Thiruvananthapuram 695 004 Kerala
Appointment of EPC contractor for design as per site conditions supply installation of Grid Tied Rooftop Solar PV Power plants on turnkey basis at ATTINGAL MUNCIPALITY Phase three owned by Attingal Municipality with an installed capacity of 56kWp
2019_KSEB_284354_1
KSEBL_REES_ATTINGAL MUNICIPALITY PHASE 3_2019 20
Open Tender
Solar Power Plants
Turn-key
180 days
Attingal Govt HSS
Appointment of EPC contractor for design as per site conditions supply installation of Grid Tied Rooftop Solar PV Power plants on turnkey basis at ATTINGAL MUNCIPALITY Phase three owned by Attingal Municipality with an installed capacity of 56kWp
8 documents required · 8 mandatory
₹5,900
online
₹50,000
Yes
Thiruvananthapuram
20 Mar 2020
1 Jul 2019
5 Aug 2019
2 Jul 2019
1 Aug 2019
9 Jul 2019
2 Jul 2019 - 8 Jul 2019
8 Jul 2019
Total price for the design, planning, investigation, survey, engineering, manufacture/procurement, manufacturer’s quality assurance, shop testing (including type testing where specified/required), transportation, handling storage, erection including all civil/structural works, electrical and general works, piping, cabling, instrumentation, installation, testing and commissioning, training, services, permits and insurance at all stages, and all related works for connectivity, Statuatory Inspection & Testing, Additional work/Cabling for Power Evacuation and works related with Single Phase to Three Phase Conversion and installation of Power evacuation transformers if required, in the location,UG cabling from Inverter room to Power Evacuation Transformer Structure and executing everything necessary to complete the project sucessfully in all respects to its full satisfaction for the Grid-tied 56 kWp (in single location) solar photovoltaic system on the rooftop of buildings under Attingal Municipality -Phase -III and handing over the SPV Plants to KSEBL after proving the performance ratio(AC) as detailed in clause 2.2.3 of volume 1 of the tender document.
Description of Work / Item(s)
O & M Charges for first year.
O & M Charges for second year.
O & M Charges for third year.
O & M Charges for fourth year.
O & M Charges for fifth year.
Description of Work / Item(s)
Total price for the design, planning, investigation, survey, engineering, manufacture/procurement, manufacturer’s quality assurance, shop testing (including type testing where specified/required), transportation, handling storage, erection including all civil/structural works, electrical and general works, piping, cabling, instrumentation, installation, testing and commissioning, training, services, permits and insurance at all stages, and all related works for connectivity, Statuatory Inspection & Testing, Additional work/Cabling for Power Evacuation and works related with Single Phase to Three Phase Conversion and installation of Power evacuation transformers if required, in the location,UG cabling from Inverter room to Power Evacuation Transformer Structure and executing everything necessary to complete the project sucessfully in all respects to its full satisfaction for the Grid-tied 56 kWp (in single location) solar photovoltaic system on the rooftop of buildings under Attingal Municipality -Phase -III and handing over the SPV Plants to KSEBL after proving the performance ratio(AC) as detailed in clause 2.2.3 of volume 1 of the tender document.
Total price for Operation and Maintenance (O & M) charges of the Solar Photovoltaic Power Plant for a period of 5 year including arrangement of cost of replacement of all the defective parts, consumables, tools, tackles, testing equipments & instruments, manpower, all administrative work, maintenance of records and submissions to all concerned authorities for the 56 kWp in single location of Attingal Municipality buildings including all taxes as per GST, covered under Guarantee period for a period of 5 years from the date of handing over.
SOLGEN ENERGY PRIVATE LIMITED
SOLGEN ENERGY PRIVATE LIMITED
SOLGEN ENERGY PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .